Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 20, 2021 SAM #7202
SOLICITATION NOTICE

Y -- GAOA Hoonah Road Resurfacing & Wukuklook Rec Area

Notice Date
8/18/2021 8:29:33 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
PACIFIC NORTHWEST REGIONAL OFFICE PORTLAND OR 97204 USA
 
ZIP Code
97204
 
Solicitation Number
1240BJ21B0001
 
Response Due
9/16/2021 10:00:00 AM
 
Archive Date
10/01/2021
 
Point of Contact
Michael L. Johnson, Phone: 503-312-5768
 
E-Mail Address
michael.l.johnson@usda.gov
(michael.l.johnson@usda.gov)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Description
Amendment A01 added to attachments. B.2.b. Bids shall be emailed to michael.l.johnson@usda.gov not later than the established closing date andtime. NOTE: Include the solicitation number in the email subject line. B.2.c. The public bid opening will be conducted through a TEAMS Live Event. Use the link or QR Code: https://msteams.link/CSGJ� � (QR Code on page 5 of the solicitation.) The intent of this contract is to provide safe access to Forest Service lands by providing surface maintenance on the Hoonah Road System. The work includes all activities necessary to enable resource management activities along the roads in this project. The project includes Mobilization of Equipment to perform the work, and consists of a Base Bid and Six Option items with the following summary of work: Base Bid Includes the reconstruction of the 8530 road from False Bay to the Wukuklook bridge (approx. 3.2 miles). Work includes clearing and grubbing, blasting exposed bedrock to widen the roadway, placing borrow to fill dips and flatten out steep sections of the road, and installing/replacing culverts. Work on the 8530 road segment cannot commence until after August 1st due to nesting birds. Option Work: Option 1 - Includes blasting a rock knob on the 8502 road to increase site distance around a blind corner. Option 2 � Includes reconditioning and placing a 6� lift of crushed aggregate on the first 1.4 miles of the 8576 road. Option 3 � Includes clearing & grubbing and borrow placement to increase the size of the Bear Paw Lake Parking lot to accommodate one additional vehicle (16 passenger van). Option 4 � Includes removing an existing 0.60 mile-long boardwalk trail and replacing it with a rock trail. Work on this option cannot commence until after August 1st due to nesting birds. Option 5 � Includes installing two fire rings near the end of the 0.25 mile-long Bear Paw Lake trail. Start time restrictions for Base and Option 4 work are based on a potential for nesting birds. These timing restrictions may be eliminated after the FS has verified no birds of concern are nesting within the area. Option 6 � Includes Produce & Stockpile 2,500 CY of Crushed Aggregate, Type Base, Grading C End haul waste material site locations to be identified and staked by Forest Service, generally within 2 miles of project site. Side-casting will not be allowed in areas where material would be placed adjacent to live streams within 100 feet.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/cf931e6a9b8145158468dc69744bee29/view)
 
Place of Performance
Address: Hoonah, AK 99829, USA
Zip Code: 99829
Country: USA
 
Record
SN06101831-F 20210820/210818230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.