Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 16, 2021 SAM #7106
SPECIAL NOTICE

Y -- Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Project - Industry Day

Notice Date
5/14/2021 10:39:00 AM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-8175 USA
 
ZIP Code
32207-8175
 
Solicitation Number
W912EP21Z0010
 
Response Due
5/18/2021 12:00:00 PM
 
Archive Date
06/01/2021
 
Point of Contact
Tiffany Tatham, Phone: 904-232-2158, James T. Tracy, Phone: 9042322107
 
E-Mail Address
tiffany.tatham@usace.army.mil, james.t.tracy@usace.army.mil
(tiffany.tatham@usace.army.mil, james.t.tracy@usace.army.mil)
 
Description
Central Everglades Planning Project (CEPP), Everglades Agricultural Area (EAA), A-2 Reservoir Contract 10A Project, Palm Beach County, FL Solicitation No. W912EP21R0024 INDUSTRY DAY DATE: ����������� Thursday, 20 May 2021 TIME:������������ 1:00pm Eastern Time LOCATION:�� WebEx Presentation (A Slide show will be posted via amendment).� All interested parties must contact Ms. Tiffany Tatham at tiffany.tatham@usace.army.mil & Mr. James Tracy at James.T.Tracy@usace.army.mil no later than the 18th of May 2021 by 3:00pm EST. �The link to access the Industry Day presentation will be posted via this announcement prior to 12:00pm EST on the 20th of May 2021.� Failure to contact Ms. Tatham & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the CEPP EAA A-2 Reservoir Contract 10A Project requirement.� All interested Offerors are required to access BetaSam.gov for future updates. DESCRIPTION OF PROJECT:� The Scope of Work for this project includes the construction of approximately 7.2 miles of parallel open channels (canals) as well as a maintenance road with benches between the canals.� The northern most canal (seepage canal) will have a bottom width of 10 feet, 2.5H:1V side slopes, and an approximate depth of 16.5 feet below natural ground surface.� The southernmost canal (Inflow/Outflow canal) will have a bottom width of 55 feet, 2.5H:1V side slopes, and an approximate depth of 16.5 feet below natural ground surface.� The maintenance road and benches will separate the seepage and Inflow/Outflow Canals by approximately 65 feet and will have a minimum crest width of 14 feet approximately 4.5 feet above natural ground surface.� Work will also include the crushing, processing, and stockpiling of excavated material within the project construction limits.� Work may also include construction of or modification to site access from U.S. Hwy 27 as well as the construction and maintenance of haul roads and associated site drainage features.� All lands for this project are owned by the South Florida Water Management District (SFWMD) and provided to the USACE for construction of these project features. Location of Project The CEPP EAA A-2 Reservoir Contract 10A project is located in Palm Beach County. �Draft plans for location and vicinity maps will be provided prior to industry day. Specific Project Challenges The site is underlain by a layer of limestone that varies in thickness.� Blasting will be required for the contract.� Also, site access is limited and will be shared with other (multiple) contractors. Environmental Conditions Contractor is required to remain within the construction limits in order to minimize wetland impacts. Plans and Specifications Draft Plans of�this project for industry consumption will be provided prior to Industry Day.� Draft specifications may be added to this posting on a later date. ADDITIONAL INFORMATION REQUIRED: Provide an email to Ms. Tatham at tiffany.tatham@usace.army.mil�& Mr. James Tracy at James.T.Tracy@usace.army.mil to include the information listed below: Your Company Name Point Of Contact Company Address Phone Number Email Address Duns Number Cage Code Offeror shall identify their size classification and Small Business Size: _ Large Business _ Small Business _Small Disadvantage Business _ 8(a) Small Business _ HUBZone _ SDVOSB _WOSB Your email Subject line should be addressed as �Industry Day Request � (Company Name) - CEPP EAA A-2 Reservoir Contract 10A Project� in order to ensure all requests are handled in a timely manner.� The required information is due in house to Ms. Tatham & Mr. Tracy no later than 18 May 2021 at 3:00pm EST.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/627a6b9d3b1e40b39dcd6173a83f56fd/view)
 
Place of Performance
Address: FL, USA
Country: USA
 
Record
SN06002160-F 20210516/210514230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.