Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 15, 2021 SAM #7166
SOURCES SOUGHT

99 -- RADON Mitigation Systems KAB East (64 Units)

Notice Date
7/13/2021 3:45:13 PM
 
Notice Type
Sources Sought
 
NAICS
562910 — Remediation Services
 
Contracting Office
FA5270 18 CONS PK APO AP 96368-5199 USA
 
ZIP Code
96368-5199
 
Solicitation Number
LXEZ214832
 
Response Due
8/9/2021 12:00:00 AM
 
Archive Date
10/01/2021
 
Point of Contact
Jeff Sprunger, Phone: 315-634-1140, RUBYANN S. PROUT, Phone: 81986345849
 
E-Mail Address
jeffrey.sprunger.2@us.af.mil, rubyann.prout@us.af.mil
(jeffrey.sprunger.2@us.af.mil, rubyann.prout@us.af.mil)
 
Description
SCOPE: The Contractor shall furnish all labor, materials, equipment, tools, testing, plan, design, and management upgrade or install a reliable and functional radon mitigation system for 64 housing units. - Work includes but is not limited to pre-installation inspection, gathering of relevant site data, and review of existing drawings and radon sampling data. Determine size, location, and configuration of radon mitigation systems to continuously maintain radon levels under 4 picocuries per liter (pCi/L) for the housing unit. �INSTALLATION: New system shall be completed using active soil depressurization (ASD) techniques and employ sub-slab depressurization (SSD) methods. All installed exterior hardware and components shall be corrosion resistant suitable for coastal marine environments. Provide electrical wire from new suction fan to existing circuit breaker panel board. New interior conduit shall run above ceiling as much as possible. �ASBESTOS AND LEAD BASED PAINT (LBP) SAMPLING RESULTS: Applying 40 CFR � 763.83 Homogeneous methodology (similar construction year, unit type/model, surface material, thermal system or miscellaneous material that is uniform in color and texture). All LBP samples are less than 0.5% lead by weight and Asbestos detected on 4 of 64 units, see para 1.8 and attachment test/sample results from current and past data�s. RESTORATION: The Contractor shall restore all excavated and damaged areas to same as existing adjacent surface. �POST TESTING: Following the installation of radon mitigation systems, perform radon tests in each unit in accordance with EPA Guidance (EPA 402-R-93-003). The radon test shall be a continuous monitoring system which will measure the radon levels over a minimum period of 91 days. �NO POST MITIGATION: Additional mitigation work following the Post Testing is not required on this contract. �Preparation of Final Report: Upon completion of the installation work, the Contractor shall provide a final report summarizing all field activities including conclusions and recommendations. In addition, the Contractor shall provide (either as an appendix to the final report or a separate report) operations, maintenance, and warranty information on installed systems. Include detailed photos of pre-existing conditions, work performed, and final conditions. Photos shall include unit numbers and written descriptions, as necessary.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b12d7ec477b24e1b9f554a58b478e082/view)
 
Place of Performance
Address: Okinawa, JPN
Country: JPN
 
Record
SN06060278-F 20210715/210713230125 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.