Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 22, 2021 SAM #7235
AWARD

Z -- Tampa Harbor Maintenance Dredging 34-Foot Project, Upper Channels Hillsborough County, Florida

Notice Date
9/20/2021 6:37:34 PM
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-8175 USA
 
ZIP Code
32207-8175
 
Solicitation Number
W912EP21C0020
 
Archive Date
10/05/2021
 
Point of Contact
Jennifer Carter, Phone: 2392212029, Tedra Thompson, Phone: 9042321051
 
E-Mail Address
Jennifer.L.Carter@usace.army.mil, tedra.n.thompson@usace.army.mil
(Jennifer.L.Carter@usace.army.mil, tedra.n.thompson@usace.army.mil)
 
Award Number
W912EP21C0020
 
Award Date
09/20/2021
 
Awardee
Orion Marine Construction, Inc. FL 33607-3919 USA
 
Award Amount
3457704.87
 
Description
Tampa Harbor Maintenance Dredging 34-Foot Project, Upper Channels�consists of a base and three options as indicated below. For the Base and two dredging options, channels will be dredged to a required depth of 34 feet MLLW with 2 feet of allowable overdepth and all dredged material shall be disposed of in the Dredge Material Placement Facility (DMPF) 3-D, located approximately 4 nautical miles South from Port Sutton Entrance Channel. Work also includes environmental species monitoring, turbidity monitoring, bird monitoring, sea turtle trawl sweeping and overall management of disposal operations at DMPF-3D. Base - Work consists of estimated 62,000 CY maintenance dredging the locations shown on the drawings within the Upper Sparkman and Lower Sparkman channels. Option A - Work consists of estimated 23,000 CY maintenance dredging the locations shown on the drawings within the Ybor channel. Option B - Work consists of estimated 50,000 CY maintenance dredging the locations shown on the drawings within the East Bay Extension channel. Option C - Work consists of the repair of the southern dike slope on DMPF-3D and existing gully locations shown on the drawings. The repair will include the use of fill material sourced from inside of the southern end of DMPF-3D as well as the installation of a rip-rap revetment.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/0e2fa00ed3084ef5bd4972c9817c8bce/view)
 
Place of Performance
Address: Tampa, FL, USA
Country: USA
 
Record
SN06137734-F 20210922/210920230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.