SOLICITATION NOTICE
Y -- Child Development Center, Sheppard AFB, TX
- Notice Date
- 6/8/2021 10:06:37 AM
- Notice Type
- Presolicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
- ZIP Code
- 74137-4290
- Solicitation Number
- W912BV21R0039
- Response Due
- 6/23/2021 12:00:00 PM
- Archive Date
- 07/08/2021
- Point of Contact
- Lindsey M Byfield, Phone: 9186697070, Julie S. Hill, Phone: 9186697699
- E-Mail Address
-
Lindsey.M.Byfield@usace.army.mil, julie.s.hill@usace.army.mil
(Lindsey.M.Byfield@usace.army.mil, julie.s.hill@usace.army.mil)
- Description
- Pre-solicitation Notice�For Child Development Center Sheppard AFB, Texas This is a PRE-SOLICITATION NOTICE for the construction project consisting of the design-build construction of a new child development center at Sheppard AFB, Texas. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS.� No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers � Tulsa District has been tasked to solicit for and award a contract for the design-build construction of a new child development center at Sheppard AFB, Texas. The proposed project will be a competitive, firm-fixed price, two-phase design-build contract procured in accordance with FAR 15, Negotiated Procurement using the trade-off process. Project Description: This project will be a design-build construction project for an approximately 29,000 square foot child development center, including FEMA Storm Shelter and playground and supporting infrastructure. Demolish the existing adjacent CDC that is 22,057 SF.� Construction plans and building information model up to 35% Design will be provided, including topographic survey and geotechnical report.� Construction includes reinforced concrete foundations, concrete floor slab, split faced concrete masonry unit facade and a standing seam metal roof. The project includes all utilities, site improvements, pavements, detection /protection features, security enhancements and other supporting work necessary to make a complete and useable facility.� Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01. In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $39.5M. This requirement will be solicited as unrestricted.�� Estimated duration of the design phase of this project is 190 calendar days, and the construction phase of is 540 calendar days. Anticipated solicitation issuance date for Phase 1 is on or about 23 June 2021, and the estimated proposal due date will be on or about 23 July 2021.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/746d67a07f85411593ee6ab5c4a32850/view)
- Place of Performance
- Address: Wichita Falls, TX, USA
- Country: USA
- Country: USA
- Record
- SN06025129-F 20210610/210608230104 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |