SOLICITATION NOTICE
16 -- 16--TRUNNION,DRAG BRACE
- Notice Date
- 6/11/2021 8:53:45 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038321QH345
- Response Due
- 7/12/2021 12:00:00 AM
- Archive Date
- 07/27/2021
- Point of Contact
- Telephone: 2156974331
- E-Mail Address
-
KYLIE.WALKER@NAVY.MIL
(KYLIE.WALKER@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N722.23|B4T|215-697-4331|kylie.walker@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.42| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|Invoice and Receiving Report Combo ||TBD|N00383|TBD|TBD|See Schedule |TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| FMS Spares Requirement 100 Percent Small Business Set Aside (SBSA) The evaluation factors are technical acceptability, past performance, and cost/price. The evaluation of proposals will consider the offerors non-price factorsas significantly more important than the offerors cost/price factor.The contract negotiator will consider performance under current contract(s) to meet the contractual delivery date and/or on time delivery of other past performance references. First Article Testing (FAT)/Production Lot Testing(PLT) required except for theOEM/Prime. If recently passed FAT/PLT please submit a wavier and approval letter(s). All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. Early and incremental deliveries accepted. 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with McDonnell Douglas Aircraft (MDA) drawing number ( ;76301; ) , ;74A450802-1009; and all details and specifications referenced therein as supplemented by MDA, as of date of contract award. Incorporation of any supplemental changes to the configuration of the item must be approved by the contracting officer. Any successful offeror is required to demonstrate, at time of contract award, a bi-lateral agreement with MDA. A copy of the bilateral agreement must be received by contracting officer by the time of contract award. Contractors are requested to note the estimated date of award in the solicitation remarks under the schedule. If the copy of the bi-lateral agreement with MDA is not received as specified in the solicitation remarks under the schedule, then your offer will not be considered for the instant award. 1.2 The bilateral agreement with MDA shall provide for the following: 1.2.1 MDA Certification in accordance with the appropriate CDRL that the offeror has in its possession complete technical data representing the latest configuration including all engineering orders, changes in design, etc. and that such data are used in manufacture of the part, purchased under this contract. MDA review, disposition and certification of all Material Review Board actions, requests waivers and deviations and any requests for acceptance of material non-conformities. MDA review and approval of Process/Operation Sheets and MDA participation, performance, review and approval of First Article inspection, as detailed in Section C of this solicitation/contract. 1.2.2 Certification is required that all critical processes to include acquisition of forging/castings have been procured from MDA approved source(s) in accordance with the appropriate CDRL. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, templates, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 Quality/Inspection Requirements 1.4.1 MIL-Q-9858A/AQAP-1 applies: Refer to contract Section E. 1.4.2 First Article/First Production Lot Inspection: Refer to contract Section C. 1.4.3 Mandatory Inspection applies: Refer to contract Section C. 1.5 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. MIL-W-22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with MIL-STD-2000A. Personnel performing tasks in accordance with MIL-STD-2000A shall be trained and certified as requried by MIL-STD-2000A paragraph 5.1.4. 1.7 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.8 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.9 . Markings shall be in accordance with MIL-STD-130, revision level ""L"" or latest revison, and IAW the drawing requirements. 1.10 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 2. APPLICABLE DOCUMENTS DRAWING DATA=74A450802-1009 |76301|^^| |A| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 During production mandatory inspection is required to be accomplished by the contractor as follows: 4.1.1 Verification that the first piece of each lot run on a machine for a specific part will be checked to 100% dimensions of print. Every sixth piece thereafter shall be checked 100% to print. 4.1.2 All final Inspection Method Sheets (IMS) shall be validated by a government authorized inspector for all sub components and final assembly. This is to be accomplished by random sampling of characteristics. 4.1.3 In cases where functional testing is required, the U.S. Government authorized Inspector shall validate 100% of the final functional tests reports performed to MCAIR acceptance test procedures for FSCM/CAGE ( ;76301; ), part number, ;74A450802-1009; , in accordance with Acceptance Test Plan ;N/A; . 4.1.4 Material verification - the U.S. Government authorized inspector shall verify that the material certification is in accordance with the appropriate drawing. 4.1.5 Verification via random inspection of surface finish. 4.2 The material produced under contract shall be accepted by the cognizant U.S. Government Inspector/CAO/QAR contingent upon the successful completion of these requirements. First Article Testing shall consist of two parts. Part I shall be conducted at the successful offeror's facilities with McDonnell Douglas Aircraft (MDA) and U.S. Government personnel in attendance to witness testing. Part II will be conducted at MDA facility with the successful offeror and U.S. Government personnel in attendance. 4.3 FIRST ARTICLE TESTING REQUIREMENTS PART I (to be performed at the successful offeror's facility) A. The contractor shall perform detailed dimensional inspection of the first piece using the digital data provided by MDA. This data will be used to inspect the first piece with results being compared to results of an inspection of the model provided by MDA using the same testing facilities and equipment. All testing shall be witnessed by U.S. Government personnel, as well as MDA personnel. The PCO shall be provided notification not later than 30 days prior to date that the First Article is scheduled to insure proper U.S. Government personnel availability. B. Compliance with drawing ( ;76301; ) , ;74A450802-1009; latest revision and specifications referenced therein. C. Function - in accordance with MDA Acceptance Test Procedures where applicable per MDA supplied data package D. Dimensional check of detailed parts prior to assembly to include forging prior to machining E. Review of documentation as provided under CDRL (DD1423) requirements. F. Review of the following documentation: Process/Operation Sheets Critical Process Certification Completed Inspection Method Documents Material Certifications: Documentation certifying that the material used in manufacture of the items is in accordance with the applicable drawing and material specification including test results. Forging: Documentation certifying that only the MDA approved sources were used for critical processes including forging/casting(s) for the item and that all test/inspections required in the material specification were complied with, including test reports. G. MDA review of First Article and certification in accordance with the applicable CDRL is required. 4.4 . FIRST ARTICLE TESTING REQUIREMENTS PART II (To be conducted at MDA facilities) A. The contractor shall provide for the first article piece to be inspected by MDA personnel at MDA facilities in order to verify and correlate test results using the digital data provided by MDA. This testing shall be witnessed by U.S. Government personnel. B. Certification/report of findings shall be provided by MDA in accordance with CDRL. 4.5 . PRODUCTION LOT TESTING A. The production lot sample(s) shall be selected at random by the cognizant Government inspector (DCMAO/QAR). The samples shall be identified by contract number, lot number and be clearly marked as follows: PRODUCTION LOT TEST SAMPLES NOT RFI MATERIAL DO NOT TAKE UP IN STOCK B. Such samples shall be tested in sufficient time prior to the delivery date of the production articles to allow a 60 day period for testing and written notification by the contracting officer of the approval or disapproval of the samples. Within 45 days of the receipt of the samples, the CAO shall notify the contracting officer, Naval Inventory Control Point, ATTN: (See Block 10.a. of SF33 for name and code) of the results of the testing, together with a recommendation for approval or disapproval. C. In the event the contractor does not receive written notification of approval, conditional approval, or disapproval of the samples for a particular production lot within 60 days from their submission for such testing, the contract delivery schedule shall be equitably adjusted as necessary. D. If the contractor fails to deliver any production lot samples for testing within the time or times specified, or if the contracting officer disapproves any production lot samples, the contractor shall be deemed to have failed to make delivery within the meaning of the Default Clause of this contract, and this contract shall be subject to termination for default. E. In order for a production lot to be acceptable, all samples representative of the lot must pass all of the contract requirements. In the event a sample fails to pass such requirements, the lot will be rejected. In such event, the Government may, at its option and at no additional cost to the Government, (I) terminate all or any portion of this contract for default, (II) require the manufacture of a new production lot, or a rework of the rejected production lot if the means and procedures proposed by the contractor for rework are acceptable to the Government, or (III) require the submission of additional samples for test. The foregoing procedures shall apply to new or reworked production lots in the same way as they did to the original production lot. F. For each additional sample or each resubmission of a modified sample which the contractor is required to submit for approval hereunder as a result of the failure of a previous sample to conform to the requirements of the specifications, the contractor shall pay to the Government the costs of reinspection, shipping, examination and retesting, and the contractor and his sureties (if any) shall be liable for the amount of such costs. G. All transportation charges incurred in the submission and return of any production lot sample shall be borne by the contractor. H. Nothing contained in the foregoing provisions of this clause, and no action of the Government in accordance herewith, shall in any way prejudice the right of the Government under the clause of this contract entitled Default. I. One each sample from the first production lot shall be subjected to a 100% dimensional inspection at the contractor's facility witnessed by U.S. Government and MDA personnel. J. The contractor shall perform detailed dimensional inspection of the production lot sample using the digital data provided by MDA. All testing shall be witnessed by U.S. Government personnel, as well as MDA personnel. The PCO shall be provided notification not later than thirty (30) days prior to the date Production Lot Testing is scheduled to insure proper U.S. Government personnel availability. K. Compliance with drawing ( ;76301; ) ;74A450802-1009; latest revision and specifications referenced therein. L. Function - In accordance with MDA Acceptance Test Procedures where applicable per MDA supplied data package M. Dimensional Check of detailed parts prior to assembly to include forging prior to machining. N. Review of documentation as provided under CDRL (DD1423) requirements O. Review of the following documentation: Process/Operation Sheets Critical Process Certification Completed Inspection Method Documents Material Certifications: Documentation certifying that the material used in manufacture of the items is in accordance with the applicable drawing and material specification including test results. Forging: Documentation certifying that only the MDA approved sources were used for critical processes including forging/casting(s) for the item and that all test/inspections required in the material specification were complied with, including test reports. P. MDA review of Production Lot and certification in accordance with the applicable CDRL is required. In addition to the above tests, the Production Lot Samples(s) to be delivered hereunder shall also be subjected to those tests which will demonstrate that the sample(s) comply with contract requirements. 4.6 TESTING LOCATION, COST AND ESTIMATED LEADTIME A. All testing is to be accomplished at the contractor's or MDA facilities as facilitated by the successful offeror's agreement with MDA. Cost of contractor testing to be borne by the successful offeror. The contractor shall deliver ;TWO (2); unit(s) of the following (76301) part number ;74A450802-1009; as specifed in this contract ;400; DAC. B. Estimated cost for government witnessing of inspection/test is $ ;15,000.00; . The contractor shall submit the First Article Test report within ;430; calendar days from the date of this contract. Forward copies of report in accordance with Distribution cited on DD1423. Mark reports as follows:""FIRST ARTICLE TEST REPORT: CONTRACT NO. ___________________ ; LOT/ITEM NO. _______________"" . Within thirty (30) calendar days after the contracting officer receives the test report, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval or disapproval of the First Article. The notice of conditional approval or approval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval. C. If the First Article is disapproved, the contractor, upon government request, shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests. D. If the contractor fails to deliver any First Article report on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. E. Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. F. If the government does not act within the time specified in paragraph B above, the contracting officer shall, upon timely written request from the contractor, equitably adjust under the changes clause of this contract, the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. G. Before First Article approval, the Contracting Officer may, by written authorization, authorize the contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price. H. The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to this effect with each First Article. ^^ NOTE: Contractor may deliver MDA certifications for a First Article test completed by MDA and contractor under an MDA production contract in lieu of testing a first article produced under this contract, provided that the contractor provides, at least ten (10) calendar days before testing, notice to the Government, so that the Government may witness the tests, and further provides a certification that such testing under the MDA production contract is in compliance with all the first article requirements of this contract. The certifications submitted shall be treated as submitted pursuant to the first article clause of this contract and shall be approved/disapproved as set forth in that clause. 4.7 NOTIFICATION OF TESTING The contractor shall notify the PCO, ACO and QAR thirty (30) days prior to conducting First Article/First Production Lot Tests so that the Government may witness such testing. The QAR shall be present to witness all First Article/First Production Lot Tests. 4.8 DISPOSITION OF FIRST ARTICLE/PRODUCTION LOT SAMPLES A. First Article Samples shall not be considered as production items due. B. Production Lot Samples may be considered as production items under the contract provided the samples can be refurbished to a Ready For Issue (RFI) condition and provided the samples have inspection approval of the cognizant QAR. Samples may be shipped as production items only after all other units required under the contract have been provided and are ready for shipment. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. / DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. / DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. / DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. / DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: Upon submission of test samples. Block 13: Subsequent submissions to be made if the process operation change after approval to include ;MDA; certification. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. / DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ Subtitle: First Article/Production Lot Report Certification Block 12: ;430; days after contract award first article test report/certification of ;MDA; approval of first article Block 13: 30 days after completion of production lot testing certification of ;MDA; approval of production lot testing Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1. DATE OF FIRST SUBMISSION=060 DAC DATE OF SUBSEQUENT SUBMISSION=010 DAYS EOM Paragraph 10, sub-paragraph 10.1 through 10.3 omit items G, Q, X, Y, Z, 10.3 A(1) and (5). DATE OF FIRST SUBMISSION=ASREQ block 6: forward additional copy to aso code cited in block 10.A on page 1. Block 12: First submission to be made upon submission of test sample./ Block 13: Subsequent submission to be made upon completion of contract. /
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/c02d7906050f440aac15d9e07d12cc1c/view)
- Record
- SN06029486-F 20210613/210611230113 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |