Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 30, 2021 SAM #7212
SOLICITATION NOTICE

Z -- W912BU21B0017-Inland Waterway C & D Canal Maintenance Dredging

Notice Date
8/28/2021 8:50:43 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST PHILADELPHIA PHILADELPHIA PA 19107-3390 USA
 
ZIP Code
19107-3390
 
Solicitation Number
W912BU21B0017-CDCanalMaintenanceDredging
 
Response Due
9/24/2021 9:00:00 AM
 
Archive Date
10/09/2021
 
Point of Contact
Susan Li, Phone: 2156566765, Gregory C. Keaton, Phone: 2156563826
 
E-Mail Address
susan.li@usace.army.mil, Gregory.C.Keaton@usace.army.mil
(susan.li@usace.army.mil, Gregory.C.Keaton@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers, Philadelphia District, intends to conduct work which consists of Maintenance Dredging, Sta. 00+000 to Sta. 250+440, Inland Waterway Chesapeake and Delaware Canal and Upper Chesapeake Bay � �a. Maintenance dredging under this contract will be performed at various locations along the Inland Waterway Chesapeake and Delaware Canal and Upper Chesapeake Bay portion of this project. � b. Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. � c. Dredging will be required to a depth of 35� MLLW (Datum) plus 1� allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 99+000 and 35� MLLW (Datum) plus 1� allowable overdepth within the contract work limits shown on the drawings from station 99+000 to station 250+440, with no side slopes delineated and/or paid for. � d. Before and after dredging quantities will be computed on the same basis as those issued by amendment to the advertisement. � �e. This is a contour dredging project. f. All dredging (hopper, hydraulic, or bucket) is restricted during the period between April 1 and September 30 annually in order to minimize impacts to migratory fish.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/b671a3913d1f4113bd55b64142ac3b83/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06115079-F 20210830/210828230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.