Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 09, 2021 SAM #7252
SOLICITATION NOTICE

Y -- CA FTNP YOSE 15(2) Glacier Point Road

Notice Date
10/7/2021 9:40:18 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF21B000032
 
Archive Date
12/31/2021
 
Point of Contact
Ryan Phillips, Josie Helms
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Description
THIS IS NOT A�REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. CA FTNP YOSE 15(2) Glacier Point Road Project Description: This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 10.6 miles of Glacier Point Road from Badger Pass (Milepost (MP) 5.1) to the Glacier Point Parking Area (MP 15.7) and pavement preservation of approximately 5.1 miles of Glacier Point Road from Chiniquapin (MP 0.0) to Badger Pass (MP 5.1) within Yosemite National Park, in Mariposa County, California.� Work also includes construction of 2 retaining walls, subgrade stabilization, rehabilitation/reconstruction of multiple parking areas including Sentinel Dome Trailhead, Washburn Point and Glacier Point, and drainage improvements, including culvert cleaning, lining and replacement.� The terrain is mountainous with the elevation for the work ranging between 6,400 and 7,600 feet. The estimated price range is between $25,000,000 and $40,000,000. The anticipated advertisement date is late September 2021 with construction anticipated from April 2021 to October 2023. Estimated principle work items include: 46,000 tons of asphalt concrete pavement, gyratory mix, 74,000 linear feet of concrete curb, 17,000 tons of aggregate base,� 18.2 miles of full depth reclamation, 17,000 square yards of asphalt paved ditch, 40 each stone masonry headwalls, 900 cubic yards of riprap, 800 linear feet of lining pipe culverts, and 1,200 linear feet of metal pipe culverts. All of the work is occurring in natural resource sensitive areas.� Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction. This will be solicited as a full and open competition.
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/9becbbc7bd7b4bfca500cd87d9fbe4c5/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN06153549-F 20211009/211007230117 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.