SAMDAILY.US - ISSUE OF JUNE 26, 2021 SAM #7147
SOLICITATION NOTICE

Z -- Detroit T1A Transformer Swap

Notice Date
6/24/2021 3:22:30 PM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N21B0020
 
Response Due
7/19/2021 11:00:00 AM
 
Archive Date
08/03/2021
 
Point of Contact
Harron Elloso, Phone: 503-808-4618
 
E-Mail Address
Harron.E.Elloso@usace.army.mil
(Harron.E.Elloso@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The U.S. Army Corps of Engineers POrtland District intends to issue a firm fixed-price (FFP) contract for the Detroit Transformer T1A Spare Installation at Detroit Dam between Linn and Marion Counties, Oregon. The requirement is to remove the existing T1A transformer from the tailrace deck vault and swap it into storage with the Government-owned spare transformer located on-site. The Government-owned spare is then to be� installed, tested, and commissioned by the Contractor in the vault space previously occupied by Transformer T1A. The scope of the project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract: a. Remove existing single-phase transformer T1A, associated cabling and conduit, oil pump, and oil/water cooling piping from the tailrace deck vault to the parking lot crane pick area while including environmental mitigation for oil removal. This will include some demolition and saw-cutting of the vault containment wall. b. Load transformer T1A onto truck for transport to storage building located within security perimeter. c. Transport transformer T1A to storage building housing the spare transformer. d.�Prepare spare transformer for removal from storage building and transport. This will include some disassembly as the spare transformer is too large for the doorway of the storage building. It will also include pre-movement inspections, tests, and removal of transformer oil prior to movement. e. Remove spare transformer from storage building and place transformer T1A into storage. f.�Transport spare transformer to picking area in front of tailrace deck, use a crane to unload it off the truck bed onto a mobile installation platform. Then place it into position at the T1A vault. This will include re-installation of components, vacuum processing and oil filling of the post-movement inspections and tests. g.�Perform complete connection of all power, control, annunciation, and appurtenances including seismic anchoring. h.�Repair concrete containment wall to pre-existing condition and provide As-Built drawings per contract specification. Contract duration is estimated to be approximately 7 months from notice to proceed (NTP). The estimated Magnitude of Construction for this project is between $500,000 and $1,000,000 Solicitation package attached.�
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f181c94c6eda4b3bbc59900d9af6fe7b/view)
 
Place of Performance
Address: Detroit, OR 97346, USA
Zip Code: 97346
Country: USA
 
Record
SN06041744-F 20210626/210624230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.