SOLICITATION NOTICE
Y -- CO FTBR Crystal Dam (1), East Portal Access Road
- Notice Date
- 4/6/2021 2:21:18 PM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF21B000004
- Response Due
- 4/6/2021 1:00:00 PM
- Archive Date
- 04/21/2021
- Point of Contact
- Jorey Deml, Ryan Phillips
- E-Mail Address
-
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
- Description
- THIS IS AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. PROJECT DETAILS: CO FTBR Crystal Dam(1) East Portal Access Road The East Portal Access Road is located in Montrose County, Colorado.� The road begins at the intersection with State Highway 347 at the entrance station to the Black Canyon National Park about 6 miles north of US-50. The road continues for 6.85 miles to the northeast where it terminates at the gate to the Crystal Dam facilities road.� The Bureau of Reclamation (BOR) maintains the road for access to its Crystal Dam and Power Plant and to the recreational facilities along the Gunnison River.� The 21-foot wide road was originally constructed in 1973 and has had no major maintenance projects other than a chipseal done in 2015.�� The roadway pavement is generally in fair to poor condition. The road has been segmented into three sections based on priority and condition.� The upper section from mileposts 0.0 to 2.2, the middle section from mileposts 2.2 to 5.3 and the lower section from mileposts 5.3 to 6.8.�� The middle section is characterized by steep grades of up to 16%, tall rock cuts (with rockfall problems), poor geometrics, and poor pavement conditions.� The focus of the project will be the first 5.3 miles. The scope of the project would be to pulverize and overlay the pavement 5 miles and reconstruct 0.3 miles.� The major items of work will include paving, rock excavation (blasting) and rock removal (scaling), rockfall protection, cleaning the ditches and culverts, and full depth reclamation and paving. SIGNIFICANT QUANTITIES: Schedule A: 20401-0000 Roadway Excavation: 14,500 CUYD 26001-0000 Rock Bolt: 200 LNFT 26002-000 Rock Dowel: 100 LNFT 30202-2000 Roadway Aggregate, Method 2: 3,500 TON 30401-5500 Full Depth Reclamation, Method 2, 8-Inch Depth: 4.890 Mile 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, �-Inch or �-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 30,000 TON: 11,500 TON 623032-0100 Special Labor, Slope Scaling: 150 Hours 63401-0300 Pavement Markings, Type B, Solid (White): 110,000 LNFT 63401-0300 Pavement Markings, Type B, Solid (Double Yellow): 110,000 LNFT 65101-1000 Draped Rockfall Protection, Wire Mesh: 2,250 SQYD 65101-2000 Draped Rockfall Protection, Cable Net: 5,000 SQYD Anticipated Schedule The anticipated advertisement date is�April 2021.� Construction is anticipated from May 2021 to�September 2021. Funding The estimated cost range is between $4.5 million and $5.5 million. This will be a full and open competition.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/7d07137da2114cc4af09858704bf7717/view)
- Place of Performance
- Address: Montrose, CO 81401, USA
- Zip Code: 81401
- Country: USA
- Zip Code: 81401
- Record
- SN05963619-F 20210408/210406230114 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |