Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 08, 2021 SAM #7190
SOLICITATION NOTICE

Y -- Alcoa Aluminum Plant Dike Phase II

Notice Date
8/6/2021 1:10:42 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W075 ENDIST LOS ANGELES LOS ANGELES CA 90017-5000 USA
 
ZIP Code
90017-5000
 
Solicitation Number
W912PL21B0004
 
Response Due
8/12/2021 1:00:00 PM
 
Archive Date
08/27/2021
 
Point of Contact
Michael G. Robinson, Phone: 2134523311, Suntok McGuinness
 
E-Mail Address
michael.g.robinson@usace.army.mil, suntok.mcguinness@usace.army.mil
(michael.g.robinson@usace.army.mil, suntok.mcguinness@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 0001 Issued on 7/19/2021 - Solicitation due date updated to 30 July 2021 - FIO 2 DDR Addendum 2021 updated Amendment 0002 iussed on 7/27/2021 - Soliciation Due date updated to 5 August 2021 Amendemnt 0003 issued on 7/29/2021 - Soliciation Due date remains 5 August 2021 Amendment 0004 issued on 8/3/2021 - Solicitation Due date Updated to 12 August 2021 Amendment 0005 Issued on 8/6/2021 - Soliciation due date remains 12 August 2021 Alcoa Dike Phase 2, Corona, Riverside County, CA The project is approximately 3,000 linear feet earthen filled dike flood control structure. The elevation of the top of the dike varies between elevations 569.50 and 573.50. The dike will have the following basic characteristics: average height of 22 feet above existing ground, width of crest is 15 feet, 2.25 horizontal to 1 vertical (2.25H:1V) side slopes, upstream slope will be protected with 15-inch layer of riprap over a 12-inch layer of bedding, downstream slope will be hydroseeded. Butterfield Drive, W. Rincon Street, and Auburndale Street will be impacted by the construction of the dike. A concrete floodwall and floodgate will be constructed across Auburndale Street. Butterfield Drive will be modified and a new connector road constructed to connect to Rincon Street. Total Period of Performance is 1095 Calendar Days. Completion of Bid Item�s 0001 through 0032, 0034, and 0036 through 0038 will be within the first 730 Calendar Days. Completion of Bid Item 0033 and 0035 Landscape Establishment and 0034 Borrow Area Closure will be 365 Calendar Days and be completed prior to the end of the Total Period of Performance period.� The Estimate cost range for this procurement is $10,000,000 - $25,000,000. This procurement is a 100% total Small Business Set Aside. The NAICS Code is 237990 ""Other Heavy and Civil Engineering Construction. The size Standard is $39,500,000.00. Be advised this project may delayed, postponed, canceled or revised at any time prior to award.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/8c581dac757e4c96aa75644a257e9949/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN06088199-F 20210808/210806230120 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.