Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JULY 27, 2021 SAM #7178
SOLICITATION NOTICE

Z -- Repair Apron Joint Sealant Scott AFB IL

Notice Date
7/25/2021 7:50:10 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W7M6 USPFO ACTIVITY ILANG 126 SCOTT AFB IL 62225-5503 USA
 
ZIP Code
62225-5503
 
Solicitation Number
W50S7S21R0001
 
Response Due
7/30/2021 11:00:00 AM
 
Archive Date
08/14/2021
 
Point of Contact
2LT Christopher Fisher, Phone: 6182225113, TSgt Benjamin James, Phone: 6182225112
 
E-Mail Address
christopher.fisher.7@us.af.mil, benjamin.james.1@us.af.mil
(christopher.fisher.7@us.af.mil, benjamin.james.1@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Mod 8:�Added 3rd�questions and answers and discussed submitting proposals. The 30th is a ""flex day"" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered. Mod 7: Added 2nd questions and answers Mod 6: Added document�AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C. Mod 5: Added 1st questions and answers. Mod 4: Added site visit notes Mod 2 and 3: Changed document permissions and uploaded revised documents. Mod 1: Added drawings. Description of Proposed Construction: The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations. The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list. See attachments for full solication details. The date for the pre-proposal conference is�13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/e6b69b7bb83c4f09b784145306c733b5/view)
 
Place of Performance
Address: Scott AFB, IL 62225, USA
Zip Code: 62225
Country: USA
 
Record
SN06072551-F 20210727/210725230108 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.