Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 30, 2021 SAM #7090
SOLICITATION NOTICE

Y -- CA FTFS 0007(1) Fibreboard Road

Notice Date
4/28/2021 8:09:53 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF21B000009
 
Response Due
5/20/2021 1:00:00 PM
 
Archive Date
06/20/2021
 
Point of Contact
Leslie Karsten, Sheri Walsh
 
E-Mail Address
CflContracts@dot.gov, cflacquisitions@dot.gov
(CflContracts@dot.gov, cflacquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT NUMBER: CA FTFS 0007(1) PROJECT NAME: Fibreboard Road PROJECT DESCRIPTION: The project is located on Fibreboard Road (Forest Route 07) in Tahoe National Forest, California.� Fibreboard Road is located west of State Route 89, approximately 15 miles north of the intersection of State Route 89 with Interstate 80 in Truckee, California. The Forest Service (Tahoe National Forest) maintains Forest Route 07, also known as Fibreboard Road, in Sierra County, California. The road begins at State Route (SR) 89 just outside the Forest boundary and continues in a southwest-west direction for about 16.3 miles across the Forest to Jackson Meadows Reservoir. The road currently suffers from significant thermal cracking, rutting, and potholing due to severe winter weather and the presence of snowplows on a portion of the route. The purpose of the project is to improve the roadway surface and reduce yearly maintenance costs.� Funding for the project is through a combination of FHWA�s Federal Lands Transportation Program and Forest Service funds. The project includes reconstructing 2.51 miles of Forest Route 07, beginning at the eastern Forest boundary near SR 89. An additional 0.68 miles of the road continuing west may also be improved if funding is available. Road reconstruction would consist of pulverizing the existing asphalt and adding crushed aggregate base. Some sections of the roadway may require full depth reclamation which involves blending asphalt emulsion or Portland cement with the pulverized material to provide an adequate structural layer.� The roadway would then be paved to match the existing roadway width. All work would occur within the existing roadway. In addition, the road would be striped and signs may be replaced, as needed. No drainage improvements or other work is anticipated. Staging areas would be identified along the road or in previously disturbed areas, such as existing pull-outs, approved for such use by the Forest Service. Construction is planned for summer 2021 and would likely take about 4-6 months. All work would remain on the existing roadway bench, and no vegetation removal or new disturbance beyond the roadway is planned. Construction equipment anticipated to be used includes: pulverizer, asphalt truck, spreader, compacter, dump truck, skid-steer, backhoe loader, motor grader and excavator. The contract will be advertised with a Bid Schedule (Schedule A) and 2 Bid Options (Option X and Y). SIGNIFICANT QUANTITIES: Schedule A: Full Depth Reclamation with Cement, 6-Inch Depth � 29,500 SQYD Asphalt Concrete Pavement � 5,000 TON Option X: Full Depth Reclamation with Cement, 6-Inch Depth � 5,300 SQYD Asphalt Concrete Pavement � 920 TON Option Y: Full Depth Reclamation with Cement, 6-Inch Depth � 3,430 SQYD Asphalt Concrete Pavement �755 TON COST RANGE: The proposed project is estimated at a cost between $2.5 million and $4 million. CONSTRUCTION DURATION: Construction is anticipated from June, 2021 thru October, 2021.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/6c62dcc355474a259aa4a882a8ad195a/view)
 
Place of Performance
Address: Truckee, CA, USA
Country: USA
 
Record
SN05985645-F 20210430/210428230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers