SOLICITATION NOTICE
Y -- Powerhouse and Dam Pump Room Roof Replacement, Russel Dam, Elberton, Georgia
- Notice Date
- 8/24/2021 6:35:39 AM
- Notice Type
- Solicitation
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- US ARMY ENGINEER DISTRICT SAVANNAH SAVANNAH GA 31401-3604 USA
- ZIP Code
- 31401-3604
- Solicitation Number
- W912HN21B5004
- Response Due
- 9/9/2021 10:00:00 AM
- Archive Date
- 09/24/2021
- Point of Contact
- Amy L Collins, Phone: 9126525505, Fax: 9126525828, Whittni C. Hiscox, Phone: 9126525476
- E-Mail Address
-
Amy.L.Collins@usace.army.mil, whittni.c.hiscox@usace.army.mil
(Amy.L.Collins@usace.army.mil, whittni.c.hiscox@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The site visit attendess list has been posted.� ************************************************************************************************************************************************* Amendment 0001 includes changes to the ProjNet Bidder Inquiry Key.� Use the most recent conformed solicitation for your bid.� This solicitation is for Powerhouse and Dam Pump Room Roof Replacement, Russell Dam, Elberton, Georgia.� This acquisition is being offered as a 100% small business set-aside competitive solicitation and will result in a Firm Fixed Price Contract Award.� The magnitude of this requirement per FAR 36.204 is between $1M and $5M.� Project Location: Savannah River, Richard B. Russell Lake, at the Richard B. Russell Power Project, Elbert County, Elberton, Georgia.� Project Description: Powerhouse Roof Areas 1-8, Erection Bay, Visitor Center:��The contractor will complete the removal and replacement of the entire existing two-ply Granule surfaced modified bitumen roof system and walking pads on all roof areas of the Powerhouse/Visitor Center Building.�� Replacement with a new 90-mil 1-ply Ethylene Propylene Diene Terpolymer (EPDM) roof system complete with associated flashings, insulation, sheet metal components and accessories necessary for a watertight roof system. EPDM shall be white in color to reflect solar radiation. New roof shall provide a minimum R value of R-30. New roof system shall drain naturally into existing drains and not hold standing water.� Remove existing roof wall and curb flashings. Remove existing EPDM on all parapet walls. Install new �� heavy duty cover board on both the horizontal & vertical surfaces of all parapet walls of Powerhouse Roof. New 60-mil white EPDM will be installed over the cover boards with bonding adhesive. Walkboards/Walkpads shall be included and will match existing powerhouse layouts around HVAC units, Exhaust Fans, upstream & downstream Parapet wall, Ladder crossovers, and Roof Access Hatch. EPDM Walkway Pads or equivalent shall be used. Walkboards/walkpads shall also be white in color if available. Pump House Roof:� Removal and replacement of entire existing insulated tar and gravel built-up roof systems on concrete deck on Dam Pump Room.� See Figure 2 posted as an attachment in the System for Award Management (SAM).� Remove existing Pump Room roof wall and curb-flashings.� Remove exisiting roofing of all parapet walls.� Install new 1/2"" HD cover board on both the horizontal and vertical surfaces of the parapet walls of Dam Pump Roof roof area.� New 60-mil white EPDM will be installed over the cover boards with bonding adhesive.� Replacement with a new 90-mil 1-ply EPDM complete with associated flashings, insulation, sheet metal components and accessories necessary for a watertight roof system.� EPDM shall be white in color to reflect solar radiation.� New roof shall provide a minimum R value of R-30.� New roof system shall drain natually into exising draings and not hold standing water.� Walkboards/walkpads shall be installed on Dam Pump Room roof from the east side of the roof around exhaust fan.� White EPDM walkway pads or equivalent shall be used. Walkboards/walkpads shall also be white in color if available.�� Option 1: Aluminum catwalk system spanning from the first bay to the last bay of the powerhouse roof. 48� wide, clear width between 42� high guardrails. Catwalk system steps down to roof with handrails. Steps to have 11� treads and 7� max rise.� A Minimum 20-year, no dollar limit, labor & material warranty from the manufacturer shall be provided.� Evaluation Criteria: The contract will be solicited and procured using Sealed Bidding Procedures under FAR Part 14.� Site Visit:� Aug 19, 2021 at 9:00-10:30 am.� This site visit will be in person. Contractors will need to contact Mr. Michael Chirpich at 912-652-6162. Contractors will need to present a valid driver�s license or Government Issued picture ID.� Contractors will need to sign a visitor log book upon arrival and departure from the site visit.� Once you enter the park, you should follow the road to the end where you face a fence directly in front of the dam.� The operator will let you in the gate once you give your name.� There is a parking area next to the dam visitor center where you can park and assemble outside of the building in the overlook area.� You will be let in the building all at once.� �
- Web Link
-
SAM.gov Permalink
(https://beta.sam.gov/opp/3248a0deb0e9426a945ee195a99853b6/view)
- Place of Performance
- Address: Elberton, GA 30635, USA
- Zip Code: 30635
- Country: USA
- Zip Code: 30635
- Record
- SN06108456-F 20210826/210824230125 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |