Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 20, 2021 SAM #7202
SOLICITATION NOTICE

Z -- Electric Power Resiliency - Bldg.59

Notice Date
8/18/2021 11:00:58 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
DLA DISTRIBUTION NEW CUMBERLAND PA 17070-5008 USA
 
ZIP Code
17070-5008
 
Solicitation Number
SP330021B0001
 
Response Due
8/30/2021 10:00:00 AM
 
Archive Date
12/31/2021
 
Point of Contact
Paul Holbert, DONNA A KAUTZ
 
E-Mail Address
paul.holbert@dla.mil, donna.kautz@dla.mil
(paul.holbert@dla.mil, donna.kautz@dla.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
See Attached Amendment 0001 SP330021B00010001 and associated Revised Attachment 2 SOW. See Attached Full�Solictation SP330021B0001.� Project Description: 1. Contractor is to provide all labor, supervision, materials, tools, and equipment design and install roof mounted 300 KW solar photovoltaic system for building 59. 2. PV electrical output will be interconnected with the existing electric service to the building. 3. All PV generated will be used to displace ""behind-the-meter"" retail electric consumption. 4. The PV solar panels� layout of the rooftop PV system shall be designed so as not to interfere with the servicing of existing mechanical equipment, roof drains, or other roof equipment that requires regular servicing. Access aisles will be provided on the rooftop and appropriate clearances to maintain roof top mechanical equipment. 5. PV system shall meet 85 mph 3 second gush wind load. 6. Use maximum ballasts for PV panel anchoring. Repair, seal, weather tight all roof penetration. Coordinate with the roof manufacturer to provide certificate of roof warranty not invalidated by solar PV installation. 7. Output from the PV panels will be converted to AC through inverter mounted on solar panels and then interconnected to the main electrical switchgear. The new PV systems will tie in with the existing Base-wide electrical distribution system. 8. PV system design include appropriate disconnects and grounding systems to safely interface with the government's distribution. All work shall be performed complete and in accordance with the Specifications including Scope of Work and Drawings.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/f2b6e82df7854495abb09c10e4a75021/view)
 
Place of Performance
Address: CA 95366, USA
Zip Code: 95366
Country: USA
 
Record
SN06101901-F 20210820/210818230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.