Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 14, 2021 SAM #7257
SOLICITATION NOTICE

Z -- FY22 Riley Pass Bluff B Northeast Reclamation Project

Notice Date
10/12/2021 8:32:13 AM
 
Notice Type
Presolicitation
 
NAICS
562910 — Remediation Services
 
Contracting Office
Regional Office, R1 MISSOULA MT 59804 USA
 
ZIP Code
59804
 
Solicitation Number
1240LU22R0002
 
Response Due
12/1/2021 11:00:00 AM
 
Archive Date
12/16/2021
 
Point of Contact
Tina Cook, Contracting Officer, Phone: 406-544-5807, David Shimek, Civil Engineer, Phone: 406-255-1422
 
E-Mail Address
tina.cook@usda.gov, david.shimek@usda.gov
(tina.cook@usda.gov, david.shimek@usda.gov)
 
Description
This is a PRE-SOLICITATION NOTICE only.� THE REQUEST FOR PROPOSAL SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AFTER DEC. 1, 2021.� The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract. (b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following: � Mobilization, demobilization, bonding and insurance � Construction surveying and staking � Erosion control � Site Preparation � Excavating, loading, placing and compacting mine wastes Project Information (a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota. The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary. The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF). (b) Price Range. The project magnitude is estimated to be between $1 million to $5 million. (c) Site Visit.� There will be a Site Visit for this project after the solicitation notice is posted.� The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/7cfb53dacc294ad7b7f8cf73555b3d70/view)
 
Place of Performance
Address: Ludlow, SD 57755, USA
Zip Code: 57755
Country: USA
 
Record
SN06155742-F 20211014/211012230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.