Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 09, 2021 SAM #7252
SOLICITATION NOTICE

J -- CGC HEALY CFW COOLER PIPE REPAIR

Notice Date
10/7/2021 8:50:19 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z08522QLRE0003-S00
 
Response Due
10/12/2021 5:00:00 AM
 
Archive Date
10/27/2021
 
Point of Contact
ERIC FOSTER, Phone: 5104375431, Anthony J. Andaluz
 
E-Mail Address
Eric.T.Foster@uscg.mil, anthony.j.andaluz@uscg.mil
(Eric.T.Foster@uscg.mil, anthony.j.andaluz@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. Past performance will be considered in the selection of the awarded vendor. Scope of Work: CGC Healy PROVIDE Parts and Labor to repair damage to the MSW Piping for the #3 CFW System POP: 13-17October Location: USCG Base Boston Background: Healy has experienced a failure of the Leslie solenoid Valves for the #1 Evaporator Summary: Main Sea Water Cooling Supply pipe to CFW Cooler #3, the 8-inch diameter CuNi pipe is leaking at a steady stream due to a 1/ 16th inch pin hole near the weld seam on the flange attached to the cooler. Hole is approximately 1/4 inch from flange face connecting to plate cooler. Recommend replacement of the entire section of pipe from flange to flange - from plate cooler to before drain valve approximately 8 linear feet with one 90 deg bend. There are two threaded bungs for an inline drain valve and temp gauge. Statement of Work: CTR will provide the following: 1.����������� CTR inspect the area to determine the amount of usable metal. 2.����������� CTR will renew the affected area of piping. 3.����������� CTR will submit a CFR at the completion of work.� Required Parts from Contractor: �������������� Pipe is 8"" MSW125-038 per CGDWG WAGB 256-001 SH 5 of 6. Pipe material: Copper Nickel 90-10 Seamless MIL-T-16420K{1) Type-1 CL-200 Grade-1 Annealed as per CGDWG WAGB 256-001 SH 2 of 6. Numbers stamped on flange: B16-8""-150-CuNil0Fe, BI-1205526496. Gov. Furnished Equipment: �������������� N/A INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO Eric.T.Foster@uscg.mil COST BREAKDOWN OF QUOTE INCLUDING BUT NOT LIMITED TO LABOR COST PER HOUR AND MATERIALS IS REQUIRED.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/9613004fc78d4477b97adecbc9f06fb1/view)
 
Place of Performance
Address: Boston, MA 02109, USA
Zip Code: 02109
Country: USA
 
Record
SN06153452-F 20211009/211007230116 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.