SOLICITATION NOTICE

Y -- Fort Hood Fuel Facility Replacement

Notice Date
9/10/2021 5:00:34 PM
 
Notice Type
Solicitation
 
NAICS
237120 — Oil and Gas Pipeline and Related Structures Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT FT WORTH FORT WORTH TX 76102-6124 USA
 
ZIP Code
76102-6124
 
Solicitation Number
W9126G21R0037
 
Response Due
9/20/2021 9:00:00 AM
 
Archive Date
10/05/2021
 
Point of Contact
Paige E Stone, Phone: 8178861124
 
E-Mail Address
paige.e.stone@usace.army.mil
(paige.e.stone@usace.army.mil)
 
Description
10�Sep - Amendment 2 posted in attachments 02 Sep - Amendment 1 posted in attachments 19 Aug- Site Visit Information has been uploaded in attachments. This announcement is an unrestricted Firm-Fixed price acquisition to construct a new Type III Hydrant System at Fort Hood, Texas. The proposed project will be a competitive, firm-fixed price, Design-Bid-Build contract. The North American Industrial Classification System code is 237120, which has a size standard of $39.5 million.� The contract is anticipated to be awarded 30 September 2021. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/SAM/. No state level certifications will be accepted. PROJECT INFORMATION: Construction range is between $25,000,000 and $100,000,000. Contract work consists of Constructing a new Type III Hydrant System that includes above ground fuel storage tanks, pump shelter with a control room. product recovery tank, truck loading points with combined hydrant hose truck checkout stand, truck unloading points, spill containment, and supporting facilities. The new fuel facility will supply a new aircraft direct fuel system to the parking apron at Robert Gray Army Airfield (RGAAF) at Fort Hood. Anti-terrorism (AT/FP), cyber-security, and sustainable design principles are incorporated into the construction. The new hydrant loop includes installing new piping to complete the issue and return loop between the new pump house and the 6 hydrant outlets located at the refueling apron. Piping will include all required supports, valves, and any other necessary appurtenances. The new fuel storage tanks are 6,000 barrels (504,000 gallon) above ground storage tanks and include all associated piping and equipment automatic tank gauging, independent alarm system, platforms, railing, stairs, tank foundations and supports. The new standard Type III pump shelter will contain an enclosed control room, mechanical room, restroom, and open-sided pump area as well as emergency shut-off switches, emergency shower and eyewash, HVAC, fire sprinklers, alarms, bridge crane, pump controls, grounding and lightning protection, pig launcher and receiver stations, communications and data infrastructure, and leak detection systems. Provide an above ground double-wall product recovery tank and all associated piping, pumps, valves, and appurtenances. The new standard Type III POL pump equipment will include 600-GPM pumps, 1,200-GPM receipt filter separators, 600-GMP issue filter separators, and all related piping, piping supports, pumps, valve, and appurtenances. New fill stands and truck unloading points will be constructed. This work also includes refueler truck load and unload containment areas, hydrant hose truck checkout stand, well as all mechanical equipment, pumps, grounding, spill containment, piping, and supports along with Site improvements Demolition and site preparation includes removing the existing hydrant pits at the fueling apron, associated piping and appurtenances, pavement and site clearing and grading. After solicitation issuance, contractors may view and or download this solicitation, specifications and all amendments at the following internet addresses: SAM.gov website at https://sam.gov/. Type in the search box the solicitation number W9126G21R0037. The use of the websites requires prior registration. Plans and specifications will NOT be made available in paper format or on compact disc. It is the Offerors responsibility to monitor the SAM.gov website and or any other official government website for amendments to the solicitation. You must be registered with the SAM, to receive a Government contract award. Phase1 proposals are due on 10 September 2021 (unless extended by amendment). If the Government elects to conduct a pre-proposal conference or site visit, it will be conducted after the Phase 2 selection has been made. The Primary Point of Contact for this project is Paige Stone, Contract Specialist, email is paige.e.stone@usace.army.mil All questions MUST be received through email for record. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. Accordingly, prospective contractors may view and/or download the solicitation and all amendments from the SAM website after solicitation issuance. Contractors shall register themselves at this website under the solicitation number to receive a copy of the solicitation
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/55b8a8637dd046cf816ef92895ac6cd2/view)
 
Place of Performance
Address: TX, USA
Country: USA
 
Record
SN06128927-F 20210912/210910230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.