SOLICITATION NOTICE
Z -- FY21 Savannah Inner Harbor Maintenance Dredging
- Notice Date
- 8/9/2021 7:50:53 AM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
- ZIP Code
- 31401-3604
- Solicitation Number
- W912HN21B5006
- Response Due
- 8/5/2021 10:00:00 AM
- Archive Date
- 08/20/2021
- Point of Contact
- Arcia E Fusi, Phone: 9126525901, Whittni C. Hiscox, Phone: 9126525476
- E-Mail Address
-
Arcia.E.Fusi@usace.army.mil, whittni.c.hiscox@usace.army.mil
(Arcia.E.Fusi@usace.army.mil, whittni.c.hiscox@usace.army.mil)
- Description
- *** AMENDMENT 0001 includes changes to Solcitation Section 00 21 13 Instruction to Bidders (6. a.) establishing the ProjNet Bidder inquiry closing date as 19 July 2021, revision to the Monthly Anticipated Adverse Weather Delay Workdays, Section 01 00 00 � General Requirements (6. b.) and changes to�the specifications in section��35 20 23.� The�most recent Conformed Solicitation document�must be used for�your bid.*** The Solicitation and final plans and specs are�attached.�A virtual pre-bid conference was held on 8 July 2021 12:00 p.m. Eastern Daylight Time. Please see page 29, paragraph # 10�of attachment (B.08 W912HN21B5006 - Solicitation) This solicitation is for the FY21 Savannah Inner Harbor Maintenance Dredging, Savannah, Georgia. This acquisition is being offered as�full and open competion and will result in a Fixed Price Contract Award. The magnitude of this requirement per DFARS 236.204 (ii)�is between $25,000,000.00 and $100,000,000.00. Project Location: The work is located in the deep draft Savannah Harbor navigation project in Georgia. The Savannah Harbor project is located on the border of Georgia and South Carolina (SC) in Chatham County. The Savannah Inner Harbor channel is 42 ft. deep MLLW and 500 ft. wide to the upper end of Kings Island Turning Basin: 36 ft. deep MLLW and 400 ft. wide to the upper end of Argyle Island Turning Basin; and 30 ft. deep MLLW and 200 ft. wide to the upper limit of the project. Project Description: The Savannah Inner Harbor Contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging. This contract is traditionally performed with a hydraulic cutterhead dredge and the duration is expected to be one year from Notice to Proceed. Up to four million cubic yards of maintenance material is expected to be removed from the inner harbor. Savannah Harbor�s Kings Island Turning Basin (KITB) is the primary turning basin for large civilian and military ships, lying adjacent to the Georgia Ports Authority docks. KITB requires dredging twice a year to allow the loaded ships to freely turn when using the port. Approximately 1.6 million cubic yards of maintenance material is removed from the KITB annually. Current project and advance maintenance depths authorized for Savannah Inner Harbor are below. The Inner Harbor is undergoing a deepening which will alter the project depth by -5 ft. MLLW. Deepening of portions of the Savannah Inner Harbor may be completed during this contract and required maintenance dredging depth may be adjusted accordingly. Other contractor(s) may be working for the Savannah District on the Savannah Harbor, to include confined upland dredged material containment areas and designated staging areas. If such work occurs, the contractors shall coordinate activities under the direction of the Contracting Officer. All material dredged from the Savannah Inner Harbor shall be placed in upland confined disposal areas adjacent to the Savannah River, with DMCA-12A receiving the majority of the maintenance material. Savannah confined upland disposal areas DMCAs 12A, 13A, 13B and Jones Oysterbed Island are owned by local sponsor Georgia Department of Transportation. Disposal areas DMCAs 14A and 14B are owned by the Joint Project Office of the Georgia and South Carolina Port Authorities. Portions of DMCAs 2A and Jones/Oysterbed are owned by the Georgia Department of Transportation and the US Fish and Wildlife Service. DMCA 1N is owned entirely by the US Fish and Wildlife Service. The Federal Government holds existing easements on all confined upland disposal areas in the Savannah Harbor except DMCA 1N which has a Memorandum of Understanding. Environmental windows limit the timing of dredging in the Savannah Inner Harbor. The environmental windows in Savannah include a Striped Bass spawning window (2 weeks between approximate dates 1 April through 15 May timeframe) which limits the amount and timing of dredging above station 63+360 (River Mile 12), and a dissolved oxygen window (approximately July 1 through September 30). An environmental window also exists for sturgeon between 1 May and 30 October annually, no dredging is allowed above station 105+500, cutterhead dredging below 105+500 during those months will monitored for sturgeon take. Certain reaches of O&M sediments may contain cadmium (Cd) in levels significant enough to harm foraging avian species in the DMCAs. Therefore, O&M sediments in those reaches will be tested by the Government prior to dredging. If Cd is found in those sediments equal to or greater than 14 mg/kg, then options will be exercised that include disposal of the sediments in specific DMCAs under special handling conditions. Obstructions are objects or materials in the required side slope cross sections or in the existing ground surface which are unknown at the time of encounter by the dredge or identified by pre and post hydrographic surveys, and monthly condition surveys. Obstructions are objects which cannot be removed by a hydraulic pipeline dredge. The Contractor may encounter obstructions during dredging operations and must remove the objects or materials to provide the required section as shown on the cross-section plates. If the Contractor is performing maintenance dredging with a pipeline dredge, the dredge must act as a probe for obstructions. The object removed will be the property of the Contractor. The estimated construction duration for the FY21 Savannah Inner Harbor Maintenance Dredging is 365 calendar days after issuance of the Notice to Proceed (see attached documentation for details). This acquisition will be procured in accordance with FAR 14 (Sealed Bidding).
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/c0e745a194a44a9da6724c4c64c338af/view)
- Place of Performance
- Address: Savannah, GA, USA
- Country: USA
- Country: USA
- Record
- SN06090193-F 20210811/210809230122 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |