Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 18, 2021 SAM #7200
SOLICITATION NOTICE

Z -- MAINTENANCE DREDGING,NAVAL WEAPONS STATION (NWS) EARLE

Notice Date
8/16/2021 2:56:57 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
NAVAL FAC ENGINEERING CMD MID LANT NORFOLK VA 23511-0395 USA
 
ZIP Code
23511-0395
 
Solicitation Number
N4008521B0055
 
Response Due
8/24/2021 11:00:00 AM
 
Archive Date
07/25/2022
 
Point of Contact
Georgia Scott, Phone: 7573410691
 
E-Mail Address
georgia.scott@navy.mil
(georgia.scott@navy.mil)
 
Description
The project consists of Maintenance Dredging the areas surrounding piers at Naval Weapons Station (NWS) Earle including all berths, turning basin, terminal channel, and a portion of Sandy Hook Federal Channel. This project willbe done in order to re-establish the minimum required harbor depths needed for access by the Naval vessels that use these facilities. Maintenance dredging shall be done via clamshell dredge, with a total estimated volume of 2,261,170 cubic yards (CY) of dredged material to a depth of -45 feet Mean LowerLow Water (MLLW) Datum, plus the standard 2 feet of overdepth of -47 Mean Lower Low Water (MLLW) Datum including the ship berths, the turning basin, the terminal channel and a portion of the Sandy Hook Federal Navigation Channel of the New York Harbor, N.Y. Federal Navigation Project (Sandy Hook Federal Channel). The dredged material would be placed into split-hull and/or bottom dumping scows maneuvered using a tugboat. Barge overflow is authorized when performed in accordance with the Water Quality Cerificate (WQC) issued by the New Jersey Department of Environmental Protection (NJDEP). The dredged material will be placed at the Historic Area Remediation Site (HARS) for the purpose of remediation. There are nine (9) dredging areas, Dredging Areas B1, B2,, C1, C2, D, E, F, G and H and dredging will be conducted in two dredging phases. During Dredging Phase 1, the piers, turning basin and a portion of the Sandy Hook Channel (Area B1, B2, C1 and C2), consisting of 1,176,375 CY sand, silt, and mud, will be dredged in Summer 2022; and during Dredging Phase II, the remainder of the Sandy Hook Channel (Areas D, E, F, G and H), consisting of approximately 1,043,395 CY sand, will be dredged in Summer 2023. The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 7,500 CY per day.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a90dae6e318343129cd1125f097c356a/view)
 
Place of Performance
Address: Colts Neck, NJ, USA
Country: USA
 
Record
SN06098215-F 20210818/210816230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.