Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 28, 2021 SAM #7210
SOLICITATION NOTICE

Y -- KS FTFW MACY 10(2) HQ Road, Parking, Refuge Intro Trail

Notice Date
8/26/2021 12:35:20 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF21B000031
 
Archive Date
09/30/2021
 
Point of Contact
Leslie Karsten, Sheri Walsh
 
E-Mail Address
cflcontracts@dot.gov, CflContracts@dot.gov
(cflcontracts@dot.gov, CflContracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET ASIDE. THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: KS FTFW MACY 10(2) PROJECT NAME: HQ Road, Parking, Refuge Intro Trail PROJECT DESCRIPTION: �This project consists of rehabilitation of 0.13 miles of the HQ Entrance Road, 0.37 miles of Trail including a pedestrian bridge, and rehabilitation of a parking lot with sidewalks. The project is in Marais des Cygnes National Wildlife Refuge, which is approximately 40 miles south of Kansas City, KS in Linn County. Construction improvements include roadway excavation, aggregate base, asphalt concrete pavement, minor concrete pavement, concrete sidewalk and trail, bridge construction, signing, pavement markings, and other miscellaneous work. This project includes improvements to the following routes: Entrance Road (RTE 010) Visitor Center Parking (RTE 900), Highway 52 Visitor Kiosk Parking (RTE 901), and Visitor Center ABA Parking (909) connected to the Entrance Road Proposed �Refuge Orientation Trail� east of the Visitor Center/Headquarters New pedestrian bridge on Refuge Orientation Trail Significant quantities: 2,450 SQYD Concrete Sidewalk 1 Pedestrian Bridge with precast, prestressed concrete slab, micropile foundation, structural concrete abutments, steel bridge rail 440 TON Asphalt Concrete Pavement Type I COST RANGE: The proposed project is estimated at a cost between $1,000,000 to $2,000,000. CONSTRUCTION DURATION: November, 2021 thru April, 2021 ADDITIONAL INFORMATION: Anticipated Advertisement: September, 2021 Anticipated Bid Opening: October, 2021 Anticipated Award: October, 2021
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2deaf84115484e828dd8d3828bb007d2/view)
 
Place of Performance
Address: Kansas City, KS, USA
Country: USA
 
Record
SN06112695-F 20210828/210826230130 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.