Z -- Install new air compressor for Sterile Processing

Notice Date
8/4/2021 12:44:43 PM
 
Notice Type
Solicitation
 
NAICS
333912 — Air and Gas Compressor Manufacturing
 
Contracting Office
NETWORK CONTRACT OFFICE 23 (36C263) Saint Paul MN 55101 USA
 
ZIP Code
55101
 
Solicitation Number
36C26321Q0789
 
Response Due
8/10/2021 10:00:00 AM
 
Archive Date
08/24/2021
 
Point of Contact
Wendy S Hoeschen, Contracting Officer
 
E-Mail Address
Wendy.Hoeschen@va.gov
(Wendy.Hoeschen@va.gov)
 
Awardee
null
 
Description
Page 2 of 2 This Notice of Intent is provided to advise that the Government intends to solicit for a Brand Name or Equal Replace SPS Compressors as a Small Business set-aside for the Omaha VA Health Care System to include the following: Replace - SPS Compressors Brand Name or Equal General Description Work: Period of Performance is 45 calendar days from Award, to include material lead time. SPS Air Compressors-Omaha The contractor will provide all labor and materials needed to remove and replace the following air compressor in Room 3254: STD0504-HP PowerEX 5 HP Air Compressor 24 CFM @ 145 PSI, High Pressure Oil less Scroll | 120-Gal Tank | 3-Phase | STD0504-HP I UL508A Listed Control Panel: or equivalent. The Contractor is responsible for relocating the existing air compressor to the basement of building 1 for storage, on a pallet and reuse as necessary. Contractor to provide 2 calendar days advanced notice prior to requiring relocation to the COR and sufficient storage will be made available. Salient Characteristics of Replacement Air Compressor- BNOE No exhaust or intake valves Integrated aftercooler design Low noise level Low maintenance cost Compact/point of use installation Product Specifications: Capacity (CFM) @ 100/125 PSI30.4 CFM @ 100 PSI Capacity (CFM) @ 145 PSI116 PSIG @ 145 PSI Compressor Style Oil Less Scroll Controls Start/Stop Cooling Type Air Cooled Horsepower (HP)5 (10 HP) Max Pressure (PSI)116 PSI Min Ambient Temperature35 F Pump Drive Belt Rated Duty Cycle100% Tank Material Carbon Steel Motor Data Motor Type ODP Power Requirements 208/3/6016.7 Full Load Running Amps 230/240/3/6015.2 Full Load Running Amps 460/480/3/607.6 Full Load Running Amps Standard Voltages208/230/460/3/60 (Please Specify) In the event that wires are damaged contractor shall replace existing wire, perform a continuity test and submit reports to the VA COR. Contractor to reuse the existing conduits and wires installed if continuity tests show no break or damaged wiring. The VA will provide sufficient electrical power from a circuit panel located in Room 3254. Contractor to make all electrical connections new air compressor. Contractor to provide adequate training of up to 2 hours on the operation of the compressors installed and any necessary preventative maintenance. A training schedule shall be developed and submitted by the contractor and approved by the VA COR at least 14 days prior to the planned training. Must provide O&M manuals upon completion. The contractor will work with the VA POC, plumbing, biomed staff during pre-site planning and installation of equipment.  Upon completion, the contractor shall provide a walkthrough with the VA representatives to include the VA POC, biomed staff to ensure that the equipment installed is fully functional. The Contractor shall provide 24-month warranty period and verify operation of the compressors. In the event that the equipment installed is not operational due to defects in this period contractor to respond to VA representatives request for onsite service within 48 hours. The contractor will be responsible for disposal of all trash and removal of all equipment at the end of each working day.  The VA will not be responsible for storage of equipment, materials, or tools. Security: Contractor(s) shall obtain badges prior to work and must be worn at all times while on VA premises. It is Vendor s responsibility to obtain security badges from the all employees, sub-contractors and visitors that will be on site. It is the vendor s responsibility to account for and return all badges that have been issued. Any lost/misplaced/unreturned badges may result in a lost badge charge. A solicitation will be issued on or about 8/4/2021. Responses shall be submitted electronically to Wendy Hoeschen via email at wendy.hoeschen@va.gov. Fax responses and Telephone inquiries will not be accepted.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/e340c007c5fa423e9c12f46e45173259/view)
 
Record
SN06084186-F 20210806/210804230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.