Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 25, 2021 SAM #7207
SOLICITATION NOTICE

D -- Replace the SLC 500 DX-1000 transmitter control system and DH+ communication network for the Thailand Transmitting Station at Rasom (USAGM/TTS)

Notice Date
8/23/2021 8:05:18 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541519 — Other Computer Related Services
 
Contracting Office
OFFICE OF CONTRACTS WASHINGTON DC 20237 USA
 
ZIP Code
20237
 
Solicitation Number
951700-21-R-0027
 
Response Due
8/27/2021 9:00:00 AM
 
Archive Date
09/11/2021
 
Point of Contact
Tisa Harvin, Contracting Officer, Phone: 2023827835
 
E-Mail Address
tharvin@usagm.gov
(tharvin@usagm.gov)
 
Description
The U.S. Agency for Global Media, Thailand Transmitting Station at Rasom (USAGM/TTS) to replace the SLC 500 DX-1000 transmitter control system and DH+ communication network. Work is to be performed at the U.S. Agency for Global Media Transmitting station site at Rasom, Ayutthaya Province, Thailand. The contract type shall be firm-fixed price. The Bangkok Transmission Stations DX-1000 Harris transmitter is equipped with SLC 500 control system and DH+ communication network.� The current SLC 5/04 and SLC 5/01 ladder program, HD+ communication network, MMI, and Allen-Bradley software technology are outdated, representing challenges locating hardware spare parts and software maintenance. The desired DX-1000 transmitter controller system is Allen-Bradley CompactLogix control system and Ethernet communication network platform. This SOW is to provide the requirements for a contractor to survey the site, to provide a replacement design, and then to replace new DX-1000 transmitter controller system. Potential Offerors will be permitted to visit the site to gather all information necessary to provide a cost proposal for the replacement design and implementation. Each offeror must provide a project proposal that includes a design layout, panel layout, schematic and block diagram for the work planned, details of the equipment proposed for installation, a narrative in English of 300 or more words describing their proposed work, and a detailed cost proposal to provide a full engineering design and to then implement the design. The narrative must detail the contractors plan to minimize down time for existing transmitter controller system during the work and a plan to keep the existing system daily broadcasting requirements of the BAK-01 transmitter system during replacement until the new system is properly operate.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/47ee22a699ca4fbe99dd6729d4332697/view)
 
Place of Performance
Address: THA
Country: THA
 
Record
SN06106712-F 20210825/210823230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.