Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 10, 2021 SAM #7131
SOLICITATION NOTICE

Z -- Design-Bid Build Repair Project of AUTEC Pier, Facility 1902 at Andros Island, Bahamas

Notice Date
6/8/2021 7:21:36 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVFAC SOUTHEAST JACKSONVILLE FL 32212-0030 USA
 
ZIP Code
32212-0030
 
Solicitation Number
N6945021R0028
 
Archive Date
09/30/2023
 
Point of Contact
Alex Noriega, Phone: 9045426704, Rebecca Jones, Phone: 9045426315
 
E-Mail Address
alex.noriega@navy.mil, rebecca.m.jones@navy.mil
(alex.noriega@navy.mil, rebecca.m.jones@navy.mil)
 
Description
Pier Repair Project, Atlantic Undersea Test and Evaluation Center (AUTEC), Andros Island, Bahamas �Project Description: This project�is for�repair of the pier located at Facility 1902, AUTEC, Andros Island, Bahamas. The existing superstructure will be removed, and the existing steel piles will be cutoff and incorporated in the repaired pier. The proposed pier repair is a closed-pier mole-type structure with a steel H-pile combination wall aligned at the existing pier�s perimeter that will retain compacted structural fill. The compacted fill will be capped with a reinforced concrete slab-on-grade deck. The new pier will abut the existing landside bulkhead. The proposed pier will include shore power, potable water, fire protection system, lighting, mooring hardware and foam filled fender system. Pier utilities will tie-in to existing landside sources. Temporary mooring for AUTEC vessels will be constructed to provide safe mooring for the vessels during construction. The temporary mooring facility will be constructed to minimize interruptions to AUTEC operations. The AUTEC pier facility is the only berthing facility located at Andros Island, Bahamas to support the AUTEC Range. Potable water and AC electric power are available at the pier. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236 204, the Construction Magnitude for this project is between $25,000,000 and $100,000,000. The period of performance for this project is approximately 730 - 955 days. The Small Business Size Standard is $39.5 million (M).
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/d0c662545f354573ac8af14e8141ca7c/view)
 
Place of Performance
Address: Andros Island, BHS
Country: BHS
 
Record
SN06025213-F 20210610/210608230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.