Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 14, 2021 SAM #7074
SOLICITATION NOTICE

Y -- Trunkline and IOI Rehabilitation Phases 1-3

Notice Date
4/12/2021 2:57:17 PM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
INTERNAT. BOUNDARY AND WATER COMM. El Paso TX 79902 USA
 
ZIP Code
79902
 
Solicitation Number
191BWC21R0002
 
Response Due
4/20/2021 2:00:00 PM
 
Archive Date
05/05/2021
 
Point of Contact
Carmella L. Speer, Phone: 9158324119, Sylvia Grindstaff, Phone: 9158324121
 
E-Mail Address
carmella.speer@ibwc.gov, sylvia.grindstaff@ibwc.gov
(carmella.speer@ibwc.gov, sylvia.grindstaff@ibwc.gov)
 
Description
A00009 The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below: Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16). Revised Technical Specifications. See Specifications page 3 for list of all changes. The proposal due date remains unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ A00008 The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below: 1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ A00007 The purpose of Amendment 00007 is to: 1.����������� Post a last additional question and answer received against the solicitation (missed in prior amendment). 2.����������� Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list. 3.����������� Revised Technical Specifications. See Specifications page 3 for list of all changes. Proposal due date remains unchanged. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A00006 The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below: Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list. Revised Technical Specifications. See Specifications page 3 for list of all changes. Post the additional questions and answers received against the solicitation. Attach all available manhole photos. Attach TCE agreements finalized to date. NOTE: Manhole photos are available at the following link: https://www.ibwc.gov/Files/MH_Photos.zip The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ A00005 The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list. Post the questions and answers received against the solicitation. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021. Revised drawings for Phases 1 and 3. Revised Technical Specifications. See Specifications page 3 for list of all changes. Attach the sign in sheet from the site visit. Attach the Pre-proposal Key Points for Contractors. Attach all available CCTV videos. Link to videos contained within the attached amendment. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report. Rio Rico sewer line drawings and photos. UPRR Maintenance Consent Letter for USIBWC permit. Various UPRR guidelines required. Flow reports from the NIWTP for calendar year 2020. All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice. ---------------------------------------------------------------------------------------------------------------------------------------------------------------------- Amendment A00004 The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below: 1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule. 2. Addition of Solicitation attachments. See Solicitation Section J. 3. Revised Technical Specifications. See Specifications page 2 for list of all changes. 4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings See attached SF 30, revised solicitation, and specification documents for further information ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment A00003 The purpose of Amendment 00003 is to notify all potential offerors of the following changes: Revised proposal submission date to 3/29/2021. See Solicitation SF-1442. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06. A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment A00002 The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment A00001 The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement. ---------------------------------------------------------------------------------------------------------- The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet. See solicitation and attachments for further details.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/643de97ad7cc4ec4807af476f5032368/view)
 
Place of Performance
Address: Rio Rico, AZ 85648, USA
Zip Code: 85648
Country: USA
 
Record
SN05969120-F 20210414/210412230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.