MODIFICATION
Z -- SAMO & WOOLSEY FIRE
- Notice Date
- 4/9/2021 1:20:47 PM
- Notice Type
- Solicitation
- NAICS
- 562910
— Remediation Services
- Contracting Office
- PWR GOGA(86000) SAN FRANCISCO CA 94123 USA
- ZIP Code
- 94123
- Solicitation Number
- 140P8421R0003
- Response Due
- 5/10/2021 4:00:00 PM
- Archive Date
- 05/25/2021
- Point of Contact
- Chico, Elizabeth, Phone: (530) 595-6113, Fax: 202 3712090
- E-Mail Address
-
Elizabeth_Chico@nps.gov
(Elizabeth_Chico@nps.gov)
- Small Business Set-Aside
- SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Description
- REMEDIATION AND SITE CLEAN UP AT SANTA MONICA MOUNTAINS NATIONAL RECREATION AREA, VENTURA AND LOS ANGELES COUNTIES, CALIFORNIA The National Park Service, Santa Monica Mountains National Recreation Area, has a requirement for site remediation throughout nine areas of the park. The Contractor shall provide all supervision, labor, materials and equipment necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Per FAR 36.204 the project range is estimated to be between $500,000 and $1,000,000. The North American Industry Classification System (NAICS) Code for this requirement is 562910, with a corresponding size standard of $22 million in annual gross receipts for the past three years. This acquisition is a Service Disabled Veteran Owned Small Business Set-Aside (SDVOSB). Offers are solicited only from total SDVOSB concerns. Offers received from concerns that are not SDVOSB concerns shall not be considered. The work of this contract consists of supervision, labor, tools, and equipment necessary to load, haul, accept, process, record, reduce, and provide final disposal of remaining soils that exceed preliminary remedial goals for nine areas throughout the recreation area. The work includes but is not limited to loading, hauling, accepting, processing, recording, reducing, and providing the final disposal of remaining soils that exceed preliminary remedial goals. The work also includes returning designated sites to current finish grade with compacted imported fill, filling interior of remain building footprint to a grade high enough for water to not pond, placing multiple inches of mulch, installing no-go fencing, installing silt fencing, removal and disposal of multiple tons of asphalt driveways, and removal and disposal of multiple tons of steel bridging. The Contractor shall provide all manpower, equipment, testing, and supplies to perform the remediation and related services as identified within the specifications document and any additional documents or requirements. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. Site Visits will be by appointment only- see Section L for more information.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/c86f7822094a480db272e07120bfd18c/view)
- Record
- SN05967320-F 20210411/210409230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |