56 -- Powerhouse and Dam Pump Room Roof Replacement, Russel Dam, Elberton, Georgia
- Notice Date
- 7/23/2021 1:43:30 PM
- Notice Type
- Presolicitation
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
- ZIP Code
- 31401-3604
- Solicitation Number
- W912HN21B5004
- Response Due
- 9/9/2021 11:00:00 AM
- Archive Date
- 09/24/2021
- Point of Contact
- Amy L Collins, Phone: 9126525505, Fax: 9126525828, Whittni C. Hiscox, Phone: 9126525476
- E-Mail Address
-
Amy.L.Collins@usace.army.mil, whittni.c.hiscox@usace.army.mil
(Amy.L.Collins@usace.army.mil, whittni.c.hiscox@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This synopsis is for the Powerhouse & Dam Pump Room Roof Replacement, Russell Dam, Elberton, Georgia. This acquisition is being offereed as a 100% small business set-aside competitive solicitation and will result in a Firm Fixed�Price Contract Award. The magnitude of this requirement per FAR 36.204 is between $1M and $5M.�� Project Location: Savannah River, Richard B. Russell Lake, at the Richard B. Russell Power Project,�Elbert County, Elberton, Georgia Project Description: The contractor will complete the removal and replacement of the entire existing�two-ply Granule surfaced modified bitumen roof system and walking pads on all roof areas of the�Powerhouse/Visitor Center Building. The contractor will replace the roof with a new 90-mil 1-ply�Ethylene Propylene Diene Terpolymer (EPDM )roof system similar to Firestone EcoWhite or Carlisle�Sure-White EPDM Membrane complete with associated flashings, insulation, sheet metal components�and accessories necessary for a watertight roof system. EPDM shall be white in color to reflect solar�radiation. New roof shall provide a minimum R value of R-30. New roof system shall drain naturally�into existing drains and not hold standing water. Remove existing roof wall and curb flashings.��Remove existing EPDM on all parapet walls. Install new �� heavy duty cover board on both the�horizontal and vertical surfaces of all parapet walls of Powerhouse Roof. New 60-mil white EPDM will�be installed over the cover boards with bonding adhesive. Walkboards/Walkpads shall be included�and will match existing powerhouse layouts around HVAC units, exhaust fans, upstream and�downstream parapet wall, ladder crossovers, and roof access hatch. Firestone Rubbergard Quickseam EPDM Walkway Pads 30� x 30�, Carlisle Sure-Seal EPDM Pressure-Sensitive Molded Walkway Pads or�equivalent shall be used. Walkboards/walkpads shall also be white in color if available. Removal and replacement of entire existing insulated tar and gravel built-up roof systems on concrete�deck on Dam Pump Room. Remove existing Pump Room roof wall and curb flashings. Remove existing�roofing of all parapet walls. Install new �� HD cover board on both the horizontal & vertical surfaces of�the parapet walls of Dam Pump Room Roof area. New 60-mil white EPDM will be installed over the�cover boards with bonding adhesive. Replacement with a new 90-mil 1-ply EPDM roof system similar�to Firestone EcoWhite or Carlisle Sure-White EPDM Membrane complete with associated flashings,�insulation, sheet metal components and accessories necessary for a watertight roof system. EPDM�shall be white in color to reflect solar radiation. New roof shall provide a minimum R value of R-30.�New roof system shall drain naturally into existing drains and not hold standing�water.� Walkboards/Walkpads shall be installed on Dam Pump Room Roof from the East side of the�roof around Exhaust Fan. Firestone Rubbergard Quickseam EPDM Walkway Pads 30� x 30�, Carlisle�Sure-Seal EPDM Pressure-Sensitive Molded Walkway Pads or equivalent shall be used.�Walkboards/walkpads shall also be white in color if available. Option 1: Aluminum catwalk system spanning from the first bay to the last bay of the powerhouse roof. 48� wide, clear width between 42� high guardrails. Catwalk system steps down to roof with handrails. Steps to have 11� treads and 7� max rise. A Minimum 20-year, no dollar limit, labor & material warranty from the manufacturer shall be provided. Evaluation Criteria: The contract will be solicited and procudred using Sealed Bidding Procedures under FAR Part 14. NOTE: This solicitation will be issued in electronic format only and is anticipated to be available on or about 9 August 2021. Please note that the bid opening date will be specified in the solicitation when issued. No additional media (CD-ROM, floppy disks, faxes, etc.) will be provided. Any prospective Offeror must register in the System for Award Management (SAM) database at https://www.sam.gov. After completing SAM registration, interested Contractors and their subcontractors can obtain solicitation documents, plans and specifications for this solicitation within the same site under Contract Opportunities. Contractors that have an existing account should be able to use their exsting logins to search for the solicitation number once it is released. It is the Offeror's responsibility to check the internet address provided as necessary for any amendments that may be posted to this solicitation. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. Contractual questions should be forwarded to Contract Specialist Amy L. Collins at Amy.L.Collins@usace.army.mil or to the attention of Contracting Officer, Whittni C. Hiscox at Whittni.C.Hiscox@usace.army.mil. The contracting office address is 100 West Oglethorpe Avenue, Savannah, Georgia 31401
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/2ff705a618fd41a0a9d47f05679533ac/view)
- Place of Performance
- Address: Elberton, GA 30635, USA
- Zip Code: 30635
- Country: USA
- Zip Code: 30635
- Record
- SN06072145-F 20210725/210723230117 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |