Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 25, 2021 SAM #7176
SOLICITATION NOTICE

39 -- Bonneville Dam Powerhouse Two, New 65 Ton Tailrace Gantry Crane

Notice Date
7/23/2021 8:42:28 AM
 
Notice Type
Presolicitation
 
NAICS
333923 — Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
 
Contracting Office
US ARMY ENGINEER DISTRICT PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N-21-R-0020
 
Response Due
8/5/2021 7:00:00 AM
 
Archive Date
08/20/2021
 
Point of Contact
Melanie A. Barrett, Phone: 5038084617, Patrick Collins, Phone: 5038084594
 
E-Mail Address
Melanie.A.barrett@usace.army.mil, patrick.pcollins@usace.army.mil
(Melanie.A.barrett@usace.army.mil, patrick.pcollins@usace.army.mil)
 
Description
PRE-SOLICITATION FOR THE BONNEVILLE DAM POWERHOUSE TWO, NEW 65 TON TAILRACE GANTRY CRANE � SOLICITATION W9127N21R0020 The U.S. Army Corps of Engineers, Portland District has a new requirement for a New 65 Ton Tailrace Gantry Crane for the Bonneville Lock and Dam, at Powerhouse Two. The Government intends to procure this requirement on a competitive basis in accordance with the provisions as set forth in FAR Part 15, Contracting by Negotiation. A formal solicitation will follow this announcement on or around 25 June 2021.� Work Requirement: The work consists of replacing the existing 65 Ton Tailrace Gantry Crane with a New 65 Ton Tailrace Gantry Crane at the Bonneville Lock and Dam, Powerhouse 2, located� on the Washington side, at or near the Dam Access Road. This project also includes removal of the existing 65 Ton Gantry crane, replacement of the Three wire Overhead Conductor System with the Four Wire Runway Conductor system, and the design and construction of a steel guardrail.� The contractor must design, manufacture, install, test, and commissioning of the new Tailrace Gantry Crane. The Tailrace crane provides for placement of the spillway stoplogs, the penstock stoplogs, and for general servicing of the deck of the spillway. The work includes the removal of the existing Intake Crane and the replacement of the existing cable reel power supply to a conductor rail and collector system, conversion from a 3-wire to 4-wire power feed, and design and construction of a protective guardrail.� Project Background Bonneville Dam is located 145 miles from the mouth of the Columbia River, approximately 40 miles east of Portland, Oregon. A Public Works Administration project of President Franklin D. Roosevelt�s New Deal, Powerhouse 1, spillway and original navigation lock were completed in 1938 to improve navigation on Columbia River and provide hydropower to the Pacific Northwest. Powerhouse 2 was completed in 1982 and a larger navigation lock in 1993. Powerhouse 1 has 10 main units with a total rated capacity of 518 MW, and Powerhouse 2 has 8 main units with a total rated capacity of 612 MW. The Bonneville Powerhouse 2 Tailrace Gantry Crane (No. 8) was originally commissioned in the early 1980's. This crane has a 65-ton main hoist and a 15-ton auxiliary �hoist as its main features. The Gantry Crane is used for all work requiring crane support on the tailrace deck of Powerhouse 2 including handling draft tube bulkheads (tail logs), floating orifice gates (FOGs), adult fish channel stoplogs and bulkheads, and all deck hatches. Hoisted items can be transferred from one end of the tailrace deck to the other with this crane. The Contractor will be required to work closely with the Government to establish a designated work area for erection and testing of the new tailrace gantry crane that will minimize impacts on daily operations of the in Bonneville Powerhouse 2 Tailrace Gantry Crane plant. This solicitation will use a FAR Part 15.101-1 Best Value Tradeoff Process. This is a hybrid supply with construction installation contract. Acquisition will provide for Full and Open Competition. The Small Business Deputy for Portland District, Carol McIntyre, is available to answer any questions you might have; (503) 808-4602 or Carol.A.McIntyre@usace.army.mil. Primary Point of Contact:��������������������������������������� Contracting Office Address: Melanie A. Barrett������������������������������������������������������ U.S. Army Corps of Engineers Contract Specialist����������������������������������������� ����������� USACE District, Portland Melanie.A.Barrett@usace.army.mil ������������������������� PO Box 2946 Phone:� (503) 808-4617��������������������������������������������� Portland, OR 97208-2946 U.S. Place of Contract Performance: Bonneville Dam, Powerhouse 2 Cascade Locks, OR
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/90b000b480994b068d33519076464456/view)
 
Place of Performance
Address: Cascade Locks, OR, USA
Country: USA
 
Record
SN06072082-F 20210725/210723230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.