Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 21, 2021 SAM #7172
SOLICITATION NOTICE

H -- Safety Survey

Notice Date
7/19/2021 8:39:38 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541350 — Building Inspection Services
 
Contracting Office
FA4861 99 CONS LGC NELLIS AFB NV 89191-7063 USA
 
ZIP Code
89191-7063
 
Solicitation Number
SafetySurvey_21
 
Response Due
7/22/2021 10:00:00 AM
 
Archive Date
07/25/2021
 
Point of Contact
Vincent Perry
 
E-Mail Address
vincent.perry.2@us.af.mil
(vincent.perry.2@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
See attachments for futher information. Version 2 of the SOW was uploaded 7/19 1. Is the building classified as fully sprinklered or just partially sprinklered ??��� Building 1300 is fully sprinkled 2. Is the sealing of fire penetrations and the testing of asbestos/lead paint (as listed in the general requirements) required for this engineering study ??? No engineering study needed. We need to identify the deficiencies and updated life safety drawing per SOW. Sample Life safety drawing (52 Page ) is provided in the shared documents �� ------------------------------------------------------------------ 7/19 Answers to Questions---------------------------------------- It is assumed survey documentation shall reference the design requirements of Chapter 14 and Chapter 6, Sections 6-8 and 6-11 of UFC 4-510-01. It is assumed other design criteria chapters or chapter sections for military medical facilities are not required to be evaluated. �Is this correct? The provided UFC guidance is for construction activities. With that said design criteria chapters or chapter sections for military medical facilities are not required to be evaluated. However, we will need to have all the new construction area needs to be included in the new life safety drawing. We are working with MATOC team to obtain the new drawings. The contractor shall incorporate all the changed floor plan and life safety information in the new drawing. The new drawing shall be similar to the sample drawing that we provided (52 Page document) It is assumed detailed hydraulic evaluations of existing sprinkler systems are not required for this survey documentation. Only installation deficiencies reported or observed are required to be evaluated. Noted. Is this correct? Yes It is assumed a detailed evaluation of the sequence of operation for the existing fire alarm/mass notification system is not required for this survey documentation. �Only installation deficiencies reported or observed are required to be evaluated. Noted. Is this correct? Yes. The General Requirements section of the Safety Survey SOW includes responsibilities associated with construction activities. Please clarify which of these requirements apply to this SOW.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/786746689d9643d1b0d3775cc92df0c8/view)
 
Place of Performance
Address: Las Vegas, NV 89115, USA
Zip Code: 89115
Country: USA
 
Record
SN06065485-F 20210721/210719230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.