SOLICITATION NOTICE
Y -- Design-Build 7th SFG Aquatic Training Center
- Notice Date
- 7/12/2021 9:35:22 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- FA2823 AFTC PZIO EGLIN AFB FL 32542-5418 USA
- ZIP Code
- 32542-5418
- Solicitation Number
- FA282321R0028
- Response Due
- 7/20/2021 12:00:00 PM
- Archive Date
- 08/04/2021
- Point of Contact
- David Clark, Phone: 850-882-3098
- E-Mail Address
-
david.clark.94@us.af.mil
(david.clark.94@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The Contractor shall design and construct the Aquatic Training Facility for the 7th Special Forces Group at Eglin AFB, FL, including salt water training pool and pool support facility to result in a complete and useable facility including all site work and applicable utilities meeting all the requirements for its intended use, installed to the highest industry standards and the requirements of the Contract Documents. A fully complete and useable system is defined as one that meets the aesthetic and functional properties required by the drawings, specifications, amendments issued prior to receipt of bids/proposals, and modifications issued after award of the contract.� Period of Performance is 365 calendar days after Notice to Proceed.� � �Statement of Magnitude is Between $1,000,000 and $5,000,000. This project will be designed/constructed to comply with the Federal sustainability requirements as detailed in UFC 1-200-02, High Performance and Sustainable Building Requirements. LEED certification is no longer required. The AF Sustainability Requirements Scoresheet will be used to track and report the initial project compliance status. Additional guidance can be found at http://www.wbdg.org/ccb/browse_cat.php?c=265.� The RFP is for seven (7) bid items, or CLINs, which includes�five (5) Bid Options for pricing.� Award of these Bid Options will be at the discretion of the Government. THE GOVERNMENT ANTICIPATES THE FOLLOWING DIVISION TO BE UTILIZED: . Base Bid: Div. 01 � General Requirements Div. 03 � Concrete Div. 04 � Masonry Div. 05 � Metals Div. 07 � Thermal and Moisture Protection Div. 09 � Finishes Div. 10 � Specialties Div. 13 � Special Construction Div. 22 � Plumbing Div. 23 � Heating, Ventilating, and Air-Conditioning (HVAC) Div. 26 � Electrical Div. 33 � Utilities Alternate - Alternate Bid Options 1 through 5 � As Offeror indicates RFP's and any/all amendments must be signed and acknowledged. Additional Information: Prospective contractors must be registered in the System for Award�Management (SAM) database prior to award of a Government contract.� Offerors are further advised that failure to register in the SAM database will�render your firm ineligible for award. Registration requires applicants to have a DUNS number and CAGE code, recommend registering immediately in order to be eligible for timely award. The solicitation will be available only via the�Internet at the following address: http://www.SAM.GOV. For information on how to register your company on SAM.GOV, to view or receive updates and�notifications to the solicitation, please reference the SAM.GOV Vendor Guide located on the SAM.GOV web site home page. NO paper copies of the impending solicitation will be furnished. Pre-Proposal Site Visit is scheduled for 17 June 2021 at 10:00 CST at DUKE FIELD - SFG Group Camp Simons (West of Hwy85 at Duke Field exit on Hwy 85) - Parking at Bldg. 4327 located at corner of Kandahar Street and El Salvador Way. To schedule for base access for attendees please send an email request to Contracting Specialist David Clark -� �david.clark.94@us.af.mil Request that all questions concerning this solicitation be submitted to the Contracting Specialist David Clark� david.clark.94@us.af.mil no later than 21 June 2021. A response to all questions will be posted on SAM.GOV by 24 June 2021. UPDATES:� 12 July 2021:� Provided a 50 Divisional XLS worksheet in attachments to aid.� �Submission of the 50 Divisional worksheet will still need to be sent along with other documents in a PDF format.� � � Reminder that the deadline for RFP submission has been extended to�20 July 2021.��Please submit requests for the DoD Safe Link in order to upload your RFP documents within 5 days of this date to david.clark.94@us.af.mil. 2 July 2021:� � Questions / Answers posted.� � �Dive platform option has been deleted.� � Reminder that the deadline for RFP submission has been extended to�20 July 2021.��Please submit requests for the DoD Safe Link in order to upload your RFP documents within 5 days of this date to david.clark.94@us.af.mil. 30 June 2021:� �Deadline for RFP submission has been extended to�20 July 2021.� � �Please submit requests for the DoD Safe Link in order to upload your RFP documents within 5 days of this date to david.clark.94@us.af.mil. 21 June 2021:� Deadline for written questions has been extended to�28 June 2021.���Extension granted to provide adequate time for prime and sub contractors to discuss project. Points of Contract for utilities on Camp Simon: ELECTRICITY: CHELCO POC: Project Coordinator� � Chris Eddy� � � 850-307-1229� �ceddy@chelco.com WATER: ASUS POC: Senior Project Engineer� �Jason Drayer� ��850-389-8773� � ��jason.drayer@asusinc.com Senior Capital Project Supervisor �(POC for Design Reviews & Questions)� �Eric Jenkins��(Office) 850-389-8773/ (Cell) 850-602-5772� �eric.jenkins@asusinc.com GAS: Okaloosa Gas POC: Market Development� � � Mark Clark� �850-974-7019� �markclark@okaloosagas.com 17 June 2021:� � � Site visit today� �-� Clarifications and additional pictures posted� as attachment labeled TAB 1A - SPECIFICATION ADDENDUM (FTFA161071) - REVISION 3 (17 Jun 2021) I will state the�design build on this contract with reference to the attached plans is to �inform� contractors of a build that meets the requirements and capabilities as stated in the Statement of Work.�� The contractor's� DOR is ultimately responsible for the final plans. The diving platform dimensions are the responsibility of the DOR � the drawing do not provide any dimension details. Section 01 10 10, Paragraph 2.2.1.3 states: �Design features that are not specifically covered by these specifications shall be determined by the Pool Designer and must demonstrate adequate safety and water quality can be maintained, based on the proposed current technology and the best information available at the time of design.� And, Paragraph 2.2.2 states: �The Design/Build Contractor's (DBC's) Designer of Record (DOR) is responsible for conducting a complete analysis of the design using all applicable life safety and building codes, UFCs and other applicable requirements referenced in this RFP in order to provide a fully code and regulation compliant final design.� The DBC's DOR shall be solely responsible for interpreting the applicable requirements and providing a code compliant final design approach.�
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/a43c466807e54c619907b2492a3f7dc2/view)
- Place of Performance
- Address: Eglin AFB, FL 32542, USA
- Zip Code: 32542
- Country: USA
- Zip Code: 32542
- Record
- SN06057969-F 20210714/210712230117 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |