SOLICITATION NOTICE
48 -- 48--VALVE ASSEMBLY,MANI
- Notice Date
- 4/26/2021 12:16:48 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010421QFB37
- Response Due
- 5/24/2021 12:00:00 AM
- Archive Date
- 06/08/2021
- Point of Contact
- Telephone: 7176052379
- E-Mail Address
-
SCOTT.YOUNGBLOOD@NAVY.MIL
(SCOTT.YOUNGBLOOD@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N743.30|WVD|717-605-2379|SCOTT.YOUNGBLOOD@NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A|N/A |SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|332919|750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD-|1|| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed here in. 3.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Weld procedure and qual data 120 days adc LT Approval of weld procedures and qual data 60 days after receipt Final delivery of material (460 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3 Specification Revisions - The specification revisions listed under ""Docu ments References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.1 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.3.2 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;S1E10203 99517 G B S3C10053 99517 C B S3C10054 99517 D B V3E10103 99517 H B V3D10436 99517 E B V3D10425 99517 F B V3D10424 99517 D B F3C10321 99517 C B WI-S1E10203 99517 A B PTP-S1E10203-06 99517 NC B V2D11982 99517 C B DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B138 | | | |110101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-A182 | | |A |191101|A| | | DOCUMENT REF DATA=ASTM-A240 | | | |200715|A| | | DOCUMENT REF DATA=ASTM-A574 | | | |120401|A| | | DOCUMENT REF DATA=ASTM-A581 | | |B |950910|A| | | DOCUMENT REF DATA=ASTM-A582 | | | |170315|A| | | DOCUMENT REF DATA=ASTM-F606 | | | |191115|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 5643 | | |V |180101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-18240 | | |F |000313|A| 1| | DOCUMENT REF DATA=MIL-V-24272 | | |B |950424|A| 1| | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=SAE AMS-QQ-S-763 | | |D |150301|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | | |950801|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 ;Complete PRESSURE REDUCING MANIFOLD ASSEMBLY to be in accordance with VACCO Drawing S1E10203, Assembly Part Number S1E10203-06, with VACCO document WI-S1E10203, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: ;Vacco Drawing S1E10203, Assembly Part Number S1E10203-06 (Manifold Assembly); Part - ;BODY, Item No. 1; Material - ;SAE AMS-QQ-S-763, Class 304 CONDITION A or alternative ASTM A182, Class 304 or ASTM A240, Class 304; Part - ;FILTER CAP, Item No. 2 and TUBE, Item No. 8; Material - ;ASTM-A582 Type 303; Part - ;PORT ADAPTER (INLET), Item No. 3; PORT ADAPTER (OUTLET), Item No. 7; INLET, THREAD PIECE, Item No. 12; and OUTLET, THREAD PIECE, Item No. 13; Material - ;SAE AMS 5643, condition H-1025; Part - ;SOCKET HEAD CAP SCREWS, SELF LOCKING, Item Nos. 23, 27, 28, 29, 30, 31, 32, and 34; Material - ;SAE AMS 5643, condition H-1025 with self locking element per MIL-DTL-18240; Part - ;PLUG, Item No. 4; Material - ;ASTM-A581 Type 303 or ASTM-A582 Type 303; ;Vacco Drawing S3C10053, Assembly Part Number Vacco Drawing S3C10053-01 (Gage Connector); Part - ;BODY, Item No. 1; Material - ;SAE AMS-QQ-S-763 300 series or ASTM-A582 300 series; Part - ;STEM, Item No. 2; Material - ;SAE AMS 5643, condition H-1025 with self locking element per MIL-DTL-18240; ;Vacco Drawing S3C10054, Assembly Part Number Vacco Drawing S3C10054-01 (Pressure Bleed Block); 3.3 ;Note 6 of drawing S3C10054 should reference MIL-DTL-18240, Type N in lieu of MIL-F-18240, Configuration A.; Part - ;BODY, Item No. 1; Material - ;ASTM-A582 300 series or SAE AMS-QQ-S-763 300 series; Part - ;STEM, Item No. 2; Material - ;SAE AMS 5643, condition H-1025 with self locking element per MIL-DTL-18240; ;Vacco Drawing V3E10103, Assembly Part Number Vacco Drawing V3E10103-02 (Pressure Regulator Assembly); Part - ;POPPET, Item No. 4 and GUIDE, Item No. 17; Material - ;SAE AMS 5643, condition H-1025; Part - ;SEAT RETAINER, Item No. 2 and SOCKET HEAD CAP SCREWS, SELF LOCKING, Item No. 28; Material - ;SAE AMS 5643, condition H-1025 with self locking element per MIL-DTL-18240; Part - ;RETAINER, Item No. 5; Material - ;ASTM-A582 Type 303; Part - ;SEAT PLATE, Item No. 10; Material - ;SAE AMS 5643, condition H-1150; Part - ;DOME CAP, Item No. 21; Material - ;SAE AMS-QQ-S-763 Class 304 Condition A; Part - ;PLUG, Item No. 29 and BLEED PLUG, Item No. 30; Material - ;SAE AMS-QQ-S-763 Class 304 Condition A with self locking element per MIL-DTL-18240; ;Vacco Drawing V3D10436, Assembly Part Number V3D10436-01 (Loading Block Assembly); Part - ;BODY, Item No. 1 and ORIFICE BLOCK, Item No. 2; Material - ;SAE AMS-QQ-S-763 Class 304 Condition A; Part - ;SEAT, Item 3; Material - ;ASTM-B138, C67500 or alternative material ASTM-B150, UNS C62400 or ALLOY C63200; Part - ;STEM, Item No. 5; Material - ;SAE AMS 5643, condition H-1025; Part - ;GLAND, Item 6; Material - ;ASTM-B138, ALLOY C67500 half hard; ;VACCO Drawing V3D10425, Assembly Part Number V3D10425-01 (Inlet / Bypass Valve Assembly); Part - ;BONNET, Item No. 4; Material - ;ASTM-A582 Type 303; Part - ;POPPET, Item No. 3; Material - ;SAE AMS 5643, condition H-1025; ;VACCO Drawing V3D10424, Assembly Part Number V3D10424-01 (Outlet Valve Assembly); Part - ;BONNET, Item No. 1; Material - ;ASTM-A582 Type 303; Part - ;ORIFICE BLOCK, Item No. 2 and POPPET, Item No. 3; Material - ;SAE AMS 5643, condition H-1025; ;Vacco Drawing F3C10321, Assembly Part Number F3C10321-225 (DP Indicator Assembly); Part - ;BODY, Item No. 1 and BONNET, Item No. 4; Material - ;ASTM-A582 Type 303; Part - ;ADJUSTING SCREW, Item No. 9; Material - ;ASTM-A582 Type 303 with self locking element per MIL-DTL-18240; Part - ;PISTON, Item No. 2; Material - ;SAE AMS 5643, condition H-1025; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below. Test - ;5x Visual Magnification or Dye Penetrant Inspection (root layer); Item - ;Weldments; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; Test - ;Visual Inspection (final layer); Item - ;Weldments; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; 3.5 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. 30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes. Test - Intergranular Corrosion Test (Only for SAE-AMS-QQ-S-763, Classes 304-condition A, 304L, 316-condition A, 316L, 317-condition A, 321 and 347 material. Test must be performed prior to fabrication/machining) Item - ;Parts requiring material certification; Performance - SAE-AMS-QQ-S-763 Acceptance - SAE-AMS-QQ-S-763 Test - ;Quality Conformance Tests, paragraph 4.4 of MIL-V-24272; Item - ;Each manifold; Performance - ;In accordance with PTP-S1E10203-06; Acceptance - ;In accordance with PTP-S1E10203-06; Test - ;Liquid Penetrant Inspection; Item - ;all socket head cap screws requiring material certification; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 3.6 Wedge Tensile Test Specimens (Headed fasteners) - A wedge tensile test must be conducted on a Full Size Fastener for each production lot and reported aspart of the Mechanical Properties. The required specimens for the Wedge Tensile Test must be separate fasteners from those required for the Yield Test. 3.6.1 Testing for Socket Head Cap Screws must be in accordance MIL-DTL-1222, paragraphs 4.5.2.3 and 4.5.2.3.1. 3.6.2 Testing for all other Headed Fasteners with a nominal diameter greater than 1/4-inch must be in accordance with ASTM-F606 for grades 5, 8, B7, and B16.For all other grades, the following wedge angles must be used. a. Except as specified in item c below, fasteners with a nominal diameter of 1/4-inch through 1-inch (inclusive) must be tested with a ten degree wedge. b. Except as specified in item c below, fasteners with a nominal diameter over 1-inch must be tested with a six degree wedge. c. Fasteners that are of grades 8, B7, B16, 410, 416, 416Se, 431, and 630 and are threaded within one diameter to the underside of the head must be tested as follows: Sizes 1/4 inch through 3/4 inch (inclusive) Use a six degree wedgeSizes over 3/4 inch Use a four degree wedge d. Fasteners which have passed testing with wedge angles greater than those specified should be considered acceptable. 3.6.3 For fasteners having a length less than the minimum specified in Table 1 of ASTM-F606, one ""test specimen fastener"" must be manufactured from each lot of fasteners and tested to represent that lot. The length of these test specimen fasteners must meet the minimum specified in table 1 of ASTM-F606 but must not exceed it by more than 1/4 inch. Test specimen fasteners must be the same type, style, and diameter as the production lot and must be manufactured from the same starting material, using the same manufacturing techniques as the production lot, and must be heat treated (if required) along with the production lot. 3.7 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 887355432; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type ""C"" on brass or Type ""H"" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.8 Welding or Brazing - When welding, brazing, and allied processes are required, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.9 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.11.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.12 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.12.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.12.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/ 3.12.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.13 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.14 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.15 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.16 See CDRLs DI-MISC-80875 (Welding Procedures) and DI-MISC-80876 (Weld Procedure Qualification Data) - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds. 3.16.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.16.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ""WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC."" ""WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ.""). Authority for the repair of Special Repairs in castings and authority for the repair of wrought or forged material must be obtained from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.16.3 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 48 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 48 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.16.4 When drawings require hard facing surface Iron content (Nickel for Monel valves) not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.16.5 Qualification requirements for production hardfacing: The maximum qualified thickness for hardfacing must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT (Non-Destructive Testing) and any additional drawing requirements. The minimum qualified thickness is the final machined thickness at which hardness testing, NDT, macro-etch, and any additional drawing requirements are satisfactorily performed. 3.16.6 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.16.7 Qualification requirements for production cladding: The maximum qualified thickness for cladding must be twice the weld deposit thickness measured in the as-welded condition that is subjected to initial NDT and any additional drawing requirements. The minimum qualified thickness is the final machined thickness at which NDT, side bends, macro-etch testing, and any additional drawing requirements are satisfactorily performed. 3.16.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.16.9 See CDRL DI-MISC-80678 (Consumed Weld Metal) - A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.16.10 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.17 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.17.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.17.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.17.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.17.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.17.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.18 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.18.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.18.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.19 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: ""A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."" 3.19.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.19.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.19.3 The prime contractor must ensure that the purchased product conformsto specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.19.4 The prime contractor must evaluate the requirements of the contracta...
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/3ecb30595d57415f987428e737194754/view)
- Record
- SN05983062-F 20210428/210426230111 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |