SOLICITATION NOTICE
V -- Education Bus Tour 2021 - Bus Transportation and Bus Wrap Services
- Notice Date
- 8/24/2021 8:45:58 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 485510
— Charter Bus Industry
- Contracting Office
- CONTRACTS AND ACQUISTIONS MANAGEMEN WASHINGTON DC 20202 USA
- ZIP Code
- 20202
- Solicitation Number
- ED-2021-BUS
- Response Due
- 8/27/2021 6:00:00 AM
- Archive Date
- 09/11/2021
- Point of Contact
- Gary L. Weaver, Contracting Officer, Phone: 2023028907
- E-Mail Address
-
Gary.Weaver@ed.gov
(Gary.Weaver@ed.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Amendment 0001: �The purpose of Amendment 0001 to Solicitation # ED-2021-BUS is to modify the Statement of Work (SOW) to change tour route and tour stop location and other requirements. �The tour schedule is currently being finalized and, at this time, the Department can only verify that the tour route will be through the Midwest region. �The final tour schedule will be shared with the selected vendor only. �See attached, revised SOW for complete updated requirements. �In addition, the RFQ is amended to align with the changes to the SOW. �See, especially, the price quote instructions. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. The solicitation for commercial services is being conducted in conjunction with FAR Part 13. This announcement constitutes the only solicitation? quotes are being requested and a written solicitation will not be issued. The solicitation document and incorporated provisions and clauses are those in effect through FAC Number/Effective Date: � �2005-99-1 / 07-16-2018. The NAICS Code is 485510, Charter Bus Industry, and the size standard is $16.5M. The U.S. Department of Education has a requirement for motorcoach/provost transportation for a multi-city tour by the Secretary of Education. �In the addition, the tour bus shall be wrapped in a Department-approved design. �The complete requirements, including driver requirements, preferred bus layout, etc. are included in the attached Statement of Work. This is a Request for Quotation (RFQ) for information on bus transportation and related services. The firm selected to receive an offer from the Department is required to register in the System for Award Management (SAM) and to maintain active registration during the life of the contract. SAM can be accessed at https://www.sam.gov. Firms shall include their DUNS number or SAM.GOV Unique Entity Identifier (UEI) in their quote. If the firm does not have a DUNS or UEI number, it should contact Dun and Bradstreet directly or follow the instructions on SAM.GOV to obtain one. The firm selected for an offer from the Department will need to provide Offeror�Representations and Certifications prior to any award. Organization and Content of the Quote The quote must contain all necessary information to meet the technical requirements presented in this RFQ and SOW. �A final schedule will be provided to contractor by September 10, 2021. � The quote must be organized into the following parts: Volume I � Technical Quote� Volume II � Price Quote Volume I � Technical Quote (Technical Approach & Corporate Capability) 1.�� �Technical Approach � The offeror shall provide a brief narrative demonstrating its understanding of the scope of work and the requirements set forth in the RFQ. �The technical approach shall address the offeror�s: a.�� �Understanding of the technical requirements b.�� �Detailed approach to fulfilling the technical aspects of the required services. �Contractor shall provide a minimum of four bus options with photos that show all exterior sides of the bus, the bus� interior, and the bus� compliance with the RFQ specifications in the statement of work, such as table/work area, private room, bathroom, etc. �The offeror SHALL only propose for ED�s consideration buses that are/will be available for the contracted period. � ED will select the specific bus option in terms of year/make/model and interior configuration/layout from the options provided prior to contract award and that vehicle configuration will be listed in the contract. �No substitutions for the exact vehicle configuration specified in the contract will be allowed without prior written approval from ED. � c.�� �Offeror shall briefly discuss how it will manage wrapping the bus in an ED-approved design. �Offeror shall also indicate any restrictions/guidelines and/or insurance requirements for wrapping the proposed bus. �If a subcontract is required to wrap the bus, the offeror shall provide the subcontractor name, email, phone number and a point of contact in its quote.� 2.�� �Past Experience - The Offeror shall provide a brief narrative demonstrating its experience in performing work in areas comparable to those outlined in the RFQ. �The narrative shall include information of at least three (3) projects their firm has completed within the past three (3) years which were similar in scope and size to the RFQ. �This information shall also be provided for any subcontractors proposed in relation to the work they would perform. �The corporate capability and experience shall address the Offeror�s experience: a.�� �Managing contracts and fulfilling the technical requirements of similar size and scope to that specified in the solicitation. b.�� �Reference information shall be provided for each relevant contract included in the Corporate Capability and Experience section. �The reference information shall include: i.�� �Name of the Contracting Agency� ii.�� �Contract Number iii.�� �Contract Type� iv.�� �Period of Performance v.�� �Total Contract Value vi.�� �Description of the Services Performed vii.�� �Reference Point of Contact, Telephone Number and Email Address Volume II - Price Quote (updated Instructions, Amendment 0001 Posted 8/24/2021) The price quote shall include: An itemized spread sheet quoting a fixed price for the requirements and covering the following (if applicable):labor, meals for drivers, gratuity, meetings, materials and production, and advance shipping. �Also include any insurance fees expected to be covered by the government. � Please also include a per mile price if we need to add stops or extend a leg of the bus route. �We do not foresee any reason why we would need to go more than 100 miles outside of the pre-existing schedule. �Contractor is to provide itemized pricing for graphic design requirements, including optional and signage items. � The contractor shall include the costs of any stock photos needed to produce the wrap and signage, which shall be for exclusive use by ED. �As stated in the SOW, ED will pay for driver hotel accommodations. Contractor shall bill parking fees, tolls and other fees at cost. �Fuel shall be billed as a direct cost. �Quote shall include any fuel surcharge that will be applied to fuel charges as well as the formula that will be used to calculate any fuel surcharge. Note: �ED will provide a separate Contract Line Item (CLIN) with a firm-fixed-price amount for food and beverage. �This CLIN will be funded with non-appropriated funds.� Evaluation of Quotes: Evaluation Criteria: �The Government will award a contract resulting from this solicitation to the responsible contractor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Although price is an important factor, technical merit is significantly more important than price. �As technical merit becomes more equal, price will become a more significant factor. �The Contracting Officer will determine whether any difference in technical merit is worth the difference in price. �The following factors shall be used to evaluate offers: ��� �Ability to meet the solicitation requirements and tour schedule. ��� �Quality of the vehicles and amenities offered. �Quality of bus will be evaluated in terms of overall condition and functionality of interior layout/configuration. � ��� �Past experience doing similar work. ��� �Price. Note to all quoters: �In responding to this RFQ, it is the contractor�s responsibility to provide current, relevant, complete and accurate information in their quotation. �The following Education Department Acquisition Regulations (EDAR) clauses shall apply to any resulting order: 1.�� �FAR 52.252-2 -- Clauses Incorporated by Reference (February 1998) �This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): �Education Department Acquisition Regulation (EDAR) provisions can be reviewed at http://edocket.access.gpo.gov/2011/pdf/2011-4660.pdf. �Federal Acquisition Regulation provisions and clauses can be reviewed at: https://www.acquisition.gov/?q=browsefar 2.�� �FAR 52.212-3, Offeror Representations and Certifications-Commercial Items (Feb 2021) 3.�� �FAR 52.212-4 -- Contract Terms and Conditions-Commercial Items (OCT 2018) 4.�� �FAR Contract Terms and Conditions Required To Implement Statutes or Executive Orders�Commercial Items (JUL 2021) (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note). X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note). X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644). X (16) 52.219-8, Utilization of Small Business Concerns (May 2014) (15 U.S.C. 637(d)(2) and (3)). X (22) 52.219-28, Post Award Small Business Program Representation (Jul 2013) (15 U.S.C. 632(a)(2)). X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755). X (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999). X (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246). X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793). X (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513). X (41) 52.225-1, Buy American-Supplies (May 2014) X (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). X (50) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Jul 2013) (31 U.S.C. 3332). 5.�� �EDAR 3452.201-70 Contracting Officer�s Representative (COR) (MAY 2011) (a) The Contracting Officer�s Representative (COR) is responsible for the technical aspects of the project, technical liaison with the contractor, and any other responsibilities that are specified in the contract. These responsibilities include inspecting all deliverables, including reports, and recommending acceptance or rejection to the contracting officer. �(b) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes that affect the contract price, terms, or conditions. Any contractor requests for changes shall be submitted in writing directly to the contracting officer or through the COR. No such changes shall be made without the written authorization of the contracting officer. �(c) The COR�s name and contact information: (TBD at Award). �(d) The COR may be changed by the Government at any time, but notification of the change, including the name and address of the successor �COR, will be provided to the contractor by the contracting officer in writing. 6.�� �EDAR 3452.224-70 Release of information under the Freedom of Information Act (May 2011)� 7.�� �EDAR 3452.227-71 Advertising of Awards (May 2011) 8.�� �EDAR 3452.242-73 Accessibility of Meetings, Conferences, and Seminars to Persons with Disabilities (May 2011)� 9.�� �306-1c: �Invoice and Contract Financing Requests Submission - IPP (May 2018) Payments shall be rendered in accordance with the identified payment schedule(s), and any other incorporated payment clause(s), specified rates, and/or fixed price amounts.� The Contractor shall submit invoices electronically by means of the web-based system, Invoice Processing Platform (IPP), which can be accessed at http://www.ipp.gov/. �All submitted invoices must be accompanied by supporting documentation in accordance with the contract's terms and conditions. The supporting documentation shall be submitted in the following formats: �Adobe Acrobat (pdf), Microsoft Word (doc), Pictures (jpeg), Microsoft Excel (excel), or Microsoft Outlook message (msg). Invoice Number Format - The format for the invoice shall be the contract number followed by the invoice number. �The invoice number shall have no spaces, dashes, or other special characters. �The invoice number cannot exceed 21 characters. �An example of an acceptable invoice number format follows: �� �Contract Number: �� � �� � 91990018C0001 �� �Contractor's Invoice No.: �� �15897126341 IPP Invoice No.:�� � �91990018C000115897126 (Note that the last three digits [""341""] from the Contractor's invoice number were removed due to the 21 character limitation.) If the Contractor has not already established an IPP account that is active, an IPP account will be automatically created on behalf of the Contractor. The automatically created IPP account will be issued to the Designated Primary Administrator, which will be the individual that has been identified in the ""Accounts Receivable POC"" section of the Contractor's System for Award Management (SAM) registration located at https://www.sam.gov/portal/public/SAM/.� Within ten (10) business days of the Contractor entering or updating the Accounts Receivable POC information within the Contractor's SAM registration, the Designated Primary Administrator will receive an email from the IPP Customer Support Team containing the Designated Primary Administrator's IPP username. Within 24 hours of receiving the initial email, the Designated Primary Administrator will receive a second email containing their IPP password. Once both emails have been received, the Designated Primary Administrator must log into IPP and complete the registration process. � The Contractor's Designated Primary Administrator will be authorized to further designate other administrators under the Contractor's IPP account who may submit invoices on behalf of the Contractor.� The Contractor must ensure that the ""Accounts Receivable POC"" section of its SAM registration is accurate and up to date. In the event that an invoice is rejected, the Contractor shall make the necessary corrections and resubmit the invoice by means of IPP. Any questions, concerns, or issues regarding the use of IPP should be directed to the IPP Customer Support Team, as identified at http://www.ipp.gov/. Quote Due Date: Please email questions to Gary Weaver (Gary.Weaver@ed.gov) �by 12pm EST on Tuesday, August 24, 2021. �The offeror must submit an electronic copy of both volumes of the quote via email to Gary Weaver, Contracting Officer, at Gary.Weaver@ed.gov not later than 9:00 AM EST on Friday, August 27, 2021. �Late quotes will not be considered.
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/e93daac39f5b40828d608ea5f6a4d6b9/view)
- Record
- SN06108390-F 20210826/210824230125 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |