Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 11, 2021 SAM #7162
SOLICITATION NOTICE

Z -- FY21 Savannah Inner Harbor Maintenance Dredging

Notice Date
7/9/2021 8:10:42 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN21B5006
 
Response Due
8/5/2021 10:00:00 AM
 
Archive Date
08/20/2021
 
Point of Contact
Arcia E Fusi, Phone: 9126525901, Whittni C. Hiscox, Phone: 9126525476
 
E-Mail Address
Arcia.E.Fusi@usace.army.mil, whittni.c.hiscox@usace.army.mil
(Arcia.E.Fusi@usace.army.mil, whittni.c.hiscox@usace.army.mil)
 
Description
*** The Solicitation and final plans and specs are�attached.�A virtual pre-bid conference will be held on 8 July 2021 12:00 p.m. Eastern Daylight Time. Please see page 29, paragraph # 10�of attachment (B.08 W912HN21B5006 - Solicitation)*** This solicitation is for the FY21 Savannah Inner Harbor Maintenance Dredging, Savannah, Georgia. This acquisition is being offered as�full and open competion and will result in a Fixed Price Contract Award. The magnitude of this requirement per DFARS 236.204 (ii)�is between $25,000,000.00 and $100,000,000.00. Project Location: The work is located in the deep draft Savannah Harbor navigation project in Georgia. The Savannah Harbor project is located on the border of Georgia and South Carolina (SC) in Chatham County. The Savannah Inner Harbor channel is 42 ft. deep MLLW and 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW and 400 ft. wide to the upper end of Argyle Island Turning Basin; and 30 ft. deep MLLW and 200 ft. wide to the upper limit of the project. Project Description: The Savannah Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be one year from Notice to Proceed. Up to four million cubic yards of maintenance material is expected to be removed from the inner harbor. Savannah Harbor�s Kings Island Turning Basin (KITB) is the primary turning basin for large civilian and military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Approximately 1.6 million cubic yards of maintenance material is removed from the KITB annually. Current project and advance maintenance depths authorized for Savannah Inner Harbor are below. The Inner Harbor is undergoing a deepening which will alter the project depth by -5 ft. MLLW. Deepening of portions of the Savannah Inner Harbor may be completed during this contract and required maintenance dredging depth may be adjusted accordingly. Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas and designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer. All material dredged from the Savannah Inner Harbor shall be placed in upland confined disposal areas adjacent to the Savannah River, with DMCA-12A receiving the majority of the maintenance material. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B and Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A and 14B are owned by the Joint Project Office of the Georgia and South Carolina Port Authorities. Portions of DMCAs 2A and Jones/Oysterbed are owned by the Georgia Department of Transportation and the US Fish and Wildlife Service. DMCA 1N is owned entirely by the US Fish and Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window (2 weeks between approximate dates 1 April through 15 May timeframe) which limits the amount and timing of dredging above station 63+360 (River Mile 12), and a dissolved oxygen window (approximately July 1 through September 30). An environmental window also exists for sturgeon between 1 May and 30 October annually, no dredging is allowed above station 105+500, cutterhead dredging below 105+500 during those months will monitored for sturgeon take. Certain reaches of O&M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O&M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions. Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre and post hydrographic surveys, and monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations and must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor. The estimated construction duration for the FY21 Savannah Inner Harbor Maintenance Dredging is 365 calendar days after issuance of the Notice to Proceed (see attached documentation for details). This acquisition will be procured in accordance with FAR 14 (Sealed Bidding).
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/415f5c065b514b34bcb78176b921ee08/view)
 
Place of Performance
Address: Savannah, GA, USA
Country: USA
 
Record
SN06056691-F 20210711/210709230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.