Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 30, 2021 SAM #7243
SOLICITATION NOTICE

C -- INDEFINITE-DELIVERY INDEFINITE-QUANTITY ARCHITECT-ENGINEER CONTRACT; MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION; NAVFAC SW

Notice Date
9/28/2021 3:57:13 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
541330 — Engineering Services
 
Contracting Office
NAVFAC SOUTHWEST SAN DIEGO CA 92132-5000 USA
 
ZIP Code
92132-5000
 
Solicitation Number
N62473-21-R-1224
 
Response Due
10/19/2021 10:00:00 AM
 
Archive Date
11/03/2021
 
Point of Contact
Mary Grace Cortez, Phone: 619-705-4638, Harold W. Hayes, Phone: 619-705-4646
 
E-Mail Address
marygrace.cortez@navy.mil, harold.hayes@navy.mil
(marygrace.cortez@navy.mil, harold.hayes@navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
N62473-21-R-1224 INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT FOR MECHANICAL ENGINEERING, ELECTRICAL ENGINEERING, PLUMBING, AND FIRE PROTECTION ARCHITECT-ENGINEER SERVICES AT VARIOUS MILITARY INSTALLATIONS LOCATED IN THE NAVFAC SOUTHWEST (SW) AREA OF RESPONSIBILITY (AOR): CALIFORNIA, ARIZONA, NEVADA, COLORADO, NEW MEXICO, AND UTAH; BUT MAY BE AVAILABLE WORLDWIDE. Description: ALL INFORMATION NEEDED FOR INTERESTED PARTIES TO SUBMIT A STANDARD FORM SF-330, ARCHITECT ENGINEER QUALIFICATIONS, IS CONTAINED HEREIN. THERE IS NO SEPARATE REQUEST FOR PROPOSALS (RFP) PACKAGE TO DOWNLOAD. THIS IS A SMALL BUSINESS SET-ASIDE. This procurement will result in one Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Mechanical Engineering, Electrical Engineering, Plumbing, and Fire Protection Architect-Engineer (AE) services for various projects at various military installations located in the NAVFAC SW AOR: California, Arizona, Nevada, Colorado, New Mexico, Utah, but may include work worldwide. The preponderance of work is expected to be in Southern California. These services will be procured in accordance with 40 USC Chapter 11, Selection of Architects and Engineers, as implemented by FAR Subpart 36.6. The IDIQ contract will be for a base period of two (2) years and two (2) three (3)-year option periods, for a total of eight (8) years. The total fee for the contract term shall not exceed $40,000,000. The guaranteed minimum for the contract term is $5,000. Firm-fixed price task orders will be negotiated for this contract. The minimum value of individual task orders executed under this contract is $200,000 and the maximum value is $2,500,000. There will be no dollar limit per year. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates. Estimated start date is September 2022. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE PROCUREMENT. The Small Business size standard classification is North American Industrial Classification System (NAICS) Code 541330 (Engineering Services). The Government seeks the most highly qualified firm to perform the required services, based on the demonstrated competence and qualifications, in accordance with the selection criteria. The Offeror/Contractor must demonstrate adequate in-house staffing capable to self-perform at least 50 percent of the cost of the contract as required by FAR Clause 52.219-14 (b)(1) Limitations on Subcontracting (MAR 2020). A market research study was conducted by NAVFAC SW that included an assessment of relevant qualifications and capabilities of potentially qualified firms. Upon review of the market research, the U.S. Small Business Administration (SBA) in San Diego determined that a Small Business Set-Aside procurement is appropriate. The NAVFAC SW small business office concurs with the SBA determination. A-E services required: a. PRIMARY SERVICES: Preparation of Requests for Proposals (RFP) for Design Build (DB) projects; Design-Bid-Build (DBB) construction contract packages (i.e., full plans and specifications); Mechanical/Electrical Site Investigations, Studies, Surveys, and Reports. b. SECONDARY SERVICES: Cost estimates; construction contract support services (CCSS) or post construction award services (PCAS); Fire Protection Engineering Designs, Studies, Surveys and Site Investigation (e.g. fire risk/hazard analysis, life safety code analysis, fire modeling and engineering documentation, antiterrorism, and final inspections and tests of installed Fire Protection Systems. Fire Protection surveys shall be conducted within the guidelines established by OPNAVINST 11320.23G. c. SUPPORT SERVICES WHICH MAY BE REQUIRED: Technical reviews of government-prepared RFP for DB projects and/or full plans and specifications for DBB projects; preparation of planning and programming support documents (such as DD1391 documents); incidental architectural, civil, structural, geotechnical, and environmental work; identification and abatement methods for existing asbestos-containing materials, lead-based paint, and other hazardous materials. Types of projects will include, but are not limited to, sustainable energy documentation (e.g. Energy Master Planning, Commissioning, Life Cycle Cost, LEED/Third Party Certifications, Title 24 Energy Compliance documents, ASHRAE 90.1 compliance documents, and ASHRAE 90.1 Performance Rating Method reports); Military Construction (MILCON), new construction, major repair/renovation of: onsite power generating systems (e.g. solar, cogeneration); control systems (e.g. microgrid, utility control systems); heating, ventilation, air conditioning and control systems (e.g. exhaust systems, direct digital control schematic and architecture); energy supply systems (i.e. above and below ground steam distribution, high temperature/pressure water, refrigeration systems, and natural gas including earthquake shut off valves); plumbing systems; interior and exterior electrical power systems (e.g. interior building power, medium and low voltage distribution systems, primary and secondary substations, Uninterruptable Power Supply (UPS), emergency generators); communication and security systems (e.g. cable TV, electronic security systems); fire protection systems (e.g. fire sprinklers, fire alarm and detection systems, fire alarms and fire resistant building assemblies); and lighting systems for airfield, operational and training, commercial, institutional, industrial, research development, quality of life facilities, etc. All contractors are advised that registration in System for Award Management (SAM) Database is required prior to award of a contract. Failure to register in the SAM Database may render your firm ineligible for award. For more information, check the SAM Web site: https://www.sam.gov. The Special Contracts Requirement section of the contract will contain the following contract language addressing organizational conflicts of interest: �Review of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest is encouraged. The intent is to identify and evaluate potential conflicts of interest prior to contract award. Generally, if the Contractor/affiliates/subcontractors under this contract prepares or assists in preparing a statement of work, specifications and plans, the Contractor and its affiliates and any subcontractors/subconsultants may be ineligible to bid or participate, in any capacity, in any contractual effort which is based on such statement of work or specifications and plans as a prime contractor, subcontractor, consultant or in any similar capacity. In addition, the Contractor and its affiliates and/or subcontractors under this contract are ineligible to bid or participate, in any capacity, in any contractual effort which is based upon a statement of work, specifications and plans which the Contractor and its affiliates and/or subcontractors previously prepared or assisted in preparing.� The prime firm for this contract will be required to perform throughout the contract term. Interviews may be scheduled with firms slated as the most highly qualified. Firms slated for interviews may be asked to clarify information contained in the SF-330 submittal. Elaborate presentations are not desired. SELECTION CRITERIA: Firms responding to this synopsis will be evaluated to determine the most highly qualified firms to perform the required services in accordance with the published selection criteria. Failure to comply with instructions, or provide complete information may affect the firm�s evaluation or disqualify the firm from further consideration. Criteria 1 and 2 are considered most important and of equal importance to each other; Criteria 3, 4, and 5 are of lesser importance and listed in descending order of importance; and Criterion 6 is of lesser importance and will be used as a tiebreaker among firms considered to be technically equal. Evaluation of past performance and experience may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers may result in a firm being considered less favorably in the evaluation. Specific selection criteria include: 1. Professional Qualifications 2. Specialized Experience & Technical Competence 3. Past Performance 4. Quality Control 5. Program Management, Capacity, and Location 6. Volume of Work Criterion 1�Professional Qualifications (SF330, Part I, Sections E & G): Firms will be evaluated on professional qualifications, competence, and experience of the proposed key personnel in providing services to accomplish the tasks required under this contract, including participation in example projects in the SF-330, Part I, Section F. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide specialized expertise. All key personnel must be professionally registered/accredited (see definition) in their discipline. Specific disciplines that must be included in key personnel are: the Program Manager; Quality Control Managers; and professionally registered Electrical Engineers, Mechanical Engineers, and Fire Protection Engineer. Provide additional Project or Task Order Managers and Engineers, as applicable. Key personnel demonstrating experience with projects located at Navy and Marine Corps military installations may be considered more favorably in the evaluation. Firms that have both the Mechanical and Electrical Quality Control Managers as part of the Prime A-E firm may be considered more favorably. All key personnel must include the state where registration was issued, registration number, expiration date of registration, and geographic office location for each proposed key personnel member. Key personnel not providing mechanical, electrical, or fire protection engineering services will not be evaluated. Submission Requirements: SF-330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate experience in the A-E services for the relevant project types proposed under this contract. Non-relevant information will not be considered. Resumes of personnel performing only support services (as listed in this contract) are not required and will not be considered. The designated Program Manager shall either be a professionally registered Electrical Engineer or a professionally registered Mechanical Engineer, and be an employee of the prime A-E firm. Provide one (1) designated Quality Control Manager that is a professionally registered Electrical Engineer and one (1) designated Quality Control Manager that is a professionally registered Mechanical Engineer. At least one (1) of the designated Quality Control Managers shall be an employee of the prime A-E firm.� The prime A-E firm shall have a minimum of one (1) professionally registered Electrical Engineer on staff and one (1) professionally registered Mechanical Engineer on staff, in addition to the Program Manager, to perform the anticipated work of this contract. In addition, provide at least one (1) registered professional Fire Protection Engineer. See definitions at the end of this notice for professional registration and experience requirements. Resumes of key personnel shall demonstrate their depth of experience in their respective roles. Each resume shall include a maximum of five (5) specific relevant projects and should indicate: professional registration, certification, licensure and/or accreditation in appropriate disciplines; cite recent (within the past five (5) years immediately preceding the date of issuance of this notice) and complete projects (see definition) - that exhibit specific experience in work relevant to the A-E services required under this contract; and indicate proposed role and responsibility in this contract. Identifying only the individual�s job title will not provide sufficient information to determine their specific experience as it relates to services to be performed under this contract. Submit a copy of the applicable current professional certification/registration/accreditation certificate (personnel with registration in multiple states need only submit a copy from one state). Projects not meeting these requirements will not be considered. Indicate participation of key personnel in example projects in the SF-330, Part I, Section G. Criterion 2 �Specialized Experience & Technical Competence (SF-330, Part I, Section F): Firms will be evaluated on specialized experience in performance of services similar to those anticipated under this contract through evaluation of experience in: The proposed team�s experience and technical competence in the primary and secondary A-E services for project types identified for this contract. Experience applying sustainability concepts through an integrated, cost effective design approach and designing in accordance with recognized sustainability rating systems such as Green Globe, LEED, etc. Firms may be considered more favorably by demonstrating the following: Offeror demonstrating a depth of relevant experience with the primary and secondary engineering services expected for this contract. Offeror demonstrating a depth of self-performed relevant experience with both mechanical and electrical projects expected for this contract. Submission requirements: Provide a maximum of ten (10) completed projects (see definitions) within the past five (5) years immediately preceding the date of issuance of this notice that best demonstrate specialized experience of the proposed team in performing the primary and secondary A-E services for project types identified for this contract. Projects providing only PCAS experience will not be considered. Sufficient information to determine the date of completion of the project must be included in the project description or the project will not be considered. All relevant projects shall have a professional fee of $250,000 or more. If more than ten (10) projects are submitted, the Government will only evaluate the first ten (10) projects in the order submitted. Additional requirements: A minimum of one (1) project shall demonstrate relevant experience with projects having professional fees of $500,000 or greater. A minimum of one (1) project shall demonstrate relevant self-performed (see definition) experience with the preparation of a Request for Proposal for Design-Build for a new building HVAC system or the renovation/repair of an existing HVAC system. A minimum of one (1) project shall demonstrate relevant self-performed (see definition) Design-Bid-Build experience (i.e. full plans and specs, not just PCAS services) of a mechanical system. A minimum of one (1) project shall demonstrate relevant experience with the preparation of a Request for Proposal for Design-Build or with the design (i.e. full plans and specs, not just PCAS services) for each of the following: Exterior electrical power system with a minimum of 15kV (i.e., overhead and underground distribution systems, primary and secondary substations, emergency generators, etc.) Fire protection system and life safety features for a facility. Note: A single project may satisfy more than one of the above minimum requirements. All projects provided in the SF-330 must be completed by the actual office/branch/regional office/individual team member proposed to manage and perform work under this contract identified in SF-330, Part I, Section C. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the DUNS number along with each firm name in the SF-330 Part I, Section F, block 25, �Firm Name�. Include a contract number or project identification number in block 21. Include the month and year of completion in block 22. Include an e-mail address and phone number for the point of contact in block 23(c). In block 24, include in the project description the type of project and its relevance to the scope of this contract, the contract period of performance, award contract value, current contract value, relevant sustainable features incorporated in the project, and a summary of the work performed that demonstrates relevance to specialized experience as outlined above. Firms with multiple offices shall indicate which office/branch performed the A-E services. For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project could be eliminated from consideration. NOTE: If the firm is a joint venture, projects performed by the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects must be submitted for each joint venture partner, not to exceed the ten (10) project limitation. Firms failing to provide projects from all joint venture partners will be considered to have not met the requirements of the criterion. In cases where the submitted project was performed by a JV, but all JV partners for that project are not on the team identified in Part I, Section C, specifically describe the relevant work performed by the JV partner(s) proposed for this contract. Projects shall be submitted on the SF-330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not submit an IDIQ contract as an example project. Instead, submit a relevant task order or stand-alone contract award that fits within the definition above. The Government will not evaluate information provided for an IDIQ contract. Examples of project work submitted that do not conform to this requirement will not be evaluated. All information for Criterion 2 should be submitted in the SF-330, Part I, Section F. The Government WILL NOT consider information submitted in addition to Part I, Section F in evaluation of Criterion 2. Criterion 3�Past Performance (SF330, Part I, Section H): � Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS/ACASS for Criterion 2 projects and may include customer inquiries, Government databases, and other information available to the Government including contact with points of contact in other criteria. NOTE: Past performance information for projects listed under Criterion 2 may be given greater weight. Submission Requirements: SUBMIT A COMPLETED CPARS/ACASS EVALUATION FOR EACH PROJECT UNDER CRITERION 2. IF A COMPLETED CPARS/ACASS EVALUATION IS NOT AVAILABLE, the Past Performance Questionnaire (PPQ) (Attachment (A)) included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 2. DO NOT SUBMIT A PPQ WHEN A COMPLETED CPARS/ACASS IS AVAILABLE. Submitted CPARS/ACASS and PPQ evaluations will not be counted as part of the 30-page limitation and shall be attached to the SF-330, behind the SF-330 Part II document. IF A CPARS/ACASS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF-330. If the firm is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the PPQ (Attachment (A)), which will provide contract and client information for the respective project(s). PPQ evaluations that are completed by a team member identified in Part I, Section C of the SF-330 are considered interested parties to this solicitation and will not be evaluated. Firms may submit a PPQ previously submitted under a different Notice/RFP (copies must be legible) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, Naval Facilities Engineering Systems Command Southwest, Code DCMAR, Attn: Mary Grace Cortez via email at marygrace.cortez@navy.mil prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A-E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 2. Firms may also address any adverse past performance issues. Information shall not exceed two double-sided pages (or four single-sided pages) in total. Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation. Criterion 4�Quality Control Program (SF330, Part I, Section H): Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract, along with the means of ensuring quality services from their consultants/subcontractors. Submission Requirements: Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall: Explain the quality control program including an example of how the plan has worked for one of the projects submitted under Criterion 2 or how the plan will work if it has not been used previously. Provide a quality control process chart showing the inter-relationship of the management and team components. Describe specific quality control processes and procedures proposed for this contract to ensure technical accuracy of and assurance of overall coordination of plans and specifications, and engineering and design services. Identify the design quality control managers and any other key personnel responsible for the quality control program and a description of their roles and responsibilities. One (1) designated Quality Control Manager shall be a professionally registered Electrical Engineer and one (1) designated Quality Control Manager shall be a professionally registered Mechanical Engineer.� At least one (1) of the designated Quality Control Manager shall be an employee of the prime A-E firm Describe how the firm�s quality control program extends to management of subcontractors. For offerors who are joint ventures and/or teams with offices in a variety of locations, describe how the QC effort will be implemented across the various team offices. Describe from which office the QC program will be managed/coordinated and the plan/methods to ensure effective QC and communication between offices. Criterion 5�Program Management and Capacity and Location (SF330, Part I, Section D & H): Firms will be evaluated on the firm�s ability to plan for and manage work under the contract, the capacity to accomplish the work in the required time, and on the locations of their office(s) that will be performing the work under this contract and demonstrated knowledge of the primary geographic areas in which projects could be located. Submission Requirements: Provide an organizational chart for the team in the SF-330, Part I, Section D and discuss the management plan for this contract and personnel roles in the organization. Identify on the submitted organization chart the relationships and lines of authority of the proposed team members, including key subcontractors. Note: All individuals listed on the organization chart are not required to have a resume in Section E, such as administrative or lower level engineering positions. Describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and subcontractors. Discuss the history of working relationships with team members, including joint venture partners where applicable. Describe the firm�s present workload and the availability of the project team (key personnel and subcontractors) for the specified contract performance period. Describe the ability of the firm to accomplish multiple large task orders simultaneously and strategies to meet surges in unexpected workload demand. Describe the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services. General statements of availability/capacity may be considered less favorably. Provide the location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members. Evaluation of firms will include consideration of the location of their offices and key personnel within the primary geographic area of the anticipated projects, primarily NAVFAC SW AOR. Provide a narrative describing the team�s knowledge of the primary geographic areas in which projects could be located and the team�s availability and ability to ensure timely response to requests for onsite support at Government installations throughout the NAVFAC SW AOR. Firms with a main office outside Southern California shall address how they would effectively communicate, collaborate, and share data with clients and subcontractors. Firms with a main office in Southern California may be considered more favorably in the evaluation. Criterion 6�Volume of Work (SF330, Part I, Section H) Firms will be evaluated in accordance with DOD Federal Acquisition Regulation Supplement (DFARS) Procedures, Guidance and Information (PGI) 236.602-1, from data extracted from the Federal Procurement Data System (FPDS). In the case of a joint venture (JV), data will be extracted for the JV and for each JV partner. Firms will be evaluated in terms of work previously awarded to the firm by DOD within the past twelve months with the objective of effecting an equitable distribution of contracts among qualified A&E firms including small, disadvantaged business firms, and firms that have not had prior DOD A&E contracts. Submission Requirements: Firms do not submit data for this factor. SF-330 SUBMISSION REQUIREMENTS: Architect-Engineer firms desiring to be considered for this contract must submit a completed SF-330 package. The SF-330 shall be typed, one sided, at least 11 point Times New Roman or larger. Part I shall not exceed thirty (30) single-sided 8.5 by 11 inch pages (the page limit does not include the Organizational Chart, certificates, PPQs, licenses, nor does the page limit include cover sheets or dividers, provided these do not contain any substantive information submitted in response to the synopsis or intended to demonstrate the qualifications of the firm). Part I pages shall be numbered sequentially. The organizational chart in Section D may be one-page single sided 11 by 17 foldout, using 11 point font or larger (font limitations do not apply to graphics, captions or tables). The Organization Chart will not be counted against the 30-page limitation. Please include your DUNS and CAGE numbers in Block 30 of the SF-330. In accordance with the FAR 36.601-4(b) contracts for architect-engineer services may only be awarded to firms permitted by law to practice the professions of architecture or engineering. Firms must submit proof that they are permitted by law as required by FAR 36.601-4(b). If a firm is in a jurisdiction that requires AE firm registration, the firm must provide proof of registration. If a firm is in a jurisdiction that does not require AE firm registration, the firm must provide proof of eligibility to practice (e.g., a summary explaining under the laws of that jurisdiction.) This documentation is not counted as part of the 30-page limitation. Failure to submit the required proof could result in a firm�s elimination from consideration. Firms who are offering as a joint venture should include with their submission a copy of the joint venture agreement. Failure to include the joint venture agreement may result in the firm�s elimination from further evaluation. Architect-engineer firms that meet the requirements described in this announcement are invited to submit an electronic response. Responses are due no later than, 1:00 P.M. Pacific Daylight Time on Tuesday, October 19, 2021. THIS IS NOT A REQUEST FOR PROPOSAL. Responses shall be submitted electronically using the Department of Defense (DoD) Secure Access File Exchange (SAFE) service at https://safe.apps.mil, via the �Drop-off� feature. DoD SAFE is the only electronic commerce method authorized for the submission of responses. Submissions outside of DoD SAFE will not be considered. Instructions for submission of responses using the DoD SAFE �Drop-off� feature are provided below: 1. There are no user accounts for DoD SAFE. In order to submit a response, firms shall submit their point of contact (POC) name and email address via email to the following Contract Specialists identified below to obtain a �Request Code� for DoD SAFE �Drop-off�. Contract Specialist:������������ Mary Grace Cortez, marygrace.cortez@navy.mil Contracting Officer:����������� Harold Hayes, harold.hayes@navy.mil Note: The Government does not intend to respond to emails for drop-off request codes submitted less than 10 calendar days before the response due date shown in the announcement. 2. No later than 4 calendar days prior to the response due date, the Contract Specialist or Contracting Officer will send a �Request Code� to the firm�s specified POC via the email address provided. Only the firm�s identified POC will be able to drop off the response in DoD SAFE. Failure to provide accurate POC information will preclude the firm from using DoD SAFE. 3. Firms are instructed to submit their complete response in one (1) single file, formatted in Portable Document Format (PDF) with a .pdf file extension. 4. To submit the response, the firm will go to the DoD SAFE website at https://safe.apps.mil, accept the user agreement, click �Drop-off,� and enter the 12-digit �Request Code� that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Government recipient. The firm will then click to add their response file, or drag and drop the file. Click �Drop-off Files� to send the file to the Government recipient. Confirm that the file does not contain classified information and click �OK.� Once the file is uploaded, an email will be sent to the Government recipient notifying them of the �drop-off.� [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil/about.php]. The DoD SAFE system will record the date and time of proposal submission. The date and time of proposal submission recorded in DoD SAFE shall govern the timeliness of any response. The maximum allowable file size for DoD SAFE is 8GB. DoD SAFE recommends using Firefox, Chrome, or Edge browsers. Internet Explorer is not recommended. Please note that Internet Explorer limits uploads to 2GB. Late responses will be handled in accordance with FAR 52.215-1. The point of contact is Mary Grace Cortez, Contract Specialist, at marygrace.cortez@navy.mil. If an SF-254/SF-255 is submitted for this solicitation, it will not ...
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/2fc4b6537bab4c099910646f4a2e0d4b/view)
 
Place of Performance
Address: San Diego, CA 92132, USA
Zip Code: 92132
Country: USA
 
Record
SN06146326-F 20210930/210930203411 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.