Y -- Advanced Notice Maintenance Dredging of New York Harbor, Sandy Hook Federal Navigation Channel

Notice Date
4/28/2021 1:33:39 PM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
New York New York NY 10278-0090
 
ZIP Code
10278-0090
 
Solicitation Number
W912DS21B0013
 
Response Due
5/13/2021 1:00:00 PM
 
Archive Date
05/28/2021
 
Point of Contact
sandra schenning, Phone: 9177908177, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
sandra.l.schenning@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil
(sandra.l.schenning@usace.army.mil, Nicholas.P.Emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York Harbor, Sandy Hook Federal Channel. The dredged material would be placed for future beneficial use the Sea Bright Offshore Borrow Area (SBOBA), approximately 5 miles southeast of Sandy Hook Point, NJ; or at a contractor furnished state approved upland site. The proposed maintenance dredging would remove approximately 250,000 cubic yards of sand from Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material is expected to consist primarily of sand and gravel. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material. Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the placement site is located. The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than thirty-two (32) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day. The work is estimated to cost between $1,000,000 and $5,000,000. Plans and specifications for the subject project would be available in July 2021, with bid opening in August 2021. It is the intention of the government to award in August 2021 and issue the NTP in September 2021. Liquidated Damages of $2,935.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/02a465316c25440e9e75242ba960aeae/view)
 
Place of Performance
Address: Highlands, NJ 07732, USA
Zip Code: 07732
Country: USA
 
Record
SN05985312-F 20210430/210428230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.