Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 20, 2021 SAM #7202
SOLICITATION NOTICE

B -- Utility Monitoring and Control System (UMCS) Retrofit Implementation Plan

Notice Date
8/18/2021 4:30:15 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541690 — Other Scientific and Technical Consulting Services
 
Contracting Office
W2R2 CONST ENGRG LAB CHAMPAIGN IL 61822-1072 USA
 
ZIP Code
61822-1072
 
Solicitation Number
W9132T21R0008
 
Response Due
9/3/2021 9:59:00 AM
 
Archive Date
09/18/2021
 
Point of Contact
Andrea J Thomas
 
E-Mail Address
andrea.j.thomas@usace.army.mil
(andrea.j.thomas@usace.army.mil)
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.� This announcement constitutes the only version of solicitation W9132T21R0008:�offers are being requested and a written solicitation will not be issued. **This posting has been amendeded on 8/18/2021 to extend the offer due date and add a document of vendor Q&A received to date on this announcement** The U.S. Army Engineer Research and Development Center (ERDC), Construction Engineering Research Laboratory (CERL) has a requirement for a contractor to provide Utility Monitoring and Control System (UMCS) retrofit implementation recommendations for utilizing Commercial Off the Shelf (COTS) solutions (sensors, software, etc.) and without the need for significant replacement or alteration of the system. �A UMCS will typically control and display HVAC heating, cooling and ventilation operations, however metering, lighting, security, and other facility sub-systems can also be integrated in a variety of configurations.� This requirement is part of the Army Installations of the Future (IotF) Program which seeks to improve the speed and costs of building controls integrations with UMCS across the Army, better enabling advanced analytics for energy costs savings and improved resilience.� The government will utilize these recommendations to develop an IotF UMCS Retrofit Implementation Guide for installation managers to use in their decision-making processes. Please reference the attached�solicitation document�for full details of the requirement, instructions for proposal preparation,�offer evaluation criteria,�and all applicable provisions and clauses. Any questions about or offers in response�to this notice must be submitted to CERL-CT-QUOTES@usace.army.mil�no later than the deadline given in this notice posting.� Telephone responses will not be accepted. * Note: In order to be eligible for award of a Government contract, vendors must be actively registered in the System for Award Management (SAM), have no active exclusions, and complete representations and certifications. This system combines data that was formerly contained in the Central Contractors Registration (CCR), Online Representation and Certifications (ORCA), and the Excluded Parties List System (EPLS). For more information, review the SAM website at https://www.sam.gov.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/59ad621c8f3341a39b7cb0e8de18ca82/view)
 
Record
SN06101493-F 20210820/210818230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.