Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 07, 2021 SAM #7250
SOLICITATION NOTICE

Y -- UT FLAP 218(1) Sheep Creek Loop

Notice Date
10/5/2021 2:59:58 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF22B000002
 
Response Due
10/19/2021 1:00:00 PM
 
Archive Date
11/03/2021
 
Point of Contact
CFL Contracts
 
E-Mail Address
cflcontracts@dot.gov
(cflcontracts@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT DESCRIPTION:� The UT FLAP 218(1), Sheep Creek Geologic Loop Project is located on Highway 218 approximately 7 miles south of Manila, UT in Northeast Utah. The project crosses through private and Ashley National Forest (USFS) Lands, providing access to the Flaming Gorge-Uintas National Scenic Byway. The route is categorized as a rural recreational and scenic roadway in level terrain and is maintained by Dagget County. This project proposes reconstruction, widening, minor profile adjustments, guardrail replacement, and drainage improvements of 1.85 miles of roadway on the Sheep Creek Geologic Loop. Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety.� Construction will generally include cut slopes, embankment, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including a concrete box culvert), cattleguard installation, pavement markings, and updating signing. �Select pullouts and access road intersections will also be rehabilitated or reconstructed. ��� SIGNIFICANT QUANTITIES (Schedule A): 20401-0000 Roadway Excavation: 4,600 CUYD 20403-0000 Unclassified Borrow: 1,050 CUYD 30202-2000 Roadway Aggregate, Method 2: 5,700 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 3,800 TON 60222-1800 8 Feet Span, 4 Feet Rise Reinforced Concrete Box Culvert, Double Barrel: 40 LNFT ENGINEER�S ESTIMATE:� Estimated total cost is $2.5M - $3.5M. CONSTRUCTION DURATION:� Construction is anticipated between March 2022 and September 2022. MISCELLANEOUS: Weekday road closures to public traffic will be allowed during a large portion of the construction activities.� Access through the closure to USFS permit holders and local property owners will be required at all times.�� For all other work, construction-caused delays to public traffic will be limited to a maximum of 30 minutes per passage through the project. Perform pre-construction nesting bird survey within 7 days before vegetation removal performed prior to August 1.� Due to weather restrictions, on-site construction typically cannot occur until March. Seeding must take place between the dates of September 15 and November 15.� ADDITIONAL INFORMATION FOR NOTICE Anticipated advertisement in October 2021. Anticipated bid opening in November 2021. Anticipated Award in December 2021. Anticipated Notice to Proceed in January 2022. Anticipated Ground-Breaking Construction March 2022
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/0efb66f8bada4d8abb2a65009f608460/view)
 
Place of Performance
Address: Manila, UT 84046, USA
Zip Code: 84046
Country: USA
 
Record
SN06151432-F 20211007/211005230105 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.