SOLICITATION NOTICE
Y -- Add Cathodic Protection to Nautilus Pier
- Notice Date
- 6/8/2021 12:35:13 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238190
— Other Foundation, Structure, and Building Exterior Contractors
- Contracting Office
- NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
- ZIP Code
- 23511-0395
- Solicitation Number
- ACQR_5862208
- Response Due
- 6/15/2021 11:00:00 AM
- Archive Date
- 06/30/2021
- Point of Contact
- Heather Murphy, Michael A Giangregorio, Phone: 8606944563, Fax: 8606944565
- E-Mail Address
-
heather.murphy2@navy.mil, michael.giangregorio@navy.mil
(heather.murphy2@navy.mil, michael.giangregorio@navy.mil)
- Small Business Set-Aside
- 8A 8(a) Set-Aside (FAR 19.8)
- Description
- ** This is a proposed task order under MACC Contracts Holders ML-C00048.� Only those Contractors listed in the�MACC Solicitation below will be allowed to bid on this requirement. 1. Asturian Group, Inc (N40085-16-D-3041) 2. Kondra & Jaquan Enterprises Inc/SAI - Joint Venture (N40085-16-3043) 3. SMART ATI/KBE Joint Venture (N40085-16-3044) 4. Tantara Corporation (N40085-16-D-3045) The scope of this project is�a Design Build Contract providing the following: 1. Site Visit: will include a meeting with the Contracting Officer and the Customer. a. Conduct structure-to-electrolyte profiles as necessary (locations to be determined on site, it appears this will require a small boat to access piles) b. Gather water depth information as necessary c. Verify bulkhead continuity (end to end) d. Take water samples for resistivity testing (required for design calculations) 2. Provide Basis of Design and Design Calculations for proposed Cathodic Protection system 3. Technical specifications for materials and installation 4. AutoCAD layout drawings of anodes with sizing, type, quantity and locations 5. General Installation Details Boat schedule for construction window:� Date may vary dependent on emergent repairs or delays of ongoing work at the dry-dock:� Contractor shall base their work on this schedule: Pier is tentatively to be turned over to the contractor by November, 1 2021. Berth shift to pier 15S: Week of 18 October 2021 Docking:� 30 November 2021 Undocking: 26 April 2022 Berth shift back to Museum Site: Late May/Early June 2022 All work shall be completed by 1 May 2022, estimated at 270 calendar days after contract award.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/c28dde8182c84558a86c454adc8f6f42/view)
- Place of Performance
- Address: Groton, CT 06340, USA
- Zip Code: 06340
- Country: USA
- Zip Code: 06340
- Record
- SN06025116-F 20210610/210608230104 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |