Z -- W912BV21R0036-Solicitation- Sluice Gate & Butterfly Valve Repair at Oologah Lake, OK

Notice Date
8/3/2021 11:44:27 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT TULSA TULSA OK 74137-4290 USA
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV21R0036
 
Response Due
8/30/2021 12:00:00 PM
 
Archive Date
09/14/2021
 
Point of Contact
Ryan Jacob Kelly, Phone: 9186697275, Rudolfo J. Morales Jr., Phone: 9186697275
 
E-Mail Address
ryan.j.kelly@usace.army.mil, rudolfo.morales@usace.army.mil
(ryan.j.kelly@usace.army.mil, rudolfo.morales@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SLUICE GATE & BUTTERFLY VALVE REPAIR, OOLOGAH LAKE, OK This project requires the contractor to furnish all plant, material, equipmenr, labor, instruments, tools, subcontractors, supervision, management and travel necessary to complete: 1. Develop and submit a crane placement plan for government approval. 2. Install bulkhead at the low flow intake. Develop and submit a diving plan. Inspect the butterfly valve and prepare a ""butterfly valve inspection report"". Repair butterfly valve based on repair procedures prepared by government based on inspection findings. 3. Repack knife valve stem. Blast and paint the gate valves to include the butterfly valve, knife valve, and all associated piping system and supports. 4. Inspect the service gate dogging device located at Bay #4 and prepare a ""dogging device inspection report"". Repair dogging device based on repair procedures prepared by government based on inspection findings. 5. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #4 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 1 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #3 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. � Option 2 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #2 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. � Option 3 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #1 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW,installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. **See Attachements ""Plans for Construction"" and ""Desgin & Permit Load Rating of Oologah Service Bridge""
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/c0c1b78b44f14a718f58f7fad40d67c8/view)
 
Place of Performance
Address: Oologah, OK, USA
Country: USA
 
Record
SN06083018-F 20210805/210803230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.