Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 02, 2021 SAM #7062
SOLICITATION NOTICE

R -- Phase 0 Engineering Services

Notice Date
3/31/2021 1:18:20 PM
 
Notice Type
Presolicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
FA8525 AFLCMC WLSK ROBINS AFB GA 31098-1670 USA
 
ZIP Code
31098-1670
 
Solicitation Number
FA8525-21-R-0002
 
Response Due
4/16/2021 1:00:00 PM
 
Archive Date
05/01/2021
 
Point of Contact
Aliscia Pitts, LaKesia Dawson
 
E-Mail Address
aliscia.pitts@us.af.mil, lakesia.dawson@us.af.mil
(aliscia.pitts@us.af.mil, lakesia.dawson@us.af.mil)
 
Description
***This effort is intended to be a sole source�requirement.*** This effort will be�to provide engineering and technical consulting services for the RMCD prototype phase as a part of a larger Agile RMCD Development Team consisting of AFLCMC/WLS C-5 System Program Office (SPO) personnel, 402nd Software Engineering Group (SWEG)�personnel, and a third-party hardware supplier who is producing prototype RMCD hardware and software through a separate rapid acquisition program. The overall objective of this effort is for� the contractor to provide technical experts to the RMCD Agile Development Team, to produce a hardware and software prototype architecture that is suitable for transition into the RMCD Engineering and Manufacturing Development (EMD) phase.�� The Contractor shall identify and prioritize high-risk technical requirements relative to the integration of the RMCD prototype into the C-5M aircraft and develop engineering plans to meet those requirements.� The Contractor shall include an analysis of specific technical items shown below and shall deliver the results of the engineering planning and technical analysis as a section in the RMCD Integration Plan incrementally at the end of each sprint and deliver the final documentation by second to last sprint.�� The Contractor shall create C-5M specifications and requirements or manage changes to existing C-5M specifications and requirements generated by the RMCD program. The Contractor shall provide qualified C-5M engineering representatives to participate in supplier qualification testing led by the C-5M SPO and 402nd�SWES.� The Contractor shall review the test report from an installation suitability and airworthiness perspective and provide a written assessment. The Contractor shall deliver the results of their assessment as a written section in the RMCD Integration Plan incrementally at the end of each applicable sprint and deliver the final written assessment documentation in the RMCD Integration Plan by the second to last sprint.�� This action will result in the award of a C-type contract consisting of a 6 month period of performance. The contract will include cost plus fixed fee (CPFF)�and cost plus no fee (CPNF)�contract line items (CLINs). The period of performance is projected to be from May 2021 - October�2021. All questions and responses concerning this notice shall be emailed to aliscia.l.pitts@us.af.mil by the response date on the this synopsis.�
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/3513c32018d74ec7aa164d1bb8d6bbc1/view)
 
Place of Performance
Address: Marietta, GA, USA
Country: USA
 
Record
SN05958540-F 20210402/210331230100 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.