SOLICITATION NOTICE
C -- Steel columns and base plates, remove and new construction
- Notice Date
- 7/29/2021 5:27:56 AM
- Notice Type
- Solicitation
- NAICS
- 236118
— Residential Remodelers
- Contracting Office
- DOL-9 NORFOLK VA 23510 USA
- ZIP Code
- 23510
- Solicitation Number
- 2121281PMW195
- Response Due
- 8/6/2021 6:00:00 AM
- Archive Date
- 08/06/2021
- Point of Contact
- LCDR Jay Shirey, Phone: 787-729-2313, Oswald L. Mora, Phone: (787) 729-4304
- E-Mail Address
-
Jay.M.Shirey@uscg.mil, Oswald.L.Mora@uscg.mil
(Jay.M.Shirey@uscg.mil, Oswald.L.Mora@uscg.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Statement of Work 1. Description Of Work: The work includes furnishing all personnel, equipment, materials, tools, supervision, labor and other items necessary to perform the removal and disposition of the existing corroded steel columns in the designated houses. The designated houses (7 each) are the following: B6, C3, C4, H2, H3, M6 and T2. These columns are located at the first floor back balcony. The project includes the installation of new galvanized steel round columns, base plates and appurtenances as shown on the attached drawings. 2. The work consists of, but is not limited to the following: a) The existing steel columns and base plates shall be removed with all the safety and structural requirements. Remove any old concrete and clean the area to accommodate new columns and base plates. Add temporary supports as shown on reference drawings prior removal of the existing columns. See attached drawings. b) Add new steel round columns including welding, grinding, primer and two coats of paint similar color as existing. c) Add new concrete anchor bolts and base plates. See attached drawings. d) Add new non shrink grout for base plates and any additional concrete as required. See attached drawings. e) The Contractor shall repair any damage as a result of the Contractor's actions without additional cost to the Government. f) The Contractor is encourage to request a �site visit� to verify existing conditions. g) The Contractor shall protect the work areas as needed and keep them clean. h) The Contractor shall comply with all local and federal environmental requirements including the removal, recycling, reuse and/or disposition of the existing steel. Furnish and Install New Steel Columns and appurtenances at selected houses. USCG Rio Bayamon Housing Pag e 2 i) The Contractor shall provide a project schedule prior project start. j) The Contractor shall provide submittals for the new items to be installed. k) Some of the existing houses are occupied by tenants. The Contractor shall coordinate with the USCG Rio Bayamon Housing Facilities Engineering Department (FED) and the Rio Bayamon Administrative Staff for the houses to be worked. In general all work is located in the porch area with access from a back door (see attached drawings). It is expected that the Contractor have all materials, labor and coordination ready prior to work on each house. FOR MORE INFORMATION SEE COMPLETE STATEMENT OF WORK (SOW). ***SITE VISIT WILL BE SHEDULE FOR AUGUST 6, 2021 STARING AT 09:00. CALL PRIMARY AND SEGONDARY POC FOR APPOINMENTS!�ALL PARTICIPANT WILL FOLLOW�COVID-19 MANDARORY PROTOCALLS. �
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/a39c0ecc88424b2ab883d890e458403d/view)
- Place of Performance
- Address: Bayamon, PR 00959, USA
- Zip Code: 00959
- Country: USA
- Zip Code: 00959
- Record
- SN06077827-F 20210731/210729230123 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |