Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 19, 2021 SAM #7079
SOLICITATION NOTICE

Y -- FY21 DLA DESC1904 Upgrade Fuel Wharf, DFSP Tsurumi, Japan

Notice Date
4/17/2021 5:48:52 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Japan APO AP 96338-5010
 
ZIP Code
96338-5010
 
Solicitation Number
W912HV-21-R-0002
 
Response Due
8/3/2021 10:00:00 PM
 
Archive Date
11/04/2021
 
Point of Contact
Jiro Miyairi, Phone: 0464078837, Tristin N. Suetsugu, Phone: 0464073398
 
E-Mail Address
jiro.miyairi.ln@usace.army.mil, tristin.n.suetsugu.civ@usace.army.mil
(jiro.miyairi.ln@usace.army.mil, tristin.n.suetsugu.civ@usace.army.mil)
 
Description
UPDATE April 18, 2021: PRE-PROPOSAL SLIDES ARE BEING PROVIDED. Note, PRE-PROPOSAL SLIDES are unofficial and non-binding. *Amendment 0001 has been issued on 18 March, 2021.� Refers to attachments below. PROJECT INFORMATION Project Title: FY21 DLA DESC1904 Upgrade Fuel Wharf Project Location: DFSP Tsurumi, Japan North American Industry Classification System (NAICS) Code: 237990, Other Heavy and Civil Engineering Construction Project Magnitude: Between �2,500,000,000 and �10,000,000,000 (Japanese Yen) Project Description: This project will modernize the existing berthing facilities at OU-1 by constructing a reinforced concrete fuel handling wharf, mooring dolphin and supporting facilities. The fuel handling wharf and mooring dolphin will be reinforced concrete platforms supported on steel pipe piles. The wharf structures will accommodate fully loaded T-1 class tankers and coastal barges. The wharf extension includes fuel piping, two bollards and two fuel loading arms. Provide a steel platform above the wharf deck around the two fueling arms with access stairs at each end. A mooring dolphin will be provided at the southeast corner of the wharf with a steel catwalk for personnel to access the dolphin from the wharf. One bollard will be installed on top of the dolphin. Rubber arch-type fender systems will be provided with the new fuel handling wharf and mooring dolphin for absorption of the ship�s berthing energy. The fuel handling wharf will include a containment curb. Two manual marine loading arms will be provided on the new fueling wharf to receive / issue JP-8 product. Fuel transfer piping and piping components from the marine loading piping manifold will be provided to connect to existing JP-8 fueling systems. The marine loading arms will be 200 mm (8-inch) nominal size. Positive displacement stripper pumps will be provided to empty each loading arm. New 200 mm (8-inch) stainless steel fuel transfer piping and piping components will be provided to connect the marine fuel loading arms to the existing JP-8 fuel piping systems. The fuel transfer piping will also tie into a new static dissipater additive injection system storage tank using the existing injectors. Three stationary motorized spill containment boom reels and four tide risers for use with oil containment booms will be provided. A new concrete pad will be provided for each boom reel.� A steel sheet pile toe wall with concrete infill will be provided along the existing OU-1 seawall. The deteriorated concrete overpour along the existing seawall on the east side of the project will be removed and the concrete seawall will be repaired. The existing separation of the seawall on the southeast corner will be repaired.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/8860520d67204865bd3045db603d0aa2/view)
 
Place of Performance
Address: JPN
Country: JPN
 
Record
SN05975399-F 20210419/210417230101 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.