Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 28, 2021 SAM #7271
SOLICITATION NOTICE

17 -- PISTONS,MATCHED SE,

Notice Date
10/26/2021 11:51:39 AM
 
Notice Type
Solicitation
 
NAICS
333999 — All Other Miscellaneous General Purpose Machinery Manufacturing
 
Contracting Office
DLA AVIATION AT PHILADELPHIA, PA PHILADELPHIA PA 19111-5098 USA
 
ZIP Code
19111-5098
 
Solicitation Number
SPRPA121QZ094
 
Response Due
11/15/2021 12:00:00 AM
 
Archive Date
11/30/2021
 
Point of Contact
Telephone: 2157373794
 
E-Mail Address
SHAWN.FRANK@DLA.MIL
(SHAWN.FRANK@DLA.MIL)
 
Description
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19|||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|INVOICE AND RECEIVING REPORT|INSPECTION:ORIGIN / ACCEPTANCE: ORIGIN|SEE BOX 15|SPRPA1|SEE BOX 7|SEE BOX 7|SEE SCHEDULE|SEE BOX 9|MIL-STD-129P|N/A|SEE BOX 9|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (JUL 2020))|3|||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3|||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)|13|336412|500|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||| EVALUATION CRITERIA AND BASIS FOR AWARD -|1|| This solicitation is being issued under SEPA Authority. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 . The contractor shall include on the detailed process/operation sheets developed, (1) all in house manufacturing processes and (2) the identity of all manufacturing sources performing processes/operations outside their facility. These sheets shall not be revised or altered after the successful completion of First Article or Production Lot Testing without approval from the Basic Design Engineering activity, via the PCO. 1.4 . Unless otherwise specified, for fabricated parts, the Inspection Method Sheets/ Final Inspection Sheets shall list the characteristics of each item produced under the contract. The manufacturer shall be required to provide certifications of all raw material including castings and forgings. the material source shall be identified and the documentation shall be able to identify the customer and/or contract number. The manufacturer shall maintain all raw material documentation for a minimum of ten (10) years. The contractor is responsible for providing completed Inspection Method Sheets/Final Inspection Sheets showing the actual dimensions taken for ALL Characteristics,in addition, critical characteristics shall be annotated. 1.5 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.6 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.7 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;80020; ) ;626960-3; , Revision ;K; and all details and specifications referenced therein. 1.8 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.9 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MISC-482400-0025 |80020| D| |D| | | | DRAWING DATA=MPR 10 |80020| F| |D| | | | DRAWING DATA=MPR 1072 |80020| | |D| | | | DRAWING DATA=MPR 1075 |80020| | |D| | | | DRAWING DATA=MPR 1223 |80020| C| |D| | | | DRAWING DATA=MPR 45 |80020| C| |D| | | | DRAWING DATA=NAEC-ENG-6518 |80020|BP| |D| | | | DRAWING DATA=12-50303 |80020|AE| |D| | | | DRAWING DATA=14-41941 |80020| K| |D| | | | DRAWING DATA=14-50700 |80020|AA| |D| | | | DRAWING DATA=416774 |80020| C| |D| | | | DRAWING DATA=417241 |80020| K| |D| | | | DRAWING DATA=417242 |80020| L| |D| | | | DRAWING DATA=417245 |80020| M| |D| | | | DRAWING DATA=425250 |80020| F| |D| | | | DRAWING DATA=427738 |80020| C| |D| | | | DRAWING DATA=504657 |80020| V| |D| | | | DRAWING DATA=509441 |80020|AB| |D| | | | DRAWING DATA=524237 |80020| B| |D| | | | DRAWING DATA=524238 |80020| G| |D| | | | DRAWING DATA=524239 |80020| A| |D| | | | DRAWING DATA=524240 |80020| F| |D| | | | DRAWING DATA=524276 |80020| B| |D| | | | DRAWING DATA=524277 |80020| A| |D| | | | DRAWING DATA=614942 |80020| R| |D| | | | DRAWING DATA=615055 |80020| G| |D| | | | DRAWING DATA=622266 |80020| H| |D| | | | DRAWING DATA=626960-3 |80020| K| |D| | | | DRAWING DATA=626962 |80020| H| |D| | | | DRAWING DATA=626963 |80020| F| |D| | | | DRAWING DATA=626964 |80020| B| |D| | | | DRAWING DATA=627366 |80020| G| |D| | | | DRAWING DATA=627409 |80020| E| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE 4.1 CRITICAL MANUFACTURING PROCESSES ( ;applies; ) HEAT TREAT ( ;applies; ) WELDING ( ; ; ) CADMIUM PLATING ( ;applies; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ;applies; ) FORGING(S) ( ;applies; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.2 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF ANY MINORS,MAJOR OR CRITICAL CHARACTERISTICS SHALL BE RECORDED. THE AMBEINT TEMPERATURE SHALL BE RECORDED AT TIME MEASUREMENTS ARE TAKEN. CERTIFICATIONS TO BE ON FILE FOR A MINIMUM OF SEVEN YEARS AFTER DELIVERY OF CONTRACT. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all criticl and/or requirements identified in the drawings, drawing notes, and process and Results shall consist of actual dimensions, measurements, and test outcomes and included in the First Article test report. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in paragraph 7a and satisfactory to the test and evaluation elements cited in paragraph 7.b shall constitute acceptance of the First Article. Acceptance/reject criteria: ii. Failure to meet any of the conditions in paragraph 7.a and 7.b shall be cause for rejection.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.3 SPECIAL INSPECTION REQUIREMENTS ( ;applies; ) MAGNETIC PARTICLE INSPECTION ( ;applies; ) SURFACE INSPECTION ( ;applies; ) PENETRANT INSPECTION ( ;applies; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.4 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA REP AT FAX (732) 323-4986; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 4.5 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;Pete Schoerner 732-323-2504; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ;Dimensional, ultrasonic and Penetrant inspection per 627366 after peening, prior to next assembly.Process qualification, operator certification, booth qualification, production bend tests, dimensional per MPR 1075. Dimensional and protective coating per 626963; ;Dimensional, Ultrasonic, Penetrant, Tensisle, Fracture Toughness, Axial Fatigueand crack growth IAW NAWCADLKE-MISC-482400-0025 per 627366 prior to peening.; ;Torque, Identification and final assembly inspection prior to next assembly per 626366.; ;Mag Particle IAW MPR 45, Hardness, chemical tension and charpy test IAW MPR 45 dimensional and identification per 14-50700-5 prior to assembly.; ;Dimensional, penetrant inspection IAW MPR 1072 and LKE-MISC-482400-0025 per 524238 prior to assembly; ;Chemical, Heat Treat, Tension and Charpy test IAW MPR 10 and dimensional magnetic particle, identification, inspections per 626963 prior to painting and Cu-Ni-In coating IAW MPR 1075.; 4.6 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.6.1 Dimensional test (special) ;CLOSE MACHINE TOLDERANCES; 4.6.2 Requirements of: ;LKE DRAWING PACKAGE; 4.6.3 Form ;APPLIES; 4.6.4 Fit ;N/A; 4.6.5 Function ;N/A; 4.6.6 Compliance with drawing ( ;80020; ) ;626960; , Revision ;K; and specifications referenced therein. 4.7 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.8 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.9 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.9.1 The QAR shall be present to witness all First Article Testing. 4.9.2 The following additional personnel shall witness the First Article Testing: ;ROY JANNEY NAWC QA REP AT FAX (732) 323-4986; 4.10 Disposition of FAT samples 4.10.1 ; ; Sample(s) may be destroyed during testing. 4.10.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.11 Test Sample Coating Instructions 4.11.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.12 Notice to Government of Testing at the contractors facility. 4.12.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;626960-3; ; , Revision ;K; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report ""First Article Test Report"" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.13 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.14 IN PROCESS INSPECTION REQUIREMENTS: Due to the critical nature of this item it is necessary to conduct in-process inspections on critical component features, attributes, or manufacturing processes. The contractor shall notify the PCO and NAWC via email or TELEFAX PCO and NAWC Lakehurst QA ;ROY JANNEY NAWC QA REP AT FAX (732) 323-4986; to arrange for the in-process inspection. A minimum of 10 days is needed for advance notice for each occurrence. The authority of the QAR shall not be abrogated. The QAR shall verify that timely notification was given all parties listed below. CHARACTERISICS TO BE INSPECTED: ;The follow item(s) requires an Interim Inspection at the contractor's location: i. Tensile, Fracture Toughness, Axial Fatigue, and Crack Growth Tests IAW NAWCAand Dimensional, Ultrasonic, and Penetrant inspections per Drawing 627366 prior to peening ii. Dimensional, Ultrasonic, and Penetrant inspections per Drawing 627366 afterpeening and prior to next assembly. iii. Torque, Identification, and Final Assembly inspection prior to next assembly per Drawing 626964. iv. Chemical, Heat Treat, Tension, and Charpy tests IAW MPR 10 and Dimensional,inspections per Drawing 626963 prior to paint and Cu-Ni-In coating IAW MPR 1075 v. Process Qualification, Operator Certification, Booth Qualification, Production Bend Tests and Dimensional Inpection per MPR 1075 and Dimensional Inspection and Protective Coatings per Drawing 626963 vi. Magnetic particle, Hardness, chemical, tension, and charpy test IAW MPR 45 inspections per Drawing 14-50700-5 prior to next assembly. vii. Dimensional inspection, Heat Treat, and Penetrant inspection IAW MPR 1072 and NAWCADLKE-MISC-482400-0025 per Drawing 524238 prior to next assembly.; ; The contractor shall assist on the conduct of the interim inspection(s) as described herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, ancontractor shall also provide sufficient rigging/material handling services and & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities and as a minimum, include inspection of all (100%) interim inspection requirements identified; ; ; ; ; ; ; ; ; 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (21-10010): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS ""CRITICAL"" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBM& BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. Unique Requirements: c. Inspection and recording of measurements shall be conducted as required by N627409, and 627366. d. Process Qualification and Operator Certification shall be submitted prior to production Plasma Spray Application begins IAW MPR 1075 per drawing 626963. e. (M101) Per note 1 of drawing 626960, piston assemblies, left and right, shall be matched sets, and the two assemblies of each set must weigh within 10 lbs. of each other. f. (M102) The scale weight of the piston assembly, expressed in pounds, shall be painted on the side of the barrel in two inch minimum letters, using black paint per note 2 of drawing 626960 g.(M103) Per note 9 of drawing 626960, each matched set of piston assemblies shall be packaged in a single container with the spear of one packed adjacent ALRE CSI parts require certification. When certified, an ALRE part is marked with a Material Identification Code (MIC) NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall be in the same methodology source as the drawing note for part marking, andaccall associated data. Application of MIC shall be in the same methodology as thein same area as part marking in same area as part marking (next to, above, or below). \ DATE OF FIRST SUBMISSION=400 DAC block 6: forward additional copy to aso code cited in block 10.A on page 1. FIRST ARTICLE REPORT ALL CERTIFICATIONS. TEST REPORTS, AND IN-PROCESS INSPECTION DOCUMENTS NEEDED TO SUBSTANTIATE PRODUCT QUALITY SHALL BE AVAILABLE WITH THE FIRST ARTICLE WHEN PRESENTED FOR INSPECTION AT CONTRACTORS FACILITY. NOTIFICATION OF 14 DAYS PRIOR TO PRESENTATION FOR INSPECTION MUST BE GIVEN TO ROY JANNEY NAWC QA AT FAX (732) 323-1381. Data Requirements: a. Copies of all approved requests for variation b. Weight for matched Piston Assembly Sets per Drawing 626960. c. Packaging requirements per Drawing 626960. d. Welding per Drawing 626960, 614942, e. Dimensional Inspection per Drawing 626960, 14-41941, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277,626963, 627409, 614942, 615055, 622266 f. Torque Requitements per Drawing 626960, 626964, g. Safety Wiring per Drawing 626960, h. Identification per Drawing 626960, 12-50303, 14-50700, 417241, 417242, 41724614942, 622266, 626964, 626963, 627409, i. Assembly inspection per Drawing 626960, j. Heat Treat IAW MPR 45 per Drawing 14-41941, k. Hardness Test IAW MPR 45 per Drawing 14-41941, l. Magnetic Particle inspect IAW MPR 45 per Drawing 14-41941, m. Chemical Composition Test IAW MPR 45 per Drawing 14-41941, n. Tensile Test IAW MPR 45 per Drawing 14-41941, o. Charpy Impact Test IAW MPR 45 per Drawing 14-41941, p. Heat Treat per Drawing 12-50303, 427738, 504657, 509441, 524237, 524238, 524277, 614942, q.Hardness Test per Drawing 12-50303, 504657, 509441, 524237, 524238,524239, 524239, 524240, 524276, 524277, 614942, 427738, 614942, r. Chrome Plate per Drawing 12-50303, 504657, s. Magnetic Particle inspect per Drawing 12-50303, 417241, 417242, 417245, 425250, 504657, 626963, 627409, t. Material Certifications per Drawing 12-50303, 416774, 417241, 417242, 417245, 524239, 524240, 524276, 524277, 614942, 626963, 627409, u. Strain Relief IAW MPR 510 per Drawing 416774. v. Penetrant Inpsect after Strain Relief IAW MPR 510 per Drawing 416774. w. Load Deflection Test after strain relief IAW MPR 510 per Drawing 416774. x. Dimension Inspection after AStrain Relif IAW MPR 510 per Drawing 416774. y. Nitride Harden per Drawing 417241, 417242, 417245,c z. Magnesium Phosphate coat per Drawing 425250. aa. Penetrant Inpsect per Drawing 427738, 524237, 524238, 524239, 524240, 524276, 524277, 622266, bb. Tensile test IAW NAWCADLKE-MISC-482400-0025 per Drawing 524237, cc. Fracture Toughness Tests IAW NAWCADLKE-MISC-482400-0025 per Drawing 524237,dd. Radiographic Inspection per Drawing 614942,ee. Chemical coatings per Drawing 622266, ff. Finish per Drawing 626963, 627409, gg. Plasma Spray IAW MPR 1075 per Drawing 626963, 627409, hh. Heat Treat IAW MPR 10 per Drawing 626963, 627409, ii. Chemical Composition IAW MPR 10 per Drawing 626963, 627409, jj. Tensile Tests IAW MPR 10 per Drawing 626963, 627409, kk. Charpy Tests IAW MPR 10 per Drawing 626963, 627409, ll. Hardness Tests IAW MPR 10 per Drawing 626963, 627409, mm. Magnetic Particle IAW MPR 10 per Drawing 626963, 627409, nn. Dimensional Inspection and recorded measurements IAW NAEC-ENG-6518 per Drawing 626963, 627409, and 627366 DATE OF FIRST SUBMISSION=ASREQ PRODUCTION REPORT / RECEIPT INSPECTION ALL CERTIFICATIONS. TEST REPORTS, AND IN-PROCESS INSPECTION DOCUMENTS NEEDED TO SUBSTANTIATE PRODUCT QUALITY SHALL BE SUBMITTED WITH PRODUCTION UNITS WHEN PRESENTED FOR RECEIPT INSPECTION AT CONTRACTORS FACILITY. NOTIFICATION OF 14 DAYS PRIOR TO PRESENTATION FOR INSPECTION MUST BE GIVEN TO ROY JANNEY NAWC QA AT FAX (732) 323-1381. Data Requirements: a. Copies of all approved requests for variation b. Weight for matched Piston Assembly Sets per Drawing 626960. c. Packaging requirements per Drawing 626960. d. Welding per Drawing 626960, 614942, e. Dimensional Inspection per Drawing 626960, 14-41941, 12-50303, 14-50700, 416774, 417241, 417242, 417245, 425250, 427738, 504657, 509441, 524237, 524238, 524239, 524240, 524276, 524277,626963, 627409, 614942, 615055, 622266 f. Torque Requitements per Drawing 626960, 626964, g. Safety Wiring per Drawing 626960, h. Identification per Drawing 626960, 12-50303, 14-50700, 417241, 417242, 41724614942, 622266, 626964, 626963, 627409, i. Assembly inspection per Drawing 626960, j. Heat Treat IAW MPR 45 per Drawing 14-41941, k. Hardness Test IAW MPR 45 per Drawing 14-41941, l. Magnetic Particle inspect IAW MPR 45 per Drawing 14-41941, m. Chemical Composition Test IAW MPR 45 per Drawing 14-41941, n. Tensile Test IAW MPR 45 per Drawing 14-41941, o. Charpy Impact Test IAW MPR 45 per Drawing 14-41941, p. Heat Treat per Drawing 12-50303, 427738, 504657, 509441, 524237, 524238, 524277, 614942, q.Hardness Test per Drawing 12-50303, 504657, 509441, 524237, 524238,524239, 524239, 524240, 524276, 524277, 614942, 427738, 614942, r. Chrome Plate per Drawing 12-50303, 504657, s. Magnetic Particle inspect per Drawing 12-50303, 417241, 417242, 417245, 425250, 504657, 626963, 627409, t. Material Certifications per Drawing 12-50303, 416774, 417241, 417242, 417245, 524239, 524240, 524276, 524277, 614942, 626963, 627409, u. Strain Relief IAW MPR 510 per Drawing 416774. v. Penetrant Inpsect after Strain Relief IAW MPR 510 per Drawing 416774. w. Load Deflection Test after strain relief IAW MPR 510 per Drawing 416774. x. Dimension Inspection after AStrain Relif IAW MPR 510 per Drawing 416774. y. Nitride Harden per Drawing 417241, 417242, 417245,c z. Magnesium Phosphate coat per Drawing 425250. aa. Penetrant Inpsect per Drawing 427738, 524237, 524238, 524239, 524240, 524276, 524277, 622266, bb. Tensile test IAW NAWCADLKE-MISC-482400-0025 per Drawing 524237, cc. Fracture Toughness Tests IAW NAWCADLKE-MISC-482400-0025 per Drawing 524237, dd. Radiographic Inspection per Drawing 614942, ee. Chemical coatings per Drawing 622266, ff. Finish per Drawing 626963, 627409, gg. Plasma Spray IAW MPR 1075 per Drawing 6269...
 
Web Link
SAM.gov Permalink
(https://beta.sam.gov/opp/5dc7cf14811a41008cc548c443823fef/view)
 
Record
SN06164668-F 20211028/211026230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.