Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 07, 2021 SAM #7189
MODIFICATION

Z -- Replace Fire Pump Controllers, Design-Build

Notice Date
8/5/2021 3:57:42 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
244-NETWORK CONTRACT OFFICE 4 (36C244) PITTSBURGH PA 15215 USA
 
ZIP Code
15215
 
Solicitation Number
36C24421R0099
 
Response Due
9/7/2021 11:00:00 AM
 
Archive Date
12/06/2021
 
Point of Contact
donald.kalivoda@va.gov, Donald Kalivoda, Phone: (814) 860-2917
 
E-Mail Address
donald.kalivoda@va.gov
(donald.kalivoda@va.gov)
 
Awardee
null
 
Description
POSTING - Solicitation AND ATTACHMENTS for PHASE I The Veterans Integrated Service Network #04 (VISN 04) Contracting Office / Lebanon Veteran Administration Medical Center is issuing the attached solicitation with attachments and subsequently the VA intends on awarding a single, Firm-Fixed-Price contract that will be the Best Value to the Government based on evaluation factors and price. The project will be for the selection of a prime contractor (Construction contractor NAICS code 236220 Commercial & Industrial Building & Construction, with a size standard of $39.5 million). The prime contractor to contract/partner with an architect/engineering firm to provide design-build services necessary for completion of designs and the objective Replace Fire Pump Controllers (This is a Design-Build project). Note: This notice is for Phase I submittals only at this time. ALL Qualified PHASE I Offerors that are 100% SDVOSB may submit for Phase I. After Phase I evaluation is complete, ONLY Offerors that are selected for Phase II will be notified with instructions for Phase II proposal submission Project Scope Summary The Design-Build team shall provide all, labor, materials, tools and equipment, and design-build services necessary for design and construction of a project described here along with other specified tasks as further defined in a request for proposal (RFP) for Replace Fire Pump Controllers Project No. 595-22-104. The project shall be designed and completed in accordance with current VA guidelines, EPA requirements, VA Specifications and developed specifically to meet local requirements for the Lebanon VA Medical Center in Lebanon PA. The resultant contract of this procurement is to provide required design completion of the referenced project and perform construction of completed design work. Selection/Administration: This project is a Best Value two-phase design-build solicitation. The Phase I offers will be evaluated to determine which of the offerors will be selected to make an offer in Phase II of the solicitation. The Request for Proposal shall set forth the requirements for responding to Phase I of the solicitation as well as all evaluation factors for both Phases I and Phase II. Phase II solicitation will be issued in an amendment as a Request for Proposal (RFP) conducted in accordance with Federal Acquisition Regulations (FAR) Parts 36.3 and 15 and will be evaluated in accordance with the evaluation factors therein. Total project anticipated between $250,000 and $500,000.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/9eda408b34d24495b3f7ee95c9f3190b/view)
 
Place of Performance
Address: Lebanon VA Medical Center 1700 S Lincoln Avenue Lebanon, VA 17042
 
Record
SN06086066-F 20210807/210805230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.