Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 01, 2021 SAM #7061
SOLICITATION NOTICE

Z -- Flathead NF, Hungry Horse RD, Lions Lake Dam Rehab

Notice Date
3/30/2021 8:52:02 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Flathead National Forest HUNGRY HORSE MT 59919 USA
 
ZIP Code
59919
 
Solicitation Number
1240LU21R0002
 
Response Due
5/14/2021 1:00:00 PM
 
Archive Date
05/29/2021
 
Point of Contact
Rita Loper, Phone: 208714-1211, Patrick Siers, Phone: 4067585347
 
E-Mail Address
rita.loper@usda.gov, patrick.siers@usda.gov
(rita.loper@usda.gov, patrick.siers@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Flathead NF, Hungry Horse Ranger District, Lions Lake Dam Rehabilitation involves rehabilitation of the Lion Lake south dam and raising the embankment on the north dam. Work at the south dam includes rehabilitation of the upstream embankment slope to re-contour and smooth the grading and adding riprap for wave action erosion protection. The outlet shaft/spillway structure will be modified to core a weir into the wall, replace vertical slide gate, add new upstream vertical slide gate, rehabilitate exposed concrete surfaces, and rehabilitate existing handrail. Work at the Outlet Pipe requires replacement of the downstream outlet pipe, removal and disposing of concrete retaining structure at the downstream end of the outlet pipe, adding rock riprap erosion control downstream of the outlet pipe, and slipline the interior upstream outlet pipe. The Contractor will need to raise the embankment crest of the dam, shifting the centerline of the embankment crest downstream. The Downstream Embankment will be rebuilt with a flatter embankment fill slope and have toe drains and chimney drains installed. The Parking Lot will have existing damaged areas patched and repaired, and a slurry seal coat will be added. The north will be rehabilitated by raising the embankment crest to same elevation as south dam. Project is located 1.5 miles south of Hungry Horse, Montana. The project site can be reached by turning south off or US Hwy 2 on to MT State RTE 15516 (the paved road to Hungry Horse Dam) for 1.5 miles. The road is also known locally as Forest Service primary road no. 895 and is named the Westside Reservoir Road. Period of Performance estimated July 15 � October 30, 2021. Estimated price range between $500,000 - $1,000,000.� Solicitation expected to be issued on or around April 14, 2021.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a58d4fd3554140fba520a4e424e24ac8/view)
 
Place of Performance
Address: Hungry Horse, MT 59919, USA
Zip Code: 59919
Country: USA
 
Record
SN05957125-F 20210401/210331083203 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.