Y -- 630A4-18-415 INSTALL GENERATOR FOR BUILDINGS 85 AND 86

Notice Date
8/2/2021 1:42:29 PM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24221B0061_1
 
Response Due
8/31/2021 7:00:00 AM
 
Archive Date
11/29/2021
 
Point of Contact
CONTRACTING OFFICER, VLADIMIR STOYANOV, Phone: 718- 836-6600 ext 8889, Fax: (ALL QUESTIONS MUST BE BY EMAIL ONLY)
 
E-Mail Address
VLADIMIR.STOYANOV@VA.GOV
(VLADIMIR.STOYANOV@VA.GOV)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
 
Description
The scope of this project is a new 1000 KW diesel generator, Tier 4, 208Y/120V, which will be installed on grade, with a Diesel sub-base tank in an all-season housing/enclosure with conduits and feeders. The capacity of the fuel tank will allow the generator to run for 96 hours at a full load rating. In the weatherproof housing of the generator, an ATS will be located as well, with also the possibility of multiple output breakers to serve future loads from the generator. This ATS will back up the entire new 3000A switchgear to be located in the adjacent switchgear building. The generator will be provided with a remote generator and fuel tank monitoring/alarm panels. These panels will be located in the existing Vault 167. The panels will be wired to the facility BMS in the Engineering Service, Building 89. Via the facility BMS network, the generator and fuel tank can be viewed on the monitoring screen in Boiler Plant. Note that the design basis for the new generator uses an engine certified as US EPA Tier 4 due to the state and local environmental protection requirements. ��Engines certified as Tier 4 engines per 40 CFR 1039.101 are exempt from conducting the tests upon initial installation. The fuel tank monitoring system will conform with the latest EPA and NY Department of Environmental Protection requirements. There will be improvements to the switchgear building to replace the roof and accommodate the routing of conduits from the generator. Some lead paint abatement will be required. Structure for Generator pad and Tier 4 exhaust, stairs, etc., will also be required. To facilitate this construction and switchover of the emergency power, temporary power from ConEd will be required and is detailed in the bid documents to be provided by this contract. Be aware the process with ConEd is already started and is approved for construction. Given the nature of the work and the desire to minimize downtime, the submittals and ordering of equipment will need. This requirement is 100% set aside for Service Disabled Veteran Owned Small Business. A site visit is scheduled for 08/12/2021 at 11:00AM EST. Please see attached solicitation for additional details.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/dfdd5fcd1864486d9aa1d739df68c1b9/view)
 
Place of Performance
Address: Brooklyn, NY 11209, USA
Zip Code: 11209
Country: USA
 
Record
SN06080849-F 20210804/210802230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.