SOLICITATION NOTICE

Y -- New Soo Lock, New Third Lock

Notice Date
6/14/2021 2:35:02 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W072 ENDIST DETROIT DETROIT MI 48226-5000 USA
 
ZIP Code
48226-5000
 
Solicitation Number
W911XK21R0001
 
Archive Date
02/28/2022
 
Point of Contact
Sandra Kenzie, Phone: 3132266819, Travis.J.Specht@usace.army.mil
 
E-Mail Address
sandra.m.kenzie@usace.army.mil, Travis.J.Specht@usace.army.mil
(sandra.m.kenzie@usace.army.mil, Travis.J.Specht@usace.army.mil)
 
Description
The US Army Corps of Engineers, Detroit District intends on solicitating the construction of the New Soo Locks, New Third Lock Construction Contract. This contract will contain a base bid item and seven optional contract line items (CLINS). The major components of the base include mobilization, batch plant set-up, cofferdam construction, relocations, care and diversion of water necessary to get the area to a dewatered state; construction of a New Power Plant Bridge; construction of �a new shaft, Shaft 6; installation of Struts to stabilize the existing Lock walls; demolition of the existing Sabin Lock; �excavation of rock and placement of a mud mat; construction of the Wide Wall Monoliths; fabrication and installation of the Upstream Ship Arrestors; �fabricate, deliver, and install metals including miter gates and culvert valves; construction of phase one of the New Pump Well (including the demolition of the existing Davis Lock floor, rock excavation, , and construction of concrete structure to the operating floor).� Option 1 includes the construction of the majority of Chamber Wall Monoliths, including the installation of embedded and post installed metals.� Option 2 include the completion of the New Pump Well, including installation of all equipment, construction of the operating building, and rehabilitation of existing Davis and Poe pump wells. Option 3 includes the installation of air, steam, power, and hydraulic piping; commissioning and testing the miter gates, culvert valves, and Upstream Ship Arrestors; finalizing the site work; constructing the Lock Floor; and removal of the coffer cells.� Option 4 includes installing solider pile and lagging, tie-back system, concrete cap, electrical infrastructure and bollards on the Downstream Approach Wall and East Center Pier.�� Option 5 is the installation of the Hands-Free Mooring system consisting of total of seven units on the North and South Walls including� installation of dynamic units, cabling, equipment, associated software.� Option 6 is the fabrication, installation, testing and commissioning of the� Downstream Ship Arrestors. Option 7 includes excavation of rock and construction of a hybrid wall for the Alligator�s Mouth expansion of the mooring area. The anticipated duration for the base is 1642 calendar days after the notice to proceed, an additional 365 calendar days will be provided if Option 1 is exercised and an additional 365 days will be provided if Option 3 is exercised. The Government intends to exercise all options. Options 4, 5, 6, and 7 are the last options to be exercised, and may be exercised as late as 1287 calendar days after the notice to proceed. The Government intends on specifying the following as brand names or brand name or equal: Cavotec�s Hand Free Mooring System; Eaton�s Switch Gear; Pelco�s Cameras and Workstations; Schweitzer Engineering Lab�s Relays, Transmissions and Controllers; Software House�s Identive Reader and iSTAR Controller & Accessories; and Russellstoll�s Receptacles. Magnitude of the proposed construction project is over $500,000,000 Funds are not presently available for this acquisition. No contract will be made until appropriated funds are made available. �Due to the sensitivity of this project, all Solicitation materials will be provided via a secure site by the Government only to offerors that have been vetted and approved via the procedures described below. Potential offerors must submit the following prior to being able to receive solicitation materials: (1) Potential offerors must submit a letter certifying that their company is owned by US citizens, and that all personnel are US Citizens; and (2) Potential offerors must verify that their company is currently certified in the Joint Certification Program (JCP) run by DLIS. Information on this certification program is available at: https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/FAQ/. Potential offerors are encouraged to begin the registration process as early as possible as it may take 6-8 weeks for new registrants to be certified. Please submit your letter certifying that their company is owned by US citizens, and that all personnel are US Citizens verification of your JCP certification (DD 2345) �to Sandra M. Kenzie at Sandra.M.Kenzie@usace.army.mil and LRE-Proposal@usace.army.mil
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2f3c32a1f85a49e3a60df169d9f68aca/view)
 
Place of Performance
Address: Sault Sainte Marie, MI 49783, USA
Zip Code: 49783
Country: USA
 
Record
SN06030658-F 20210616/210614230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.