SOLICITATION NOTICE
99 -- ELASTOMERIC SHOCK
- Notice Date
- 7/12/2021 3:13:27 AM
- Notice Type
- Solicitation
- NAICS
- 333999
— All Other Miscellaneous General Purpose Machinery Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038321QM379
- Response Due
- 7/15/2021 12:00:00 AM
- Archive Date
- 07/30/2021
- Point of Contact
- Telephone: 2156974313
- E-Mail Address
-
BRENDAN.DONEGAN@NAVY.MIL
(BRENDAN.DONEGAN@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N761.05|SZZ|215-697-4313|brendan.donegan@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|invoice and receiving report (combo) type|N/A|TBD|N00383|TBD|TBD|See schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|333999|500|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| THESE ITEMS REQUIRE GOVERNMENT SOURCE APPROVAL PRIOR TO AWARD. IF YOU ARE NOT AN APPROVED SOURCE, YOU MUST SUBMIT, TOGETHER WITH YOUR PROPOSAL, THE INFORMATION DETAILED IN THE NAVSUP WSS SOURCE APPROVAL BROCHURE, WHICH CAN BE OBTAINED ONLINE AT https://www.navsup.navy.mil/public/navsup/wss/business_opps/ UNDER ""COMMODITIES"". OFFERS RECEIVED WHICH FAIL TO PROVIDE ALL DATA REQUIRED BY THE SOURCE APPROVAL BROCHURE WILL NOT BE CONSIDERED FOR AWARD UNDER THIS SOLICITATION. PLEASE NOTE, IF EVALUATION OF A SOURCE APPROVAL REQUEST SUBMITTED HEREUNDER CANNOT BE PROCESSED IN TIME AND/OR APPROVAL REQUIREMENTS PRECLUDE THE ABILITY TO OBTAIN SUBJECT ITEMS IN TIME TO MEET GOVERNMENT REQUIREMENTS, AWARD OF REQUIREMENT MAY BE CONTINUED BASED ON FLEET SUPPORT NEEDS. 1. SCOPE At acceptance shock mount shall not be more than one year old (past its cure date). When discrepancies exist between these requirements and those on current Manufacturer's drawings, contact contracting officer listed on page 1 block 5 of the contract. 1.1 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code ;N241.17; or code N241.10 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;H. A. King; drawing number ( ;13008; ) ;7916; , Revision ;latest; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=7916 |13008| | |D| | | | 3. REQUIREMENTS Shock Mount Markings. Each shock mount shall be marked with its manufacturing cure date (month and year) permanently molded in the top of the mount material so as to be plainly visible when the mount is installed. Additionally the curedate (month and year) shall be stamped on the top surface of the flexing element using white waterproof ink conforming to A-A-208. Elastomericshock mounts shall be no older than one (1) year when procured. Shock mount P/N: (13008) 7916H.A. King Co., Inc.5038 Leafdale Blvd.Royal Oak, MI 48073 3.1 The shock mount listed in the drawing package (whether identified as sole source, recommended, or suggested) has been tested and approved for the shock mitigation system of this container. No other shock mount may be substituted without written permission of Naval Inventory Control Point, Philadelphia unless an alternate is specifically indentified in this contract. ;(13008) 7916; is an approved alternate mount. 4. QUALITY ASSURANCE Shock Mount Markings. Each shock mount shall be marked with its manufacturing cure date (month and year) permanently molded in the top of the mount material so as to be plainly visible when the mount is installed. Additionally the curedate (month and year) shall be stamped on the top surface of the flexing element using white waterproof ink conforming to A-A-208. Elastomericshock mounts shall be no older than one (1) year when procured. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/7e90b99fc83f4d15bac0aa2abc55c38c/view)
- Record
- SN06058531-F 20210714/210712230121 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |