AWARD

Z -- Building 20602 Remodel DNWS Classroom

Notice Date
9/1/2021 10:33:20 AM
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W075 ENDIST ALBUQUERQUE ALBUQUERQUE NM 87109-3435 USA
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP21Q0066
 
Archive Date
09/09/2021
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
8AN 8(a) Sole Source (FAR 19.8)
 
Award Number
W912Pp21P0038
 
Award Date
08/25/2021
 
Awardee
G2I, LLC NM 87107-4213 USA
 
Award Amount
249260.00
 
Description
1. GENERAL REQUIREMENTS: 1.1 The contractor shall furnish all parts, material, labor, equipment, and supervision necessary to complete the remodel work for a DNWS classroom located at Building 20602. The work shall include the following requirements listed in the specific requirements. The contractor shall assure the DD Form 1354 are completed within 3 working days of �place in service date� and submitted to Kirtland AFB Real Property office to get it staffed to the BCE for signature, at the conclusion of the project. Background: The current classroom is not large enough to support the number of students in each course for the curriculum. DNWS is requesting to remodel the classroom and remove the adjoining wall to enlarge the space for future use and growth of the existing classroom. SPECIFIC REQUIREMENTS: 2.1 Contractor shall remove two (2) cinder block walls between classroom (104B and office (106B) up to the I-beam level in their entirety. All removal and disposal of materials, and/or equipment shall be the responsibility of the Contractor with no additional expense to the Government. All remaining edges and corners shall be protected and flush with existing gypsum board for safety purposes. 2.2 Contractor shall install sheetrock on walls, using 3� studs Ga. 20 and 5/8� thick gypsum board. 2.3 Contractor shall paint walls including primer and 2 coats of paint. All paints to be used shall be submitted as part of the normal submittal procedure and approved by the USACE Contracting Officer Representative. 2.4 Contractor shall install new suspended ceiling using a 2�x2� ceiling tile at the same height than the existing ceiling. Quantity of ceiling tiles required as par to of this project shall be verified at the site visit prior to bidding deadlines. The Contractor is responsible for furnishing all ceiling tiles to provide a complete system both for functionality and aesthetically to blend with surround ceiling surfaces. 2.5 Contractor shall replace lighting with New 2�x2�LED lighting fixtures with dimmer and all associated wiring/switches for a complete and usable system. 2.6 Contractor shall replace lighting fixtures type �can� with LED Recessed �can� Lighting with dimmer as indicated on the drawings and discussed at the site visit. Final quantities shall be the responsibility of the Contractor at no additional expense to the Government. 2.7 Contractor shall replace and paint new three (3) ea. solid core doors and hardware. Colors of paint shall be submitted by the Contractor to the USACE COR for approval prior to application of paint during the construction process. The existing frames will not be replaced; however, the contractor will be required to paint these frames in accordance with project specifications. 2.8 Contractor shall remove one double door and frame, and closed the existing opening using same classroom proposed wall material and finishes. Install panic devices on new doors. 2.9 The Contractor shall remove the existing floor carpet, patch, and install DTRA provided carpet tiles. The carpet tiles provided by DTRA are considered GFCI (Government Furnished Contractor Installed) for the purpose of the construction contract. Carpet adhesives and all associated materials required to correctly install carpet tiles per the manufacturer�s recommendation shall be provided by the Contractor at no additional expense to the Government. 2.10 Clean/shampoo carpet once project is complete utilizing an approved carpet cleaner and applicator designed for carpet tile style areas. 2.11 The contractor shall replace the existing sprinkler escutcheon covers. Exact quantity will be the responsibility of the Contractor at no additional expense to the Government. These quantities can be verified during the site visit conducted prior to bid submission. 2.12 The Contractor shall replace the existing HVAC ceiling diffusers/grills with matching or equivalent grills to ensure adequate throw distance and flow rates into the newly renovated area. 2.13 The Contractor shall remove all existing wall electrical devices, lighting switches, receptacle outlets and any other existing infrastructure, and install new devices to the new gypsum board walls at or near same location in compliance with code height and distance between devices. Additional outlets might be needed following code�s minimum distance between the outlets, and these shall be provided by the Contractor at no additional expense to the Government. The Contractor is responsible for verifying any additional outlet locations, junction box requirements, and ensure breaker capacity is adequate at the nearest panel box in accordance with life safety and NEC requirements. 2.14 The Contractor shall eliminate utilities and drops not in service from the existing walls device location pulling the cables back to the near J-box and terminated. 2.15 The existing column between the classrooms will remains. The contractor shall cover the column perimeter with gypsum board wall panels and apply paint. 2.16 Relocate the existing screens and projectors from the existing walls to the renovated walls. All mounting of screens, projectors, and any other electronic devices shall the responsibility of the Contractor at no additional expense to the Government. Fasteners, brackets, braces, etc. shall be supplied by the Contractor as part of this construction contract. 2.17 Contractor shall install four (4) new drywalls to cover one of the long classroom walls length and three (3) new drywalls at the other long classroom wall. These locations will be identified and measurable during the site visit. Identifying quantities shall be the responsibility of the Contractor and execution of this work shall be at no additional expense to the Government. 2.18 The contractor shall provide raceways for the podium (data, power, signal). NIPR, SVTC and SPR will be required at the podium. All electronic materials and/or equipment shall comply with UFC, NEC, and contract specification requirements. If discrepancies occur between the referenced literature the most stringent requirement shall govern and is the responsibility of the Contractor at no additional expense to the Government.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/a55eaf13261146c199efccf40a550604/view)
 
Place of Performance
Address: Kirtland AFB, NM 87117, USA
Zip Code: 87117
Country: USA
 
Record
SN06118601-F 20210903/210901230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.