Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 16, 2021 SAM #7167
SPECIAL NOTICE

Y -- Pier Romeo Recapitalization; North Charleston, SC

Notice Date
7/14/2021 9:25:17 AM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
DEPT OF COMMERCE NOAA SILVER SPRING MD 20910 USA
 
ZIP Code
20910
 
Solicitation Number
2100393A
 
Response Due
7/19/2021 10:00:00 AM
 
Archive Date
07/20/2021
 
Point of Contact
Sherry Jones-Quashie, Traci Newsom
 
E-Mail Address
sherry.jones-quashie@noaa.gov, traci.newsom@noaa.gov
(sherry.jones-quashie@noaa.gov, traci.newsom@noaa.gov)
 
Description
This REQUEST FOR INFORMATION (RFI) is for market research purposes and does not constitute a Request for Proposal or Quotation. It is not a commitment by the Government to award a contract nor will the Government pay for any information provided.� No basis for claim against the Government shall arise as a result of a response to this RFI or Government use of any information provided.� The purpose of this notice is to inform elements of the Government�s intended source selection and solicitation process through constructive feedback from Industry. This notice in no way obligates the Government to any further action. REQUIREMENT: This notice is issued by the National Oceanic and Atmospheric Administration�s (NOAA) Acquisition and Grants Office in support of the Office of Marine and Aviation Operations (OMAO). �NOAA has a new requirement for design build (DB) construction to recapitalize the Pier Romeo facility within the Charleston Marine Support Facility in North Charleston, South Carolina (SC). CURRENT ACQUISITION STRATEGY: �The Government currently anticipates awarding a single firm fixed price DB construction contract in accordance with FAR Parts 15 and 36.� NAICS CODE/SIZE STANDARD: The applicable NAICS Code is 237990, Other Heavy and Civil Engineering�Construction, and the size standard is $39.5M. SCOPE OF WORK: The Pier Romeo facility is severely degraded and unsafe for use.� The recapitalization will enable the dock facility to support the NOAA Ships Nancy Foster and Ronald H. Brown, and other visiting NOAA vessels. The proposed action involves the demolition of derelict structures and the construction of a new pier, access trestle, and shore infrastructure and improvements to support the berthing of the Nancy Foster and Ronald H. Brown on a long-term basis.� This project will allow NOAA ships to have access to utility services at the new dock face that includes an adequate flow of potable water, black and grey water removal, oily sludge removal, along with the electrical and network service connections.� The new pier will be accessed by a new approach trestle and the new warehouse will be used to store ship supplies and equipment.� The requirement will also include dredging to allow access to the new facilities. PLACE OF PERFORMANCE: �The place of performance will be North Charleston, SC.� ESTIMATED MAGNITUDE OF REQUIREMENT: The estimated magnitude is more than $10,000,000 in accordance with FAR 36.204.� More precisely, the Government estimates the full DB requirement, inclusive of all options, to be between $30,000,000 and $40,000,000. ANTICIPATED AWARD: The Government anticipates awarding the DB contract in September 2022. ANTICIPATED PROPOSAL PREPARATION TIME PERIOD:� The Government anticipates releasing the DB construction solicitation with 15% bridging documents and providing 60 days for proposal preparation.� A pre-proposal conference and site visit will likely occur within 20 days of solicitation release. CONTEMPLATED SOURCE SELECTION STRATEGY: ��Based on considerations of proposal preparation costs as well as efficiency in source selection, the Government contemplates a single phase source selection rather than the two-phase approach described in FAR Subpart 36.3.� Further, the Government is considering the following factors for the single phase: To�be evaluated on a Technical Acceptability basis (Acceptable/Unacceptable): Factor 1:� Corporate Experience Factor 2:� Safety The Government will perform a price analysis and evaluate non-price Factors 3 and 4 for proposals receiving an Acceptable rating for Factors 1 and 2.� Factor 3: �Technical Approach (considering three elements:� Schedule, Management Approach and Technical Solution) Factor 4:� Past Performance Factors 3 and 4 will be evaluated using a 5 adjectival rating scale (i.e. Unsatisfactory - Exceptional).� Factor 3 will be considered more important than Factor 4.� When combined, Factors 3 and 4 will be significantly more important than Price.� SUBMISSION OF INFORMATION:� �All interested parties are invited to complete the Google Form at the link provided below.� All constructive responses related to the proposed source selection and overall strategy will be considered. Form submissions will be accepted through 19 July 2021 at 1000 PDT. THE GOVERNMENT WILL ACCEPT NO ALTERNATIVE SUBMISSIONS.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/18984a3dfad94cad8b13d4b9b0fdbcbd/view)
 
Place of Performance
Address: North Charleston, SC, USA
Country: USA
 
Record
SN06060675-F 20210716/210715201643 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.